Equinor – pipeline repair response on the Norwegian Continental ShelfPublished:
- Audit report
- Emergency preparedness
- Structural safety
- Equinor
-
ConocoPhillips – Ekofisk – materials handling, cranes and liftingPublished:
- Audit report
- Handling, cranes and lifting
- Ekofisk K
- Ekofisk B
- ConocoPhillips
-
Equinor – Mongstad – maintenancePublished:
- Audit report
- Risk management
- Structural safety
- Maintenance management
- Mongstad
- Equinor
-
Equinor – Sleipner and Sture – chemical managementPublished:
- Audit report
- Working environment
- Sleipner
- Equinor
- Sture
-
Equinor – Gullfaks A – selected OPS Groups, TI and competence centresPublished:
- Audit report
- Technical safety
-
Equinor – Johan Castberg – project auditPublished:
- Audit report
- Cyber security
- Process safety
- Project management
- Johan Castberg
- Equinor
-
Equinor – Åsgard C – process safetyPublished:
- Audit report
- Process safety
- Equinor
-
Aker BP - fabrication and assembly of cooling pipesPublished:
- Audit report
- Structural safety
- Aker BP
-
Order to Equinor - Snorre A - materials handling and work at heightPublished:
- Audit report
- Handling, cranes and lifting
- Equinor
- Snorre A
-
Equinor and Bilfinger – Oseberg – working environmentPublished:
- Audit report
- Working environment
- Oseberg A
- Oseberg B
- Oseberg D
- Oseberg H
-
AoC audit – Shelf Drilling Barsk – management auditPublished:
- Audit report
- Working environment
- Emergency preparedness
- Risk management
- Shelf Drilling Barsk
- Shelf Drilling
-
AoC audit – Shelf Drilling Barsk – structuresPublished:
- Audit report
- Structural safety
- Shelf Drilling Barsk
- Shelf Drilling
- Noble Lloyd Noble
-
IKM Testing – audit of temporary hiresPublished:
- Audit report
- Working environment
-
Aker BP – Noble Invincible - the alliance modelPublished:
- Audit report
- Working environment
- Well integrity
- Aker BP
-
Equinor – Troll B and Troll C – static flexible pipesPublished:
- Audit report
- Structural safety
- Equinor
- Troll B
- Troll C
-
Equinor – helideck management and follow-upPublished:
- Audit report
- Emergency preparedness
- Equinor
-
Equinor – Mongstad/onshore facilities – follow-up of surfaces programmePublished:
- Audit report
- Structural safety
- Equinor
- Mongstad
-
Aker BP – Valhall – well intervention and pumping operations at Valhall Flank WestPublished:
- Audit report
- Well integrity
- Aker BP
- Valhall Flanke Vest
-
ConocoPhillips Skandinavia AS – Eldfisk 2/7-SPublished:
- Audit report
- Emergency preparedness
- Handling, cranes and lifting
- ConocoPhillips
- Eldfisk S
-
Equinor/Floatel International - Floatel Endurance - investigation of unintentional gangway disconnectionPublished:
- Investigation report
- Structural safety
- Emergency preparedness
- Working environment
- Floatel International
- Floatel Endurance
- Equinor
- Martin Linge