Statoil - Transportnett Kårstø - PipelinesPublished:On 2 March 2016, the PSA carried out an audit of the operation and inspection of Statoil Transportnett pipelines at Kårstø.
- Barrier management
- Structural safety
- Risk management
- Maintenance management
-
Statoil - Gullfaks C - Drilling and well interventionPublished:The PSA has carried out an audit of how Statoil is meeting regulatory requirements relating to the use of a new method for drilling and well intervention at Gullfaks C.
- Well integrity
-
Esso - Slagentangen - Maintenance of safety-critical equipmentPublished:From 9 to 11 February 2016, the PSA conducted a major accident inspection and audit of safety-critical equipment maintenance at Slagentangen.
- Risk management
- Maintenance management
- Barrier management
-
Rowan - Rowan Viking - Logistics and emergency preparednessPublished:From 4 to 11 February 2016, the PSA carried out an audit of Rowan Norway Limited (Rowan) and the Rowan Viking facility in the domains of logistics and emergency preparedness.
- Emergency preparedness
-
Statoil - Johan Sverdrup - Project ManagementPublished:On 3 and 4 March 2016, the PSA carried out an audit of Statoil's management of the Johan Sverdrup project.
- Working environment
- Barrier management
- Structural safety
- Process safety
- Risk management
-
Statoil - Subsea facilitiesPublished:On 23 and 24 February 2016, the PSA carried out an audit of Statoil's specialist departments within the domain of subsea facilities.
- Maintenance management
- Structural safety
-
Aker BP - Valhall DP - Permanent plugging and abandonmentPublished:From 27 January to 3 March 2016, the Petroleum Safety Authority Norway (PSA) carried out an audit of BP's planning and execution of permanent plugging and abandonment (PP&A) of wells at Valhall DP.
- Well integrity
-
Statoil - Development & Production Norway (DPN) - Improvement activitiesPublished:Between 2012 and 2015, the Petroleum Safety Authority Norway (PSA) carried out an audit of improvement activities at Statoil.
- Working environment
- Risk management
-
Gassco and the onshore facilities – Major accident risk reductionPublished:During 2015, the PSA carried out audits of how the onshore facilities and Gassco are complying with the statutory requirements in respect of reducing the likelihood of a major accident.
- Risk management
-
Shell – Nyhamna – working environment and lifting operationsPublished:The PSA has carried out an audit of working environment conditions and crane and lifting operations at Nyhamna.
- Working environment
- Handling, cranes and lifting