HSE impacts, consequences and opportunities from external power supply to petroleum facilitiesPublished:personnel required on board. Improved physical working environment. Reduced risk of gas leaks and fires. Simpler and faster completion in the project phase. Simpler removal. We will be elaborating on the
- Project report
- Process safety
- Electrical installations
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Audit report
- Structural safety
- Process safety
- Statoil
- Visund
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Audit report
- Cyber security
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Audit report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Equinor – Åsgard A – technical and operational barriers for pipes, process systems and structural elementsPublished:in compliance with the HSE regulations. Result One non-conformity was identified. This concerned: Fire water supply We also observed four factors that we have chosen to categorise as improvement points
- Audit report
- Structural safety
- Process safety
- Equinor
- Åsgard A
-
Equinor – Heidrun – technical safety, process safety and electrical facilitiesPublished:we identified non-conformities within the following areas: Barriers Fixed firefighting facilities Fire doors Follow-up of non-conformities Marking of the arc flash energy level of panels In addition, we
- Audit report
- Technical safety
- Process safety
- Electrical installations
- Equinor
- Heidrun
-
Vår Energi – Jotun FPSO – modification projectPublished:Alternative to central control room Independence of emergency shutdown function Start-up arrangements for fire pump drives We also identified an improvement point concerning systematic follow-up of alarms. What
- Audit report
- Process safety
- Risk management
- Electrical installations
- Jotun A
- Vår Energi
-
Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Audit report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Equinor – Kvitebjørn – emergency preparedness and helideckPublished:board Location of workstation for maritime surveillance Maintenance of MOB boat suits Siting of the fire stations Redundancy in the absence of lifeboat coxswain What happens now? We have asked Equinor to
- Audit report
- Emergency preparedness
- Equinor
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Audit report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Audit report
- Equinor
- Grane
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Audit report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Smashing of a cabin window by bad weather on Åsgard APublished:Equinor on the day it occurred. Stormy conditions have been blamed for the incident. The remains of a fire cabinet discovered inside the cabin suggests that it was responsible for smashing the window. Following
- News
- Structural safety
- Emergency preparedness
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Audit report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor
-
Total - Martin Linge - Production facility engineeringPublished:identified one non-conformity associated with the depressurisation of pressure tanks in the case of fire. In addition, two improvement points were identified concerning clarity and consistency in governing
- Audit report
- Technical safety
- Process safety
- Total E&P Norge
- Martin Linge
-
Vår Energi – Goliat FPSO – management of technical barriers and maintenancePublished:Six non-conformities were identified, concerning: Barrier management Non-conformity handling Passive fire protection Overpressure protection Maintenance programme Procedures In addition, three improvement
- Audit report
- Barrier management
- Maintenance management
- Goliat FPSO
-
Statoil - Grane - Electrical installations and Technical safetyPublished:electrical installations Emergency power system Transient voltage variations Emergency lighting The fire water system Non-conformity handling In addition, improvement points were detected in connection with:
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Grane
-
ExxonMobil - Ringhorne - Management of emergency preparednessPublished:preparedness management out on the facility. We also commented on an issue concerning the siting of the fire station's cabinet for search and rescue teams. We have given ExxonMobil a deadline of 8 May 2017 to
- Audit report
- Emergency preparedness
- ExxonMobil
- Ringhorne
-
Statoil - Songa Offshore - Troll field - Drilling and well activitiesPublished:Intersecting wellbores Risk analyses Capacity and competence in Statoil's Troll organisation Well/fire service companies In addition, two improvement points were identified in connection with: Application
- Audit report
- Working environment
- Well integrity
- Statoil
- Troll B
- Troll C
- Songa Endurance
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Audit report
- Process safety
- Maintenance management
- Technical safety
- Equinor