Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Inspection report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil
- Gullfaks A
-
Premier Oil - Bream - Project management, risk management and technical barriersPublished:Risk-reduction principles System for barrier management Transfer of experience Topside layout Passive fire protection
- Inspection report
- Risk management
- Technical safety
- Barrier management
- Premier Oil
-
Total - Martin Linge - Production facility engineeringPublished:identified one non-conformity associated with the depressurisation of pressure tanks in the case of fire. In addition, two improvement points were identified concerning clarity and consistency in governing
- Inspection report
- Technical safety
- Process safety
- Total E&P Norge
- Martin Linge
-
Equinor - Johan Sverdrup - Process safetyPublished:were identified. Two improvement points were identified in connection with: The philosophy behind fire integrity of the flare system Calculation of test intervals for instrumented process safety functions
- Inspection report
- Process safety
- Johan Sverdrup
- Equinor
- Statoil
-
Statoil - Gina Krog - Barriers, technical safety, electrical facilities, working environment and materials handlingPublished:connection with: Roles and responsibilities Enterprise of competence Use of composite deck gratings Fire water supply Chemicals Statoil has been given a deadline of 19 March 2018 to report on how the non-conformity
- Inspection report
- Barrier management
- Technical safety
- Electrical installations
- Working environment
- Handling, cranes and lifting
- Statoil
- Gina Krog
-
Statoil - Åsgard A - Integrity and barrier managementPublished:improvement points were identified in connection with: Integration of structures – barrier system Passive fire protection Routines for critical operations Competence management Alarm management by the central
- Inspection report
- Barrier management
- Structural safety
- Maintenance management
- Statoil
- Åsgard A
-
ConocoPhillips - Eldfisk B - Management of technical barriersPublished:non-conformity handling, work descriptions for function testing, testing of the firewater system, fire walls and documentation. In addition, an improvement point was identified relating to the performance
- Inspection report
- Barrier management
- Maintenance management
- Technical safety
- Process safety
- Electrical installations
- ConocoPhillips
- Eldfisk B
-
Equinor - Sleipner - Corrosion under insulation (CUI)Published:addition, three improvement points were identified in connection with: Testing of the firewater system Fire divisions Information about risks associated with working on insulation stripping for CUI inspections
- Inspection report
- Structural safety
- Maintenance management
- Sleipner
- Equinor
- Statoil
-
Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Inspection report
- Technical safety
- Risk management
- Equinor
- Grane
-
Vår Energi – Balder FPU – major accident risk and barriers during operationPublished:regulatory non-conformities. These concerned: Documentary basis for management of major accident risk Fire and explosion resistance We also identified two improvement points. These concerned: Capacity in the
- Inspection report
- Process safety
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Equinor - Gina Krog - Integrity and barrier managementPublished:non-conformities were identified relating to Follow-up of defined performance requirements Passive fire protection Non-conformity handling Systematic follow-up of valves What happens next? Equinor has been
- Inspection report
- Structural safety
- Process safety
- Equinor
- Gina Krog
-
Aker BP – Alvheim – risk and barrier management of stability incidentsPublished:and drills Working hours and workload Competence in respect of lifeboat 5 Non-self-closing doors in fire walls. We also observed one factor that we have chosen to categorize as an improvement point. This
- Inspection report
- Risk management
- Barrier management
- Structural safety
- Aker BP
- Alvheim FPSO
-
Statoil - Gina Krog - Barrier managementPublished:improvement points were identified relating to: The barrier management system The emergency shutdown system Fire pumps
- Inspection report
- Barrier management
- Statoil
- Gina Krog
-
Transocean Offshore ltd - Transocean Arctic - Emergency preparedness -and Working environmentPublished:measures Training and composition of the emergency preparedness organisation Emergency preparedness plan Fire stations Barriers In addition, improvement points were identified in connection with: Roles and responsibilities
- Inspection report
- Working environment
- Emergency preparedness
- Barrier management
- Transocean Offshore Ltd
- Transocean Arctic
-
Saipem - Scarabeo 8 - Maintenance and barriersPublished:management Emergency lighting In addition, improvement points were identified in connection with: Barriers Fire extinguishing systems Monitoring and control Competence and training Maintenance follow-up Saipem
- Inspection report
- Barrier management
- Saipem
- Scarabeo 8
-
Rowan - Rowan Viking - Logistics and emergency preparednessPublished:technical factors. Result Four non-conformities were identified in connection with: Crushing hazards Fire stations Life jackets Competence and training In addition, seven improvement points were identified
- Inspection report
- Emergency preparedness
- Rowan
- Rowan Viking
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Inspection report
- Process safety
- Equinor
- Snorre B
-
Re § 9 Acceptance criteria for major accident risk and environmental riskanalyses and risk assessments carried out. Major accident means an acute incident such as a major spill, fire or explosion that immediately or subsequently entails multiple serious personal injuries and/or loss
- Guideline