Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil
- Gullfaks A
-
Vår Energi – Goliat FPSO – management of technical barriers and maintenancePublished:Six non-conformities were identified, concerning: Barrier management Non-conformity handling Passive fire protection Overpressure protection Maintenance programme Procedures In addition, three improvement
- Inspection report
- Barrier management
- Maintenance management
- Goliat FPSO
-
Total - Martin Linge - Production facility engineeringPublished:identified one non-conformity associated with the depressurisation of pressure tanks in the case of fire. In addition, two improvement points were identified concerning clarity and consistency in governing
- Inspection report
- Technical safety
- Process safety
- Total E&P Norge
- Martin Linge
-
ExxonMobil - Ringhorne - Management of emergency preparednessPublished:preparedness management out on the facility. We also commented on an issue concerning the siting of the fire station's cabinet for search and rescue teams. We have given ExxonMobil a deadline of 8 May 2017 to
- Inspection report
- Emergency preparedness
- ExxonMobil
- Ringhorne
-
Vår Energi – Goliat – management of technical barriers and maintenancePublished:non-conformity had not been addressed in line with the company’s feedback to us: Non-conformity concerning “Fire water supply” from chapter 5.1 of the report following the audit of 1 July 2015. Result No new non-conformities
- Inspection report
- Process safety
- Risk management
- Technical safety
- Barrier management
- Goliat FPSO
- Vår Energi
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Inspection report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor
-
Statoil - Grane - Electrical installations and Technical safetyPublished:electrical installations Emergency power system Transient voltage variations Emergency lighting The fire water system Non-conformity handling In addition, improvement points were detected in connection with:
- Inspection report
- Electrical installations
- Technical safety
- Statoil
- Grane
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Inspection report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
Rowan – Rowan Norway – emergency preparednessPublished:domain of emergency preparedness for Rowan Norway. Result Non-conformities were identified relating to: Fire protection Lifeboats Helicopter deck Signage and marking of evacuation routes Escape from lifts In
- Inspection report
- Emergency preparedness
- Rowan
-
Statoil - Songa Offshore - Troll field - Drilling and well activitiesPublished:Intersecting wellbores Risk analyses Capacity and competence in Statoil's Troll organisation Well/fire service companies In addition, two improvement points were identified in connection with: Application
- Inspection report
- Working environment
- Well integrity
- Statoil
- Troll B
- Troll C
- Songa Endurance
-
Statoil - Gina Krog - Barrier managementPublished:improvement points were identified relating to: The barrier management system The emergency shutdown system Fire pumps
- Inspection report
- Barrier management
- Statoil
- Gina Krog
-
Equinor - Johan Sverdrup - Process safetyPublished:were identified. Two improvement points were identified in connection with: The philosophy behind fire integrity of the flare system Calculation of test intervals for instrumented process safety functions
- Inspection report
- Process safety
- Johan Sverdrup
- Equinor
- Statoil
-
Equinor – Troll A – management of major accident risk and barriersPublished:concerned: Uncertainties in documents describing the organisational model Moisture in emergency lighting Fire resistance Explosion pressure Site-specific expertise What happens now? We have asked Equinor to report
- Inspection report
- Process safety
- Barrier management
- Risk management
- Troll A
- Equinor
-
Equinor - Gina Krog - Integrity and barrier managementPublished:non-conformities were identified relating to Follow-up of defined performance requirements Passive fire protection Non-conformity handling Systematic follow-up of valves What happens next? Equinor has been
- Inspection report
- Structural safety
- Process safety
- Equinor
- Gina Krog
-
Saipem - Scarabeo 8 - Maintenance and barriersPublished:management Emergency lighting In addition, improvement points were identified in connection with: Barriers Fire extinguishing systems Monitoring and control Competence and training Maintenance follow-up Saipem
- Inspection report
- Barrier management
- Saipem
- Scarabeo 8
-
Statoil - Gina Krog - Barriers, technical safety, electrical facilities, working environment and materials handlingPublished:connection with: Roles and responsibilities Enterprise of competence Use of composite deck gratings Fire water supply Chemicals Statoil has been given a deadline of 19 March 2018 to report on how the non-conformity
- Inspection report
- Barrier management
- Technical safety
- Electrical installations
- Working environment
- Handling, cranes and lifting
- Statoil
- Gina Krog
-
Rowan - Rowan Viking - Logistics and emergency preparednessPublished:technical factors. Result Four non-conformities were identified in connection with: Crushing hazards Fire stations Life jackets Competence and training In addition, seven improvement points were identified
- Inspection report
- Emergency preparedness
- Rowan
- Rowan Viking
-
Statoil - Åsgard A - Integrity and barrier managementPublished:improvement points were identified in connection with: Integration of structures – barrier system Passive fire protection Routines for critical operations Competence management Alarm management by the central
- Inspection report
- Barrier management
- Structural safety
- Maintenance management
- Statoil
- Åsgard A
-
Transocean Offshore ltd - Transocean Arctic - Emergency preparedness -and Working environmentPublished:measures Training and composition of the emergency preparedness organisation Emergency preparedness plan Fire stations Barriers In addition, improvement points were identified in connection with: Roles and responsibilities
- Inspection report
- Working environment
- Emergency preparedness
- Barrier management
- Transocean Offshore Ltd
- Transocean Arctic
-
ConocoPhillips - Eldfisk B - Management of technical barriersPublished:non-conformity handling, work descriptions for function testing, testing of the firewater system, fire walls and documentation. In addition, an improvement point was identified relating to the performance
- Inspection report
- Barrier management
- Maintenance management
- Technical safety
- Process safety
- Electrical installations
- ConocoPhillips
- Eldfisk B