Equinor - Heidrun - Process facility and transport systemPublished:From 17 to 21 September 2018, we carried out an audit of the process facility and transport system at Heidrun.
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
-
Mongstad - Major accident auditPublished:We have carried out an audit of Equinor Mongstad. This was a major accident audit on the topics of emergency preparedness, follow-up of non-conformities and improvement points from last year’s major accident audit, and implementation of new requirements i
- Risk management
- Emergency preparedness
-
KCA Deutag/Equinor - Askeladden - Logistics and drilling operationsPublished:From 3 to 9 September 2018 we carried out an audit of KCAD’s and Equinor’s logistics and drilling operations using Askeladden on the Gullfaks field.
- Well integrity
- Handling, cranes and lifting
-
Wood – employee participationPublished:We have carried out an audit of Wood (formerly Wood Group Norway) and the company’s own follow-up of the arrangements for genuine employee participation.
- Working environment
-
Spirit Energy and Maersk - Drilling and well operationsPublished:On 21 and 22 August and 3 to 5 September 2018, we carried out an audit of Spirit Energy and Maersk Drilling focused on the planning and execution of drilling and well operations on the Oda field using Maersk Interceptor.
- Well integrity
-
Neptune - Fenja - Fabrication of production pipesPublished:We have carried out an audit of Neptune Energy Norge AS (Neptune) focused on the fabrication of production pipes for Fenja.
- Process safety
- Structural safety
-
Norisol Norge AS - Notifications of censurable conditions at workPublished:The Petroleum Safety Authority Norway (PSA) and the Norwegian Labour Inspection Authority have jointly audited Norisol’s routines for handling notifications of censurable conditions (whistleblowing) at work.
- Working environment
-
Gassco - Nyhamna - Alarm load and human factors in the central control roomPublished:We have carried out an audit of Gassco focused on alarm load and human factors in the central control room at Nyhamna.
- Working environment
- Process safety
-
ConocoPhillips - Ekofisk - Corrosion under insulation (CUI)Published:From 20 August to 5 September 2018, we carried out an audit of passive fire protection, corrosion under insulation (CUI) including surface treatment and repairs under insulation, as well as sheathing at Ekofisk 2/4 J (EKOJ).
- Process safety
- Structural safety
-
Audit of Aker BP – employee participationPublished:We have carried out an audit of Aker BP and the company’s own follow-up of arrangements for genuine employee participation.
- Working environment