OMV - Drilling in the far north - Risk-reduction processes relating to site-specific anchoring analyses and assessmentsPublished:On 27 and 28 May 2015, the PSA carried out an audit of OMV's drilling in the High North, with an emphasis on risk-reduction processes relating to site-specific anchoring analyses and assessments.
- Structural safety
-
Odfjell Drilling - Deepsea Bergen - Structural safetyPublished:On 9 and 10 June 2015, the Petroleum Safety Authority Norway carried out an audit of the onshore organisation of Odfjell Drilling in the domain of structural safety.
- Structural safety
-
Shell - Nyhamna - Scaffolding, management and maintenancePublished:From 27 to 30 April 2015, the PSA carried out an audit of the management of health, safety and the environment (HSE) relating to the planning and performance of scaffolding work at Nyhamna.
- Risk management
- Maintenance management
-
Statoil - Grane - Lifting equipment and maintenance managementPublished:From 11 to 13 May 2015, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil's control and management of materials handling, the technical condition of lifting equipment and the company's management of lifting equipment maintenance.
- Well integrity
- Handling, cranes and lifting
- Maintenance management
-
ConocoPhillips - Ekofisk 2/4-L - Environmental data collectionPublished:From 5 to 7 May 2015, the PSA, in collaboration with the Norwegian Meteorological Institute, carried out an audit of ConocoPhillips' management of environmental data collection at the Ekofisk Centre.
- Technical safety
- Maintenance management
-
Statoil og Maersk Drilling Norge AS - Maersk Gallant - Drilling operationsPublished:Between 16 and 20 March 2015, the PSA carried out an audit of Statoil and Maersk Drilling concerning HPHT drilling operations at the 2/4-22 Romeo and 2/4-23 Julius exploration wells using Maersk Gallant.
- Working environment
- Well integrity
- Barrier management
-
Shell - Nyhamna - Barrier management and risk managementPublished:On 11 May 2015, the Petroleum Safety Authority Norway (PSA) carried out an audit of Shell and the development project at Nyhamna within the disciplines of barrier management and risk management.
- Barrier management
- Risk management
-
Statoil - Åsgard A - BarriersPublished:From 23 to 26 March 2015, the Petroleum Safety Authority Norway (PSA) performed an audit of the Ã…sgard A facility.
- Barrier management
- Risk management
-
Order for Statoil - Oseberg B and Gullfaks C - Drilling and wellPublished:The PSA has issued an order to Statoil following audits at Oseberg B and Gullfaks C.
- Well integrity
-
Shell - Non-conformity handlingPublished:On 6 March 2015, the Petroleum Safety Authority Norway carried out an audit of Norske Shell's non-conformity handling.
- Emergency preparedness
- Well integrity
- Structural safety