Gassco/Norske Shell – Nyhamna – emergency preparednessPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station What happens now? We have asked Gassco to report to us by 17 January 2025 on how the non-conformities
- Audit report
- Emergency preparedness
- Gassco
- Nyhamna
- Shell
-
Total - Martin Linge - Technical safety Electrical facilities and Maintenance managementPublished:improvement points were identified in relation to: Response time for deluge Design report for active fire-extinguishing systems Test procedures for emergency lighting Marking of plant, systems and equipment
- Audit report
- Technical safety
- Electrical installations
- Maintenance management
- Barrier management
- Total E&P Norge
- Martin Linge
-
AoC audit – Odfjell Drilling – Deepsea Yantai – emergency preparedness, the helideck and drinking waterPublished:suits Securing of escape route Escape from lift Corridors and passages Illumination of escape route Fire doors in living quarters In addition, an improvement point was identified relating to emergency response
- Audit report
- Emergency preparedness
- Deepsea Yantai
- Odfjell Drilling AS
-
Gassco - Kårstø - Investigation into gas leakPublished:possible ignition of the gas leak, where parts of a gas-transporting pipe could have been exposed to jet fire and heat radiation. If personnel had been in the proximity of the leak in the event of ignition, this
- Investigation report
- Emergency preparedness
- Structural safety
- Process safety
- Gassco
- Kårstø
- Kvitebjørn
-
AoC – Odfjell Drilling – Deepsea Bollsta – technical safetyPublished:identified 10 non-conformities. These concerned: Barrier management Operational barrier elements Passive fire protection Escalation prevention Shutdown of MF/HF radio station after emergency shutdown Documentation
- Audit report
- Process safety
- Technical safety
- Odfjell Drilling AS
- West Bollsta
-
Repsol/Maersk Drilling – Yme – electrical facilities, safety instrumented systems, process safety and technical safetyPublished:facilities Electrical safety during completion Weaknesses in safety systems Non-conformity handling Passive fire protection We also identified improvement points relating to the following systems and areas: Competence
- Audit report
- Electrical installations
- Process safety
- Technical safety
- Repsol
- Maersk Inspirer
-
Repsol - Gyda - Electrical installations, safety instrumented systems and maintenance managementPublished:operation of electrical facilities. We also observed improvement points linked to emergency lighting, fire and gas detection, maintenance management and barrier management. We have asked Repsol to report to
- Audit report
- Electrical installations
- Technical safety
- Maintenance management
- Gyda
- Repsol
-
Rowan – Rowan Stavanger – management of emergency preparedness and helideck operationsPublished:identified 14 non-conformities in respect of the helideck. These comprised: Lack of procedure for sampling fire water/foam mixture Failure to monitor degradation of safety netting/perimeter netting attachment Some
- Audit report
- Emergency preparedness
- Risk management
- Rowan Stavanger
- Rowan
-
Order to Equinor following audit of Martin Linge APublished:non-conformities. The improvement points concerned start-up arrangements for emergency generators and fire pumps, training and drills and overpressure protection. In addition, we found a non-conformity from
- Audit report
- Electrical installations
- Process safety
- Technical safety
- Equinor
- Martin Linge
-
Order to Vår Energi - GoliatPublished:related to fire dampers (see item 5.1.1 in the audit report). Nonconformities and improvement points The audit identified nonconformities in the following areas (numbers refer to the report): fire dampers
- Audit report
- Electrical installations
- Goliat FPSO
- Vår Energi
- Eni Norge
-
Equinor – Heimdal – investigation of work accidentPublished:occurred while filling (pressurising) a 3.4-litre nitrogen gas cylinder, which formed part of the fire extinguishing system on the platform and was to be pressurised to 200 barg using a booster pump. During
- Investigation report
- Working environment
- Process safety
- Emergency preparedness
- Heimdal
- Equinor
-
Order to Equinor – Norne – technical safety, electrical systems, automation and risk managementPublished:maintenance Deficient planning and prioritisation Defective follow-up of the alarm systems Passive fire protection Deficient labelling of facilities, systems and equipment We also observed one factor that
- Audit report
- Barrier management
- Process safety
- Norne FPSO
- Equinor
-
Order to Gassco and Statoil - Kårstø - Electrical plant and Major accident riskPublished:equipment Work in and operation of electrical installations Protection against ignition and the spread of fire Emergency lighting Maintenance of explosion-proof equipment Notification of hazard and accident situations
- Audit report
- Process safety
- Technical safety
- Risk management
- Gassco
- Kårstø
- Kvitebjørn
-
Order to Repsol – YmePublished:Inadequate maintenance management Deficiencies in gas detection Lack of periodic testing of logic for fire and gas detectors. Deficiencies in the emergency shutdown system Inadequate documentation In addition
- Audit report
- Process safety
- Repsol
- Maersk Inspirer
-
Order to Saipem Drilling - Scarabeo 8Published:area (SDLA) Technical conditions The audit also detected improvement points relating to: Readiness of fire stations Lifting forum What happens now? On the basis of our observations in the audit, we have now
- Audit report
- Emergency preparedness
- Handling, cranes and lifting
- Maintenance management
- Saipem
- Scarabeo 8
-
Order to Rowan – audit of electrical installations and technical safety on Rowan NorwayPublished:regulatory breaches in the following areas: internal follow-up barrier management ignition source control fire doors and passive protection lighting in the emergency hospital technical conditions with electrical
- Audit report
- Electrical installations
- Technical safety
- Rowan
- Rowan Stavanger
-
Order and coercive fine for Gassco – electrical facilities and safety instrumented systems – the Draupner facilitiesPublished:monitor the company's work on barrier elements relating to ignition source control, ventilation (HVAC), fire and gas detection systems, emergency shutdown system, emergency power and emergency lighting. In addition
- Audit report
- Electrical installations
- Draupner
- Gassco
- Elektriske anlegg
-
Order to Equinor – Norne FPSO – risk and barrier managementPublished:capacity and expertise obstacles in emergency exits assessing the consequences of the worst process fire. The improvement points covered: management’s responsibility for following up and ensuring understanding
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Equinor
- Norne FPSO
-
Order to Seadrill - West HerculesPublished:environment risk and employee participation Management of emergency preparedness training on board Fire stations Man-over-board preparedness Contents of cabinets marked with emergency equipment What happens
- Audit report
- Working environment
- Seadrill
- West Hercules
-
Order to Transocean Services AS – Transocean SpitsbergenPublished:system Ignition source control Ventilation system Selectivity in UPS system Emergency lighting Passive fire protection Refuelling installation Documentation of pressure and function testing Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- Well integrity
- Transocean Offshore Ltd
- Transocean Spitsbergen