Norske Shell - Nyhamna - Technical safety and barrier managementPublished:Petroleumstilsynet (Ptil) gjennomførte i perioden 20.-22.5.2014 tilsyn med detaljprosjektering og barrierestyring av Nyhamnautvidelse-prosjektet hos Kværner.
- Barrier management
- Technical safety
-
COSL Drilling - COSLPromoter - Risk managementPublished:Between 24 June and 3 July 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of COSL Drilling Europe A/S (CDE) and the company's operations using the COSLPromoter drilling facility.
- Risk management
-
BP Norge AS - UlaPublished:From 11 to 13 June 2014, the Petroleum Safety Authority Norway (PSA), with specialist assistance from Telenor Maritim Radio, Radioinspeksjonen, carried out an audit of the Ula facility.
- Emergency preparedness
-
Statoil - COSL Innovator - Managed pressure drillingPublished:From 10 to 13 June 2014, the Petroleum Safety Authority Norway carried out an audit of Statoil's use of managed pressure drilling using COSL Innovator on the Troll field.
- Well integrity
-
Statoil - Aasta Hansteen - OHAS managementPublished:From 3 to 25 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil's engineering of the Aasta Hansteen facility.
- Working environment
-
Statoil - Heimdal - Monitoring of major-accident and OHAS riskPublished:From 24 March to 18 June 2014, the PSA carried out an audit of Statoil Petroleum AS (Statoil)'s monitoring of major-accident and OHAS risk associated with a modular drilling rig (MDR) in temporary use for well plugging at the Heimdal facility.
- Working environment
- Risk management
-
GDF SUEZ - Gjøa - Barrier management, process safety, technical safety and electrical installationsPublished:From 5 to 8 May 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of GDF SUEZ E&P Norge AS (GDF) on board the Gjøa facility.
- Barrier management
- Process safety
- Technical safety
- Electrical installations
-
Statoil - Tjeldbergodden - Electrical installationsPublished:From 11 to 13 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of electrical installations at Tjeldbergodden.
- Electrical installations
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:On 17 and 18 June 2014, the Petroleum Safety Authority Norway carried out an audit of Rowan Norway Limited and Rowan Gorilla VI within the disciplines of maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency p
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
-
Statoil - Statfjord C - Barrier managementPublished:From 23 to 25 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil's barrier management at Statfjord C.
- Barrier management