Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
Wintershall - Brage - Barrier managementPublished:The PSA has carried out an audit of Wintershall's barrier management at Brage.
- Process safety
-
Statoil - Oseberg H - Configuration and preparations for usePublished:The PSA has carried out an audit of Statoil's configuration and preparations for use of Oseberg H.
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Well integrity
- Risk management
-
Lundin - The company's own follow-upPublished:From 6 to 16 September 2016, the PSA carried out an audit of Lundin, focused on the company's own follow-up.
- Risk management
- Structural safety
-
Statoil - Johan Sverdrup - Procurement - Design - Fabrication of construction detailsPublished:The PSA has carried out an audit of the procurement, design and fabrication of construction details for Johan Sverdrup.
- Structural safety
-
Total - Martin Linge - Construction of the living quartersPublished:The PSA has carried out an audit of Total's management of the construction of the living quarters for Martin Linge.
- Working environment
- Emergency preparedness
-
Esso - Slagentangen - Electrical installationsPublished:The PSA has carried out an audit of electrical installations at Slagentangen.
- Electrical installations
- Maintenance management
-
Songa Offshore - Songa Equinox - Barrier managementPublished:From 22 to 26 August 2016, the PSA carried out an audit of Songa Offshore's overall barrier management on Songa Equinox and the interaction between operational, organisational and technical barrier elements.
- Barrier management
- Working environment
- Emergency preparedness
- Well integrity
-
Stena Drilling - Stena Don - Blowout preventer (BOP) and control functionsPublished:From 19 to 22 September 2016, the PSA carried out an audit of the blowout preventer (BOP) and control functions on Stena Don following upgrading and installation of a new BOP.
- Well integrity
- Maintenance management
-
Statoil - Njord A - Load-bearing structures and maritime systemsPublished:On 29 and 30 September 2016, the PSA carried out an audit of Statoil in respect of early-phase assessments and analyses of load-bearing structures and maritime systems at Njord A.
- Structural safety
-
Statoil - Mongstad - Follow-up of incidentsPublished:The PSA has carried out an audit of Statoil’s follow-up of the incidents at Mongstad in June in which a lathe bit became detached from a lathe during machining and a loading arm was inadvertently decoupled.
- Emergency preparedness