Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
Spirit Energy – Maersk InterceptorPublished:On 4 and 5 June 2018, we carried out the site-specific analyses of load-bearing structures on Maersk Interceptor for use on the Oda field.
- Structural safety
-
ConocoPhillips - Ekofisk 2/4 M og Z - Working environmentPublished:From 11 to 19 April 2018 we carried out an audit of ConocoPhillips Scandinavia AS (COPSAS)'s management of working environment risk and arrangements for employee participation at Ekofisk 2/4 M and Z.
- Working environment
-
OSM Offshore AS - Haven - Electrical facilities, technical safety and maintenance managementPublished:From 14 to 16 May 2018, we carried out an audit of OSM Offshore AS (OSM) in the areas of electrical facilities, technical safety and maintenance management at Haven.
- Maintenance management
- Technical safety
- Electrical installations
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:From 23 April to 30 May 2018, we carried out an audit of Equinor’s follow-up of the preconditions for consent to expand the lifetime of Statfjord C (SFC).
- Working environment
- Process safety
-
Equinor - Kårstø - Working environment and arrangements for genuine employee participationPublished:From 2 to 4 May 2018, we carried out an audit of Equinor’s management of risk factors in the working environment and arrangements for genuine employee participation at Kårstø.
- Working environment
-
Equinor - Snorre A - Flexible risers and systems for pressure safety/emergency shutdownPublished:From 23 to 27 April 2018, we carried out an audit of integrity and barrier management for flexible risers and systems for pressure safety/emergency shutdown at Snorre A.
- Structural safety
- Barrier management
-
Equinor Johan CastbergPublished:On 24 and 25 May 2018, we carried out an audit of design engineering and verification of sea ice loads on the Johan Castberg facility.
-
Equinor - Martin Linge - Working environment in the living quartersPublished:We have carried out an audit of Equinor Energy AS (Equinor) and the working environment in the living quarters at Martin Linge.
- Working environment
-
Teekay - Petrojarl Knarr FPSO - Working environment and arrangements for employee participationPublished:From 5 to 8 March 2018, we carried out an audit of Teekay Petrojarl Production AS (Teekay)’s management of risk factors in the working environment and arrangements for employee participation on Petrojarl Knarr FPSO (Knarr).
- Working environment
-
Point Resources - Balder - Management of emergency preparednessPublished:We have carried out an audit of Point Resources and their management of emergency preparedness at the Balder facility.
- Emergency preparedness