Objective

The objective of the audit was to verify that Statoil is catering for the requirements in the regulations relating to technical safety and safe operations.

Result

One non-conformity was identified in connection with pressure relief.

In addition, improvement points were identified in connection with:

  • Improvement of technical weaknesses
  • Fire load in the process area
  • Documentation
  • Flare overloading
  • Pressure relief valves
  • Total Risk Analysis (TRA)