What are you looking for?
420 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Equinor – Tjeldbergodden – investigation of turbine breakdown and firePublished:investigation of turbine breakdown and fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the incident involving a turbine breakdown with subsequent fire in the methanol plant at Tjeldbergodden
- Investigation report
- Process safety
- Technical safety
- Maintenance management
- Emergency preparedness
- Working environment
- Equinor
- Tjeldbergodden
-
Seadrill - West Phoenix - Investigation into firePublished:Seadrill - West Phoenix - Investigation into fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the fire in the mud laboratory on West Phoenix of 5 November 2018. Several
- Investigation report
- Electrical installations
- Emergency preparedness
- West Phoenix
-
Saipem - Scarabeo 5 - Investigation of firePublished:Investigation of fire The PSA has completed its investigation of the fire which broke out on the mobile unit Scarabeo 5 during 22 November 2016. The PSA has completed its investigation of the fire which broke
- Investigation report
- Handling, cranes and lifting
- Process safety
- Scarabeo 5
- Saipem
-
Statoil - Statfjord A - Investigation of firePublished:Statoil - Statfjord A - Investigation of fire The PSA has completed its investigation of the fire which broke out in the utility shaft on Statfjord A on 16 October 2016. Breaches of the regulations have
- Investigation report
- Emergency preparedness
- Electrical installations
- Structural safety
- Technical safety
- Maintenance management
- Statoil
- Statfjord A
- Statoil
- Statfjord A
-
Equinor – Gina Krog – investigation of fire in equipment roomPublished:Equinor – Gina Krog – investigation of fire in equipment room The Norwegian Ocean Industry Authority (Havtil) has completed its investigation of the incident involving fire in an equipment room on Gina Krog
- Investigation report
- Process safety
- Working environment
- Emergency preparedness
- Equinor
- Gina Krog
-
Teekay Petrojarl Production - Petrojarl Knarr - Investigation of firePublished:Petrojarl Production - Petrojarl Knarr - Investigation of fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of a fire on Petrojarl Knarr during 24 March 2015. A number of breaches
- Investigation report
- Emergency preparedness
- Process safety
- Petrojarl Knarr
- Teekay
-
Equinor – Åsgard B – investigation of incident with firePublished:– Åsgard B – investigation of incident with fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a fire in a high-voltage transformer on the Åsgard
- Investigation report
- Electrical installations
- Technical safety
- Emergency preparedness
- Equinor
- Åsgard B
-
Equinor – consent to install new connection pointPublished:point is to prepare for the export of gas from Goliat, via the Snøhvit gas pipeline, and on to Hammerfest LNG. The connection to the Snøhvit gas pipeline will be carried out using a Hot Tap concept, which
- Consent
- Well integrity
-
Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental dataPublished:– Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental data Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under
- Audit report
- Structural safety
- Technical safety
- Equinor
- Johan Sverdrup
-
Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:with short circuit and fire pump breakdown The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a transformer short circuit and a fire pump breakdown on the
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Addressed three topics in senior management meeting with EquinorPublished:questions are being raised about the legality of contracts with temporary-work agencies for Melkøya/Hammerfest LNG. The key principle is that all employees – regardless of form of employment – must have a safe
- News
- Working environment
- Risk management
-
Order to halt work at height - Consto Anlegg NordPublished:Authority (Havtil) has issued Consto Anlegg Nord AS with an order to halt all work at height at Hammerfest LNG facility in order to protect the lives and health of the workers. The Norwegian Ocean Industry
- News
- Handling, cranes and lifting
- Working environment
- Scaffolding
-
Close to the sea, but separatePublished:the Norwegian Environment Agency. Hammerfest LNG Melkøya, Hammerfest local authority, Finnmark Operator: Equinor Hammerfest LNG lies on Melkøya, an island in Hammerfest local authority, and is the processing
- Feature
-
Equinor – Statfjord A – Investigation of incident involving fire and fumes in tankPublished:incident involving fire and fumes in tank The Norwegian Ocean Industry Authority (Havtil) has concluded its investigation of an incident which occurred on 17 April 2024 involving fire and fumes in a tank
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Equinor
- Statfjord A
-
Re § 36 Firewater supplynecessary to supply all fire-fighting equipment in the onshore facility's largest fire area with one fire pump out of operation and necessary additional capacity to ensure that the fire does not spread to other
- Guideline
- Technical and operational regulations
-
Series of accidents arouse concernPublished:Johan Castberg project Valaris - Rowan Stavanger - BOP, component came loose Equinor - Hammerfest LNG - turbine fire Neptune/Odfjell - Gjøa - well control incident Seadrill - West Bollsta - dropped object
- News
-
Eni Norge - Goliat FPSO - Technical and operational barriersPublished:operational organisation at Hammerfest. On 7 and 8 May 2015, the Petroleum Safety Authority Norway carried out an audit of Eni Norge (Eni)'s operational organisation at Hammerfest. The objective of the audit
- Audit report
- Barrier management
- Eni Norge
- Goliat FPSO
-
§ 36 Firewater supplycombat fires and prevent spreading. The firewater system shall be designed such that a pressure stroke does not make all or part of the system inoperative. It shall be possible to activate fire pumps manually
- Paragraph
- Technical and operational regulations
-
§ 36 Firewater supplyof firewater to combat fires and suppress gas explosions if this can result in lower explosion pressure, cf. Section 37. Manned facilities shall have firewater supply from fire pumps or other independent
- Paragraph
- The facilities regulations
-
Re § 33 Emergency shutdown systemcompartmentalise the fire areas on the facility means, inter alia, that a sufficient number of sectionalising valves shall be installed in the processing facility to ensure that any fire load in the event
- Guideline
- The facilities regulations