Seadrill - West Phoenix - Investigation into firePublished:Seadrill - West Phoenix - Investigation into fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the fire in the mud laboratory on West Phoenix of 5 November 2018. Several
- Investigation report
- Electrical installations
- Emergency preparedness
- West Phoenix
-
Equinor – Åsgard B – investigation of incident with firePublished:– Åsgard B – investigation of incident with fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a fire in a high-voltage transformer on the Åsgard
- Investigation report
- Electrical installations
- Technical safety
- Emergency preparedness
- Equinor
- Åsgard B
-
Teekay Petrojarl Production - Petrojarl Knarr - Investigation of firePublished:Petrojarl Production - Petrojarl Knarr - Investigation of fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of a fire on Petrojarl Knarr during 24 March 2015. A number of breaches
- Investigation report
- Emergency preparedness
- Process safety
- Petrojarl Knarr
- Teekay
-
Close to the sea, but separatePublished:the Norwegian Environment Agency. Hammerfest LNG Melkøya, Hammerfest local authority, Finnmark Operator: Equinor Hammerfest LNG lies on Melkøya, an island in Hammerfest local authority, and is the processing
- Feature
-
Order to Equinor - Tjeldbergodden - investigation of turbine breakdown and firePublished:– Tjeldbergodden – investigation of turbine breakdown and fire Order to Equinor - Tjeldbergodden - investigation of turbine breakdown and fire The Petroleum Safety Authority Norway (PSA) has completed
- Investigation report
- Process safety
- Technical safety
- Maintenance management
- Emergency preparedness
- Working environment
- Equinor
- Tjeldbergodden
-
Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental dataPublished:– Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental data Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under
- Inspection report
- Structural safety
- Technical safety
- Equinor
- Johan Sverdrup
-
Order to Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:investigation of incident with short circuit and fire pump breakdown Order to Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdown The Petroleum Safety Authority Norway
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Order to Equinor – Statfjord A – Investigation of incident involving fire and fumes in tankPublished:– Statfjord A – Investigation of incident involving fire and fumes in tank Order to Equinor – Statfjord A – Investigation of incident involving fire and fumes in tank The Norwegian Ocean Industry Authority
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Equinor
- Statfjord A
-
Series of accidents arouse concernPublished:Johan Castberg project Valaris - Rowan Stavanger - BOP, component came loose Equinor - Hammerfest LNG - turbine fire Neptune/Odfjell - Gjøa - well control incident Seadrill - West Bollsta - dropped object
- News
-
Eni Norge - Goliat FPSO - Technical and operational barriersPublished:operational organisation at Hammerfest. On 7 and 8 May 2015, the Petroleum Safety Authority Norway carried out an audit of Eni Norge (Eni)'s operational organisation at Hammerfest. The objective of the audit
- Inspection report
- Barrier management
- Eni Norge
- Goliat FPSO
-
Equinor – Troll C – technical safety, process safety and electrical facilitiesPublished:out maintenance programme Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also identified four improvement points concerning: Documentation Marking
- Inspection report
- Process safety
- Electrical installations
- Technical safety
- Troll C
- Equinor
-
2010s: Hot and cold in the far northPublished:capacity at Hammerfest LNG. “Gas pipeline operator Gassco is now assessing opportunities for and the consequences of expanding such exports, both via the pipeline system to Europe and by increasing LNG capacity
- Feature
- Emergency preparedness
- Risk management
-
Re § 36 Firewater supplynecessary to supply all fire-fighting equipment in the onshore facility's largest fire area with one fire pump out of operation and necessary additional capacity to ensure that the fire does not spread to other
- Guideline
- Technical and operational regulations
-
§ 36 Firewater supplyof firewater to combat fires and suppress gas explosions if this can result in lower explosion pressure, cf. Section 37. Manned facilities shall have firewater supply from fire pumps or other independent
- Paragraph
- The facilities regulations
-
Equinor – Statfjord C – process safety, technical safety, maintenance management and risk managementPublished:Barrier management Risk management Maintenance management Overpressure protection and flaring capacity Fire integrity Firefighting Open drainage system Work on pressurised hydrocarbon-carrying systems and other
- Inspection report
- Process safety
- Technical safety
- Maintenance management
- Risk management
- Equinor
- Statfjord C
-
§ 36 Firewater supplycombat fires and prevent spreading. The firewater system shall be designed such that a pressure stroke does not make all or part of the system inoperative. It shall be possible to activate fire pumps manually
- Paragraph
- Technical and operational regulations
-
1990s: Shifting to the seabedPublished:multiphase flow technology, gas and condensate can be piped 143 kilometres from this field to the Hammerfest LNG plant on the north Norwegian coast. Subsea factories Technology developed in the 1990s laid
- Feature
- Structural safety
- Process safety
-
Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Inspection report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
Re § 33 Emergency shutdown systemcompartmentalise the fire areas on the facility means, inter alia, that a sufficient number of sectionalising valves shall be installed in the processing facility to ensure that any fire load in the event
- Guideline
- The facilities regulations
-
§ 70 Helicopter deckoffshore helicopter decks (in Norwegian only). Equipment for fire-fighting on the helicopter deck shall be designed and placed such that fires on the helicopter deck, both on and inside helicopters, can
- Paragraph
- The facilities regulations