Equinor - Hammerfest LNG - Management of operational riskPublished:Equinor - Hammerfest LNG - Management of operational risk Equinor - Hammerfest LNG - Management of operational risk We have carried out an audit of Equinor focused on the management of operational risk
- Inspection report
- Risk management
- Equinor
- Statoil
- Melkøya
-
Statoil - Hammerfest LNG - Major accident auditPublished:Statoil - Hammerfest LNG - Major accident audit Statoil - Hammerfest LNG - Major accident audit The PSA has carried out a major accident audit of Hammerfest LNG. The PSA has carried out a major accident
- Inspection report
- Process safety
- Risk management
- Barrier management
- Statoil
- Melkøya
-
Equinor – Hammerfest LNG – working environment risk and employee participationPublished:Equinor – Hammerfest LNG – working environment risk and employee participation The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and their management of working environment
- Inspection report
- Working environment
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Investigation of hydrocarbon leakPublished:Statoil - Hammerfest LNG - Investigation of hydrocarbon leak The hydrocarbon leak at the Hammerfest LNG facility in northern Norway on 5 January 2014 had a big accident potential and could have led to
- Investigation report
- Emergency preparedness
- Process safety
- Melkøya
- Statoil
-
Equinor – Hammerfest LNG – materials handling, cranes and lifting, and maintenancePublished:Equinor – Hammerfest LNG – materials handling, cranes and lifting, and maintenance Equinor – Hammerfest LNG – materials handling, cranes and lifting, and maintenance The Petroleum Safety Authority Norway
- Inspection report
- Emergency preparedness
- Risk management
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Cranes lifting and Working environmentPublished:Statoil - Hammerfest LNG - Cranes lifting and Working environment Statoil - Hammerfest LNG - Cranes lifting and Working environment From 7 to 9 March 2017, we carried an audit of the Hammerfest LNG plant.
- Inspection report
- Working environment
- Handling, cranes and lifting
- Maintenance management
- Statoil
- Melkøya
-
Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG.Published:for Hammerfest LNG. Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG. Statoil has received consent for the co-location of office facilities on Melkøya for Hammerfest LNG. Statoil
- Consent
- Operations, maintenance, modifications
-
Order to Equinor – Hammerfest LNG – materials handling and work at heightPublished:Equinor – Hammerfest LNG – materials handling and work at height Order to Equinor – Hammerfest LNG – materials handling and work at height The Norwegian Ocean Industry Authority (Havtil) has carried out
- Inspection report
- Handling, cranes and lifting
- Equinor
- Melkøya
-
Equinor – Hammerfest LNG – alarm load and workload in control room, and working hoursPublished:Equinor – Hammerfest LNG – alarm load and workload in control room, and working hours The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on alarm load and workload
- Inspection report
- Equinor
- Melkøya
-
Equinor – Hammerfest LNG – major accident audit and audit of start-up preparationsPublished:Equinor – Hammerfest LNG – major accident audit and audit of start-up preparations The Petroleum Safety Authority Norway (PSA) has carried out a major accident audit and an audit of Equinor’s start-up
- Inspection report
- Process safety
- Equinor
- Melkøya
-
Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valvesPublished:Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valves The Petroleum Safety Authority Norway (PSA) resolved in March 2019 to investigate an incident at Equinor’s Hammerfest LNG (HLNG)
- Investigation report
- Barrier management
- Technical safety
- Working environment
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilitiesPublished:Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities We have carried out a major accident
- Inspection report
- Process safety
- Emergency preparedness
- Electrical installations
- Statoil
- Melkøya
-
Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulationPublished:Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation On 1 and
- Inspection report
- Maintenance management
- Statoil
- Melkøya
-
Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control roomPublished:Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room From 14 to 16 May
- Inspection report
- Working environment
- Process safety
- Melkøya
- Equinor
- Statoil
-
Equinor – consent to install new connection pointPublished:point is to prepare for the export of gas from Goliat, via the Snøhvit gas pipeline, and on to Hammerfest LNG. The connection to the Snøhvit gas pipeline will be carried out using a Hot Tap concept, which
- Consent
- Well integrity
-
Re § 31 Fire divisionsFire divisions 31 Fire divisions with coated or sprayed-on fire protection material that does not fulfil the requirements for incombustibility, can be used if an overall assessment indicates that this
- Guideline
- Technical and operational regulations
-
§ 31 Fire divisionsFire divisions 31 The main areas of onshore facilities shall be separated so that they can withstand the design fire and explosion loads. Rooms and other defined areas with important functions and important
- Paragraph
- Technical and operational regulations
-
§ 29 Passive fire protectionPassive fire protection 29 Where passive fire protection is used, this shall be designed such that it provides relevant structures and equipment with sufficient fire resistance as regards load capacity
- Paragraph
- The facilities regulations
-
Re § 30 Fire divisionsFire divisions 30 For fire divisions in living quarters, see Section 31. For determination of fire and explosion loads as mentioned in the first and second subsections, see Section 11. Worst credible
- Guideline
- The facilities regulations
-
§ 30 Passive fire protectionPassive fire protection 30 Where passive fire protection is used, this shall be designed such that it provides relevant structures and equipment with sufficient fire resistance as regards load capacity
- Paragraph
- Technical and operational regulations