Equinor - Snøhvit and Hammerfest LNG - Operation and maintenancePublished:Equinor - Snøhvit and Hammerfest LNG - Operation and maintenance Equinor - Snøhvit and Hammerfest LNG - Operation and maintenance We have carried out an audit of Equinor and its operation and maintenance
- Inspection report
- Structural safety
- Risk management
- Maintenance management
- Equinor
- Melkøya
-
Order to Equinor – Hammerfest LNG – major accident and electrical installationsPublished:Order to Equinor – Hammerfest LNG – major accident and electrical installations The Petroleum Safety Authority Norway (PSA) has audited Equinor ASA with regard to major accidents and electrical installations
- Inspection report
- Process safety
- Electrical installations
- Melkøya
- Equinor
-
Statoil - Hammerfest LNG - Major accident auditPublished:Statoil - Hammerfest LNG - Major accident audit Statoil - Hammerfest LNG - Major accident audit The PSA has carried out a major accident audit of Hammerfest LNG. The PSA has carried out a major accident
- Inspection report
- Process safety
- Risk management
- Barrier management
- Statoil
- Melkøya
-
Equinor - Hammerfest LNG - Management of operational riskPublished:Equinor - Hammerfest LNG - Management of operational risk Equinor - Hammerfest LNG - Management of operational risk We have carried out an audit of Equinor focused on the management of operational risk
- Inspection report
- Risk management
- Equinor
- Statoil
- Melkøya
-
Equinor – Hammerfest LNG – alarm management system in control roomPublished:Equinor – Hammerfest LNG – alarm management system in control room The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its management of responsibilities for, competence
- Inspection report
- Technical safety
- Working environment
- Equinor
- Melkøya
-
Order to Equinor – Hammerfest LNG – ensure and document prudence of activities before resumption of workPublished:Order to Equinor – Hammerfest LNG – ensure and document prudence of activities before resumption of work The Norwegian Ocean Industry Authority (Havtil) has issued an order to Equinor to ensure and document
- News
-
Equinor – Hammerfest LNG – safety systems and the company's follow-up of SIL in operationsPublished:Equinor – Hammerfest LNG – safety systems and the company's follow-up of SIL in operations Equinor – Hammerfest LNG – safety systems and the company's follow-up of SIL in operations The Norwegian Ocean
- Inspection report
- Process safety
- Equinor
- Melkøya
-
Order to Equinor – Hammerfest LNG – materials handling and work at heightPublished:Equinor – Hammerfest LNG – materials handling and work at height Order to Equinor – Hammerfest LNG – materials handling and work at height The Norwegian Ocean Industry Authority (Havtil) has carried out
- Inspection report
- Handling, cranes and lifting
- Equinor
- Melkøya
-
Equinor – Hammerfest LNG – alarm load and workload in control room, and working hoursPublished:Equinor – Hammerfest LNG – alarm load and workload in control room, and working hours The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on alarm load and workload
- Inspection report
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilitiesPublished:Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities We have carried out a major accident
- Inspection report
- Process safety
- Emergency preparedness
- Electrical installations
- Statoil
- Melkøya
-
Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valvesPublished:Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valves The Petroleum Safety Authority Norway (PSA) resolved in March 2019 to investigate an incident at Equinor’s Hammerfest LNG (HLNG)
- Investigation report
- Barrier management
- Technical safety
- Working environment
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulationPublished:Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation On 1 and
- Inspection report
- Maintenance management
- Statoil
- Melkøya
-
Equinor – Hammerfest LNG – major accident audit and audit of start-up preparationsPublished:Equinor – Hammerfest LNG – major accident audit and audit of start-up preparations The Petroleum Safety Authority Norway (PSA) has carried out a major accident audit and an audit of Equinor’s start-up
- Inspection report
- Process safety
- Equinor
- Melkøya
-
Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG.Published:for Hammerfest LNG. Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG. Statoil has received consent for the co-location of office facilities on Melkøya for Hammerfest LNG. Statoil
- Consent
- Operations, maintenance, modifications
-
Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control roomPublished:Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room From 14 to 16 May
- Inspection report
- Working environment
- Process safety
- Melkøya
- Equinor
- Statoil
-
Equinor – Sleipner B – investigation of firePublished:Equinor – Sleipner B – investigation of fire The Norwegian Ocean Industry Authority (Havtil) has completed the investigation of the fire incident on the Sleipner B facility on 22 October 2024. We have
- Investigation report
- Emergency preparedness
- Electrical installations
- Process safety
- Equinor
-
Addressed three topics in senior management meeting with EquinorPublished:questions are being raised about the legality of contracts with temporary-work agencies for Melkøya/Hammerfest LNG. The key principle is that all employees – regardless of form of employment – must have a safe
- News
- Working environment
- Risk management
-
Mongstad firePublished:Havtil investigates Mongstad fire Mongstad fire The Norwegian Ocean Industry Authority (Havtil) has launched an investigation into a short-circuit with subsequent fire and smoke development in a substation
- News
- Process safety
- Working environment
-
Re § 30 Fire divisionsFire divisions 30 For fire divisions in living quarters, see Section 31. For determination of fire and explosion loads as mentioned in the first and second subsections, see Section 11. Worst credible
- Guideline
- The facilities regulations
-
§ 30 Passive fire protectionPassive fire protection 30 Where passive fire protection is used, this shall be designed such that it provides relevant structures and equipment with sufficient fire resistance as regards load capacity
- Paragraph
- Technical and operational regulations