What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
ConocoPhillips - Eldfisk B - Management of technical barriersPublished:non-conformity handling, work descriptions for function testing, testing of the firewater system, fire walls and documentation. In addition, an improvement point was identified relating to the performance
- Audit report
- Barrier management
- Maintenance management
- Technical safety
- Process safety
- Electrical installations
- ConocoPhillips
- Eldfisk B
-
Statoil - Åsgard A - Integrity and barrier managementPublished:improvement points were identified in connection with: Integration of structures – barrier system Passive fire protection Routines for critical operations Competence management Alarm management by the central
- Audit report
- Barrier management
- Structural safety
- Maintenance management
- Statoil
- Åsgard A
-
Statoil - Gina Krog - Barriers, technical safety, electrical facilities, working environment and materials handlingPublished:connection with: Roles and responsibilities Enterprise of competence Use of composite deck gratings Fire water supply Chemicals Statoil has been given a deadline of 19 March 2018 to report on how the non-conformity
- Audit report
- Barrier management
- Technical safety
- Electrical installations
- Working environment
- Handling, cranes and lifting
- Statoil
- Gina Krog
-
Equinor - Johan Sverdrup - Process safetyPublished:were identified. Two improvement points were identified in connection with: The philosophy behind fire integrity of the flare system Calculation of test intervals for instrumented process safety functions
- Audit report
- Process safety
- Johan Sverdrup
- Equinor
- Statoil
-
Smashing of a cabin window by bad weather on Åsgard APublished:Equinor on the day it occurred. Stormy conditions have been blamed for the incident. The remains of a fire cabinet discovered inside the cabin suggests that it was responsible for smashing the window. Following
- News
- Structural safety
- Emergency preparedness
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Audit report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor
-
Statoil - Grane - Electrical installations and Technical safetyPublished:electrical installations Emergency power system Transient voltage variations Emergency lighting The fire water system Non-conformity handling In addition, improvement points were detected in connection with:
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Grane
-
ExxonMobil - Ringhorne - Management of emergency preparednessPublished:preparedness management out on the facility. We also commented on an issue concerning the siting of the fire station's cabinet for search and rescue teams. We have given ExxonMobil a deadline of 8 May 2017 to
- Audit report
- Emergency preparedness
- ExxonMobil
- Ringhorne
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Audit report
- Maintenance management
- Statoil
- Gullfaks A
-
Total - Martin Linge - Production facility engineeringPublished:identified one non-conformity associated with the depressurisation of pressure tanks in the case of fire. In addition, two improvement points were identified concerning clarity and consistency in governing
- Audit report
- Technical safety
- Process safety
- Total E&P Norge
- Martin Linge
-
Equinor - Gina Krog - Integrity and barrier managementPublished:non-conformities were identified relating to Follow-up of defined performance requirements Passive fire protection Non-conformity handling Systematic follow-up of valves What happens next? Equinor has been
- Audit report
- Structural safety
- Process safety
- Equinor
- Gina Krog
-
Transocean Offshore ltd - Transocean Arctic - Emergency preparedness -and Working environmentPublished:measures Training and composition of the emergency preparedness organisation Emergency preparedness plan Fire stations Barriers In addition, improvement points were identified in connection with: Roles and responsibilities
- Audit report
- Working environment
- Emergency preparedness
- Barrier management
- Transocean Offshore Ltd
- Transocean Arctic
-
Saipem - Scarabeo 8 - Maintenance and barriersPublished:management Emergency lighting In addition, improvement points were identified in connection with: Barriers Fire extinguishing systems Monitoring and control Competence and training Maintenance follow-up Saipem
- Audit report
- Barrier management
- Saipem
- Scarabeo 8
-
Rowan - Rowan Viking - Logistics and emergency preparednessPublished:technical factors. Result Four non-conformities were identified in connection with: Crushing hazards Fire stations Life jackets Competence and training In addition, seven improvement points were identified
- Audit report
- Emergency preparedness
- Rowan
- Rowan Viking
-
Statoil - Gina Krog - Barrier managementPublished:improvement points were identified relating to: The barrier management system The emergency shutdown system Fire pumps
- Audit report
- Barrier management
- Statoil
- Gina Krog
-
Aker BP – Alvheim – risk and barrier management of stability incidentsPublished:and drills Working hours and workload Competence in respect of lifeboat 5 Non-self-closing doors in fire walls. We also observed one factor that we have chosen to categorize as an improvement point. This
- Audit report
- Risk management
- Barrier management
- Structural safety
- Aker BP
- Alvheim FPSO
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Audit report
- Process safety
- Equinor
- Snorre B
-
Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Audit report
- Technical safety
- Risk management
- Equinor
- Grane
-
Vår Energi – Balder FPU – major accident risk and barriers during operationPublished:regulatory non-conformities. These concerned: Documentary basis for management of major accident risk Fire and explosion resistance We also identified two improvement points. These concerned: Capacity in the
- Audit report
- Process safety
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Aker BP – Valhall Flank North – emergency preparedness and helideckPublished:addition, two improvement points were identified, concerning: Use of resources for developing procedures Fire station and lifeboats for ensuring rapid and efficient evacuation and rescue What happens next? We
- Audit report
- Aker BP
- Valhall Flanke Nord