What are you looking for?
413 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Equinor - Sleipner - Corrosion under insulation (CUI)Published:addition, three improvement points were identified in connection with: Testing of the firewater system Fire divisions Information about risks associated with working on insulation stripping for CUI inspections
- Inspection report
- Structural safety
- Maintenance management
- Sleipner
- Equinor
- Statoil
-
Aker BP – Alvheim – risk and barrier management of stability incidentsPublished:and drills Working hours and workload Competence in respect of lifeboat 5 Non-self-closing doors in fire walls. We also observed one factor that we have chosen to categorize as an improvement point. This
- Inspection report
- Risk management
- Barrier management
- Structural safety
- Aker BP
- Alvheim FPSO
-
Vår Energi – Balder FPU – major accident risk and barriers during operationPublished:regulatory non-conformities. These concerned: Documentary basis for management of major accident risk Fire and explosion resistance We also identified two improvement points. These concerned: Capacity in the
- Inspection report
- Process safety
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Inspection report
- Technical safety
- Risk management
- Equinor
- Grane
-
Aker BP – Valhall Flank North – emergency preparedness and helideckPublished:addition, two improvement points were identified, concerning: Use of resources for developing procedures Fire station and lifeboats for ensuring rapid and efficient evacuation and rescue What happens next? We
- Inspection report
- Aker BP
- Valhall Flanke Nord
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Inspection report
- Process safety
- Equinor
- Snorre B
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Inspection report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Inspection report
- Cyber security
- Statoil
-
RNNP 2007: Good development, but several serious incidentsPublished:2007 is statistically significant. Fires that are not linked to hydrocarbon leaks are among the major accident indicators that show a stabile level. Three such fires were reported last year, compared with
- News
- RNNP
-
Re § 10 Prudent operationswhich apply to both the health and safety areas. For onshore facilities, reference is also made to the Fire and Explosion Protection Act (in Norwegian only). For health-related matters, reference is made to
- Guideline
- The framework regulations
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Inspection report
- Electrical installations
- Technical safety
- West Bollsta
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Inspection report
- Emergency preparedness
- Haven
-
How are the regulations structured?Published:provisions is conferred by the Working Environment Act. In addition come the Pollution Control Act, the Fire and Explosion Protection Act and a number of health-related statutes. Norway’s oil and gas industry
- Article
-
Evaluating the effect of PSA investigationsPublished:incident with dropped riser joint Equinor – Tjeldbergodden – investigation of turbine breakdown and fire Equinor – Gullfaks C - investigation of oil spill KCA Deutag – Askeladden – investigation of incident
- News
- Risk management
-
Use of standards to promote safety in petroleum activities in the ArcticPublished:the use of standards in regulation: Drilling and well design in the Arctic Technical regulation of fire safety, especially in the extreme cold Evacuation and emergency preparedness, especially taking into
- Project report
- Risk management
- Well integrity
- Process safety
- Emergency preparedness
- High north
-
Equinor – Oseberg H – use of vessel with gangwayPublished:requirements of the Offshore Operation Manager, activation of emergency shutdown of Oseberg H, assessment of fire on the gangway-equipped vessel and competency requirements of gangway operators. What happens now
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Oseberg H
- Equinor
-
Odfjell – Deepsea Atlantic – risk management, electrical facilities and safety instrumented systemsPublished:management Handling of non-conformities Ignition source control Ventilation system Firefighting Passive fire protection Open drainage Emergency lighting Lithium ion battery system Electrical facilities and installations
- Inspection report
- Process safety
- Risk management
- Electrical installations
- Technical safety
- Deepsea Atlantic
- Odfjell Drilling AS
-
Eni Norge - Goliat - Electrical installationsPublished:identified in connection with: Gas detectors of HVAC intakes and ducts Organisation of electrical staff Fire detectors and manual activation of electrical isolation Test method for heating cables Personnel responsible
- Inspection report
- Electrical installations
- Process safety
- Eni Norge
- Goliat FPSO
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Inspection report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Inspection report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk