Vår Energi – Jotun FPSO – modification projectPublished:Alternative to central control room Independence of emergency shutdown function Start-up arrangements for fire pump drives We also identified an improvement point concerning systematic follow-up of alarms. What
- Inspection report
- Process safety
- Risk management
- Electrical installations
- Jotun A
- Vår Energi
-
Regulations relating to technical and operational matters at onshore facilities in the petroleum activities, etc2002 No. 20 relating to protection against fire, explosion and accidents with dangerous substances and relating to the fire department's rescue tasks (the Fire and Explosion Protection Act), Section 10-18
- Regulation
-
AoC audit – Odfjell Drilling – Deepsea Yantai – Electrical facilities and technical safetyPublished:modifications Electrotechnical system analyses The fire water system Area classification and associated requirements Inadequate ignition source decoupling Pneumatic fire doors Emergency lighting installation Emergency
- Inspection report
- Electrical installations
- Technical safety
- Odfjell Drilling AS
-
§ 5 Design of facilitiesRegulations. The facilities shall be divided into main areas. The main areas shall be separated by fire and explosion divisions or sufficient physical distance to prevent escalation. Alternatively, a combination
- Paragraph
- The facilities regulations
-
Neptune Energy – Gjøa – follow-up of ongoing projectsPublished:point. The non-conformities concerned deficiencies in fixed fire-fighting facilities and a lack of assessment of new knowledge concerning fires. The improvement point concerned overpressure protection. Follow-up
- Inspection report
- Technical safety
- Process safety
- Electrical installations
- Neptune Energy
- Gjøa
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Inspection report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Order to Equinor following investigation of the Johan Castberg projectPublished:identified, and Equinor h Johan Castberg lies in the Barents Sea, 240 kilometres north-west of Hammerfest. The field is being developed with a floating production, storage and offloading (FPSO) facility
- Investigation report
- Structural safety
- Risk management
- Johan Castberg
- Equinor
-
Equinor – Tjeldbergodden – emergency response and major accidentsPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station. What happens next? We have asked Equinor to report by 20 December 2024 on how the non-conformities
- Inspection report
- Emergency preparedness
- Risk management
- Tjeldbergodden
- Equinor
-
Regulations relating to design and outfitting of facilities, etc. in the petroleum activitiesDNV-OS-D202, Automation, safety and telecommunication systems, Edition January 2017, DNV-OS-D301, Fire protection, Edition January 2017, DNV-OS-E101, Drilling facilities, Edition July 2021, DNV-OS-E201
- Regulation
-
Equinor – Gullfaks B – corrosion under insulationPublished:comply with company and regulatory requirements. Result We identified one non-conformity concerning fire protection of a structure. We also identified four improvement points. These concerned: Pipe insulation
- Inspection report
- Structural safety
- Equinor
- Gullfaks B
-
§ 33 Emergency shut-down systemhydrocarbons and chemicals to and from the onshore facility, and which isolate the onshore facility's fire areas. 612-1033-F2025_1-33
- Paragraph
- Technical and operational regulations
-
§ 33 Emergency shutdown systemand chemicals to and from the facility and to and from wells, and which isolate and/or partition the fire areas on the facility. 634-1033-F2025_1-33
- Paragraph
- The facilities regulations
-
§ 10a Ignition source controldo so from a central or strategic location, in accordance with the facility specific strategy for fire and explosion safety. 634-1033-F2025_1-10a
- Paragraph
- The facilities regulations
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Inspection report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Inspection report
- Process safety
- Ula DP
- Aker BP
-
Okea – Draugen – major accident risk and barriersPublished:These comprised: Basis for evaluating the effectiveness of maintenance Training and exercises Passive fire protection of fluid outlet separators Marking of equipment What happens next? We have asked Okea to
- Inspection report
- Barrier management
- Process safety
- Draugen
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Inspection report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Inspection report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Inspection report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr