What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Statoil - Kvitebjørn - Management of barriersPublished:requirements. Resultat Four non-conformities were identified in connection with: Design loads for fire Pressure control equipment Alarm load in central control room Transfer of experience In addition,
- Audit report
- Barrier management
- Statoil
-
Equinor – Gudrun – non-conformity handlingPublished:factor that we have chosen to categorise as an improvement point. This concerned: Inadequate passive fire protection What happens now? We have asked Equinor to give us its assessment of the improvement point
- Audit report
- Equinor
- Gudrun
-
Shell - Draugen - Management of technical barriersPublished:management Modification projects Result Four non-conformities were identified in connection with: Process fires Performance requirements Firewater system Warning and notification of hazard and accident situations
- Audit report
- Technical safety
- Barrier management
- Shell
- ShellEnterprise
- Draugen
-
Aker BP – Edvard Grieg – HVAC and exhaust systemsPublished:workshop and stores Deficient maintenance We also identified three improvement points. These concerned: Fire damper test Training/drills in OBE (Operational Barrier Element) Non-conformity handling What happens
- Audit report
- Process safety
- Aker BP
- Edvard Grieg
-
Equinor – Gullfaks B – holistic risk and barrier management, and robust operation and maintenancePublished:Result In the audit, we identified five non-conformities. These comprised: Barrier management Passive fire protection Escape routes from rooms for high voltage installations Risk analyses Risk reduction We
- Audit report
- Barrier management
- Risk management
- Equinor
- Gullfaks B
-
AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – electrical facilities, technical safety and ICT securityPublished:Ignition source control Ventilation systems Emergency power systems Emergency lighting Fire fighting Passive fire protection Electrical facilities and installations Work in and operation of electrical
- Audit report
- Process safety
- Cyber security
- Electrical installations
- Technical safety
- Odfjell Drilling AS
- Deepsea Aberdeen
-
Regulations relating to technical and operational matters at onshore facilities in the petroleum activities, etc2002 No. 20 relating to protection against fire, explosion and accidents with dangerous substances and relating to the fire department's rescue tasks (the Fire and Explosion Protection Act), Section 10-18
- Regulation
-
Equinor - Statfjord B - Investigation of short circuit incident with personal injuryPublished:in a fire. Actual and potential consequences The incident caused a production shutdown and material damage from the fire. Personnel directly involved in the incident while extinguishing the fire were exposed
- Investigation report
- Working environment
- Process safety
- Risk management
- Electrical installations
- Equinor
- Statfjord B
-
Re § 8 Structures and materialsthe NORSOK M-004 standard can be used as a basis. When selecting materials with regard to technical fire qualities as mentioned in litera d, non-flammable materials should be chosen. In those cases where
- Guideline
- Technical and operational regulations
-
Re § 34 Process safety systemssystems 34 The requirement for independence as mentioned in the first subsection, implies that the fire and gas detection system comes in addition to systems for management and control and other safety
- Guideline
- Technical and operational regulations
-
§ 33 Emergency shut-down systemhydrocarbons and chemicals to and from the onshore facility, and which isolate the onshore facility's fire areas. 612-1033-F2025_1-33
- Paragraph
- Technical and operational regulations
-
§ 7 Main safety functionsaccident situation: preventing escalation of accident situations so that personnel outside the immediate fire area are not injured, the capacity of main load-bearing structures until the facility has been evacuated
- Paragraph
- The facilities regulations
-
§ 33 Emergency shutdown systemand chemicals to and from the facility and to and from wells, and which isolate and/or partition the fire areas on the facility. 634-1033-F2025_1-33
- Paragraph
- The facilities regulations
-
Equinor – Gullfaks A – technical safety and process safetyPublished:firewater system Deficient follow-up of firefighting installations Deficient follow-up of passive fire protection Deficient follow-up of assumptions made and outcomes achieved What happens next? We have
- Audit report
- Process safety
- Technical safety
- Equinor
- Gullfaks A
-
Equinor – Tjeldbergodden – management of emergency preparedness and major accidentsPublished:Deficient documentation of training in the use of refilling apparatus for breathing air cylinders Fire equipment cabinet not properly maintained What happens now? We have asked Equinor to report to us
- Audit report
- Emergency preparedness
- Equinor
- Tjeldbergodden
-
Neptune Energy – Gjøa – follow-up of ongoing projectsPublished:point. The non-conformities concerned deficiencies in fixed fire-fighting facilities and a lack of assessment of new knowledge concerning fires. The improvement point concerned overpressure protection. Follow-up
- Audit report
- Technical safety
- Process safety
- Electrical installations
- Neptune Energy
- Gjøa
-
Equinor – Statfjord C – process safety, technical safety, maintenance management and risk managementPublished:Barrier management Risk management Maintenance management Overpressure protection and flaring capacity Fire integrity Firefighting Open drainage system Work on pressurised hydrocarbon-carrying systems and other
- Audit report
- Process safety
- Technical safety
- Maintenance management
- Risk management
- Equinor
- Statfjord C
-
Equinor – Sture and Kollsnes – electrical facilities and the working environmentPublished:Electrical facilities (Kollsnes) Follow-up of hired electrical personnel (Kollsnes & Sture) Barriers for fire prevention in substations (Kollsnes & Sture) Maintenance of emergency lighting and marking of barrier
- Audit report
- Working environment
- Electrical installations
- Process safety
- Equinor
- Sture
- Kollsnes
-
Equinor – Tjeldbergodden – emergency response and major accidentsPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station. What happens next? We have asked Equinor to report by 20 December 2024 on how the non-conformities
- Audit report
- Emergency preparedness
- Risk management
- Tjeldbergodden
- Equinor
-
Equinor – Gullfaks B – corrosion under insulationPublished:comply with company and regulatory requirements. Result We identified one non-conformity concerning fire protection of a structure. We also identified four improvement points. These concerned: Pipe insulation
- Audit report
- Structural safety
- Equinor
- Gullfaks B