Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Audit report
- Structural safety
- Process safety
- Statoil
- Visund
-
ConocoPhillips – Eldfisk – electrical facilitiesPublished:Verification of performance requirements for gas-tight dampers Performance requirements for the closure of fire and gas dampers What happens next? We have asked ConocoPhillips to report by 9 January 2026 on how
- Audit report
- Well integrity
- Eldfisk A
- Eldfisk B
- Eldfisk S
- ConocoPhillips
-
Equinor – Visund – well control and emergency preparednessPublished:control equipment Lack of risk assessment of configuration of seabed BOP at Visund Deficiencies at fire station 2 Deficiencies in well control procedure We also identified three improvement points concerning:
- Audit report
- Well integrity
- Emergency preparedness
- Equinor
- Visund
-
Equinor – Åsgard A – technical and operational barriers for pipes, process systems and structural elementsPublished:in compliance with the HSE regulations. Result One non-conformity was identified. This concerned: Fire water supply We also observed four factors that we have chosen to categorise as improvement points
- Audit report
- Structural safety
- Process safety
- Equinor
- Åsgard A
-
Equinor – Heidrun – technical safety, process safety and electrical facilitiesPublished:we identified non-conformities within the following areas: Barriers Fixed firefighting facilities Fire doors Follow-up of non-conformities Marking of the arc flash energy level of panels In addition, we
- Audit report
- Technical safety
- Process safety
- Electrical installations
- Equinor
- Heidrun
-
Vår Energi – Jotun FPSO – modification projectPublished:Alternative to central control room Independence of emergency shutdown function Start-up arrangements for fire pump drives We also identified an improvement point concerning systematic follow-up of alarms. What
- Audit report
- Process safety
- Risk management
- Electrical installations
- Jotun A
- Vår Energi
-
Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Audit report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Equinor – Kvitebjørn – emergency preparedness and helideckPublished:board Location of workstation for maritime surveillance Maintenance of MOB boat suits Siting of the fire stations Redundancy in the absence of lifeboat coxswain What happens now? We have asked Equinor to
- Audit report
- Emergency preparedness
- Equinor
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Audit report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Vår Energi – Goliat FPSO – management of technical barriers and maintenancePublished:Six non-conformities were identified, concerning: Barrier management Non-conformity handling Passive fire protection Overpressure protection Maintenance programme Procedures In addition, three improvement
- Audit report
- Barrier management
- Maintenance management
- Goliat FPSO
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Audit report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Audit report
- Equinor
- Grane
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Audit report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Audit report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Equinor – Troll A – management of major accident risk and barriersPublished:concerned: Uncertainties in documents describing the organisational model Moisture in emergency lighting Fire resistance Explosion pressure Site-specific expertise What happens now? We have asked Equinor to report
- Audit report
- Process safety
- Barrier management
- Risk management
- Troll A
- Equinor
-
Rowan – Rowan Norway – emergency preparednessPublished:domain of emergency preparedness for Rowan Norway. Result Non-conformities were identified relating to: Fire protection Lifeboats Helicopter deck Signage and marking of evacuation routes Escape from lifts In
- Audit report
- Emergency preparedness
- Rowan
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Audit report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
Vår Energi – Goliat – management of technical barriers and maintenancePublished:non-conformity had not been addressed in line with the company’s feedback to us: Non-conformity concerning “Fire water supply” from chapter 5.1 of the report following the audit of 1 July 2015. Result No new non-conformities
- Audit report
- Process safety
- Risk management
- Technical safety
- Barrier management
- Goliat FPSO
- Vår Energi
-
Equinor - Sleipner - Corrosion under insulation (CUI)Published:addition, three improvement points were identified in connection with: Testing of the firewater system Fire divisions Information about risks associated with working on insulation stripping for CUI inspections
- Audit report
- Structural safety
- Maintenance management
- Sleipner
- Equinor
- Statoil
-
Premier Oil - Bream - Project management, risk management and technical barriersPublished:Risk-reduction principles System for barrier management Transfer of experience Topside layout Passive fire protection
- Audit report
- Risk management
- Technical safety
- Barrier management
- Premier Oil