What are you looking for?
240 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Neptune Energy – Gjøa – follow-up of ongoing projectsPublished:point. The non-conformities concerned deficiencies in fixed fire-fighting facilities and a lack of assessment of new knowledge concerning fires. The improvement point concerned overpressure protection. Follow-up
- Audit report
- Technical safety
- Process safety
- Electrical installations
- Neptune Energy
- Gjøa
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Audit report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Equinor – Statfjord C – process safety, technical safety, maintenance management and risk managementPublished:Barrier management Risk management Maintenance management Overpressure protection and flaring capacity Fire integrity Firefighting Open drainage system Work on pressurised hydrocarbon-carrying systems and other
- Audit report
- Process safety
- Technical safety
- Maintenance management
- Risk management
- Equinor
- Statfjord C
-
Equinor – Sture and Kollsnes – electrical facilities and the working environmentPublished:Electrical facilities (Kollsnes) Follow-up of hired electrical personnel (Kollsnes & Sture) Barriers for fire prevention in substations (Kollsnes & Sture) Maintenance of emergency lighting and marking of barrier
- Audit report
- Working environment
- Electrical installations
- Process safety
- Equinor
- Sture
- Kollsnes
-
Equinor – Tjeldbergodden – emergency response and major accidentsPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station. What happens next? We have asked Equinor to report by 20 December 2024 on how the non-conformities
- Audit report
- Emergency preparedness
- Risk management
- Tjeldbergodden
- Equinor
-
Equinor – Gullfaks B – corrosion under insulationPublished:comply with company and regulatory requirements. Result We identified one non-conformity concerning fire protection of a structure. We also identified four improvement points. These concerned: Pipe insulation
- Audit report
- Structural safety
- Equinor
- Gullfaks B
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Audit report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Audit report
- Process safety
- Ula DP
- Aker BP
-
Okea – Draugen – major accident risk and barriersPublished:These comprised: Basis for evaluating the effectiveness of maintenance Training and exercises Passive fire protection of fluid outlet separators Marking of equipment What happens next? We have asked Okea to
- Audit report
- Barrier management
- Process safety
- Draugen
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Audit report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
ExxonMobil - Jotun A - Management of crane and lifting operations and management of lifting equipmentPublished:control of lifting equipment Materials handling plan MOB boat Liferaft Scaffolding Exhaust exposure of fire pump In addition, improvement points were identified in connection with: Technical features of the
- Audit report
- Handling, cranes and lifting
- Technical safety
- ExxonMobil
- Jotun A
-
ConocoPhillips - Ekofisk 2/4 J - Technical safety and process safetyPublished:non-conformities Pressure tanks Documentation In addition, improvement points were identified in connection with: Fire water Process shutdown valve Ignition sources Evacuation routes Acceptance criteria
- Audit report
- Technical safety
- Process safety
- ConocoPhillips
- Ekofisk J
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Audit report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Audit report
- Statoil
- Heimdal
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Audit report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Audit report
- Process safety
- Risk management
- Wintershall
- Brage
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Audit report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Audit report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Audit report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Audit report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR