What are you looking for?
230 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Inspection report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Inspection report
- Process safety
- Ula DP
- Aker BP
-
Okea – Draugen – major accident risk and barriersPublished:These comprised: Basis for evaluating the effectiveness of maintenance Training and exercises Passive fire protection of fluid outlet separators Marking of equipment What happens next? We have asked Okea to
- Inspection report
- Barrier management
- Process safety
- Draugen
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Inspection report
- Process safety
- Risk management
- Wintershall
- Brage
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Inspection report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Inspection report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Inspection report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Inspection report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Inspection report
- Statoil
- Heimdal
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Inspection report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Inspection report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Inspection report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Aker BP - Ivar Aasen - Risk, barrier and maintenance managementPublished:decision-making Management and follow-up of temporary equipment Barrier management Penetrations and doors in fire walls Maintenance programme Labelling of equipment and systems Aker BP has been given a deadline of
- Inspection report
- Risk management
- Maintenance management
- Barrier management
- Aker BP
- Ivar Aasen
-
ExxonMobil - Jotun A - Management of crane and lifting operations and management of lifting equipmentPublished:control of lifting equipment Materials handling plan MOB boat Liferaft Scaffolding Exhaust exposure of fire pump In addition, improvement points were identified in connection with: Technical features of the
- Inspection report
- Handling, cranes and lifting
- Technical safety
- ExxonMobil
- Jotun A
-
ConocoPhillips - Ekofisk 2/4 J - Technical safety and process safetyPublished:non-conformities Pressure tanks Documentation In addition, improvement points were identified in connection with: Fire water Process shutdown valve Ignition sources Evacuation routes Acceptance criteria
- Inspection report
- Technical safety
- Process safety
- ConocoPhillips
- Ekofisk J
-
Aker BP – Valhall Flank West – HelideckPublished:of the helideck. Result One non-conformity was identified in connection with the positioning of a fire station. An improvement point was also identified relating to the system for familiarising and training
- Inspection report
- Emergency preparedness
- Aker BP
- Valhall Flanke Vest
-
Equinor – Visund – technical safety and risk managementPublished:prioritisation Risk reduction Non-conformity handling Maintenance Ignition source control Passive fire protection We also observed one factor that we have chosen to categorize as an improvement point.
- Inspection report
- Technical safety
- Risk management
- Equinor
- Visund
-
Equinor – Snorre A – barrier managementPublished:requirements. Result Five non-conformities were identified during the audit. These concerned: Passive fire protection Operational barriers Event notification procedure Factors with a potential to affect explosion
- Inspection report
- Barrier management
- Process safety
- Equinor
- Snorre A
-
Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Inspection report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance