228 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Maersk Drilling Norge AS - Mærsk Guardian - Preparedness and maintenance managementPublished:identified in connection with: Barriers and performance requirements Barriers for emergency preparedness Fire stations Training and drills Cabin doors In addition, improvement points were identified in connection
- Inspection report
- Emergency preparedness
- Maintenance management
- Maersk Drilling
- Maersk Guardian
-
Statoil - Kårstø - Major accident auditPublished:addition, improvement points were identified in connection with: Improvement of technical weaknesses Fire load in the process area Documentation Flare overloading Pressure relief valves Total Risk Analysis
- Inspection report
- Process safety
- Risk management
- Gassco
- Kårstø
- Kvitebjørn
-
Statoil - Statfjord C - Barrier managementPublished:in the main plan In addition, improvement points were identified in connection with: • Barriers • Fire water • Area risk charts • Non-conformity handling • Valves
- Inspection report
- Barrier management
- Statoil
- Statfjord C
-
Equinor – Norne – major accident risk and technical barriersPublished:identified, concerning: Planning and prioritisation Non-conformity handling Ignition source control The fire pump system Process safety Documentation No improvement points were identified. What happens next
- Inspection report
- Process safety
- Risk management
- Technical safety
- Electrical installations
- Norne FPSO
- Equinor
-
Naturkraft - Naturkraft Kårstø - Investigation of ammonia leakPublished:ammonia leak An investigation of the incident on 30 May 2013 when two employees in Naturkraft’s gas-fired power station at Kårstø were exposed to ammonia solution has identified serious breaches of the regulations
- Investigation report
- Working environment
- Process safety
-
Vår Energi – Jotun FPSO – management of barriersPublished:of completion, system testing and handover to operations Active firefighting systems Fire integrity and passive fire protection Electrical safety and electrical facilities Ignition source control Safety
- Inspection report
- Process safety
- Barrier management
- Maintenance management
- Jotun A
-
Equinor – Sleipner – barrier management and handling of risk of hydrocarbon leakagePublished:non-conformities were identified in the following areas: Barrier management Process safety Maintenance of fire doors Training and verification of performance requirements for operational and organisational barrier
- Inspection report
- Process safety
- Working environment
- Equinor
- Sleipner
-
Saipem – Scarabeo 8 – emergency preparedness and helicopter operationsPublished:improvement points: Fire monitors on the helideck Marking and signage Training of the emergency response organisation on board Emergency lighting for operation of DAHR on helideck Mustering at fire stations The
- Inspection report
- Emergency preparedness
- Saipem
- Scarabeo 8
-
Statoil - Kvitebjørn - Management of barriersPublished:requirements. Resultat Four non-conformities were identified in connection with: Design loads for fire Pressure control equipment Alarm load in central control room Transfer of experience In addition,
- Inspection report
- Barrier management
- Statoil
-
Equinor – Gudrun – non-conformity handlingPublished:factor that we have chosen to categorise as an improvement point. This concerned: Inadequate passive fire protection What happens now? We have asked Equinor to give us its assessment of the improvement point
- Inspection report
- Equinor
- Gudrun
-
Shell - Draugen - Management of technical barriersPublished:management Modification projects Result Four non-conformities were identified in connection with: Process fires Performance requirements Firewater system Warning and notification of hazard and accident situations
- Inspection report
- Technical safety
- Barrier management
- Shell
- ShellEnterprise
- Draugen
-
Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Inspection report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Equinor - Statfjord B - Investigation of short circuit incident with personal injuryPublished:in a fire. Actual and potential consequences The incident caused a production shutdown and material damage from the fire. Personnel directly involved in the incident while extinguishing the fire were exposed
- Investigation report
- Working environment
- Process safety
- Risk management
- Electrical installations
- Equinor
- Statfjord B
-
AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – electrical facilities, technical safety and ICT securityPublished:Ignition source control Ventilation systems Emergency power systems Emergency lighting Fire fighting Passive fire protection Electrical facilities and installations Work in and operation of electrical
- Inspection report
- Process safety
- Cyber security
- Electrical installations
- Technical safety
- Odfjell Drilling AS
- Deepsea Aberdeen
-
Equinor – Gullfaks B – holistic risk and barrier management, and robust operation and maintenancePublished:Result In the audit, we identified five non-conformities. These comprised: Barrier management Passive fire protection Escape routes from rooms for high voltage installations Risk analyses Risk reduction We
- Inspection report
- Barrier management
- Risk management
- Equinor
- Gullfaks B
-
AoC audit – Odfjell Drilling – Deepsea Yantai – Electrical facilities and technical safetyPublished:modifications Electrotechnical system analyses The fire water system Area classification and associated requirements Inadequate ignition source decoupling Pneumatic fire doors Emergency lighting installation Emergency
- Inspection report
- Electrical installations
- Technical safety
- Odfjell Drilling AS
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Inspection report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Equinor – Tjeldbergodden – emergency response and major accidentsPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station. What happens next? We have asked Equinor to report by 20 December 2024 on how the non-conformities
- Inspection report
- Emergency preparedness
- Risk management
- Tjeldbergodden
- Equinor
-
Order to Equinor following investigation of the Johan Castberg projectPublished:identified, and Equinor h Johan Castberg lies in the Barents Sea, 240 kilometres north-west of Hammerfest. The field is being developed with a floating production, storage and offloading (FPSO) facility
- Investigation report
- Structural safety
- Risk management
- Johan Castberg
- Equinor
-
Neptune Energy – Gjøa – follow-up of ongoing projectsPublished:point. The non-conformities concerned deficiencies in fixed fire-fighting facilities and a lack of assessment of new knowledge concerning fires. The improvement point concerned overpressure protection. Follow-up
- Inspection report
- Technical safety
- Process safety
- Electrical installations
- Neptune Energy
- Gjøa