Statoil - Johan Sverdrup - Barrier managementPublished:Measures for protecting rooms and equipment from fire We found six improvement points in the following areas: Firewater system Possible weakening of fire walls Preservation of electrical facilities and
- Audit report
- Barrier management
- Process safety
- Technical safety
- Statoil
- Johan Sverdrup
-
Prosafe - Safe Scandinavia - Technical safety, maintenance management and emergency preparednessPublished:performance standards The maintenance system Pressure safety valves (PSV) Preservation Activation of fire extinguishing systems The emergency shutdown system Risk and emergency preparedness analyses Training
- Audit report
- Maintenance management
- Technical safety
- Emergency preparedness
- Prosafe Offshore
- Safe Scandinavia
-
Okea – Draugen – management of emergency preparednessPublished:accident situations System for follow-up of internal requirements Siting and equipping of fire stations Siting of fire cabinet on the helideck Maintenance of emergency response equipment Rescue capability
- Audit report
- Emergency preparedness
- Draugen
- OKEA
-
Equinor – Troll C – technical safety, process safety and electrical facilitiesPublished:out maintenance programme Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also identified four improvement points concerning: Documentation Marking
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Troll C
- Equinor
-
Gassco and Equinor – Kollsnes – process safety and technical safetyPublished:requirements Inadequate documentation Deficiencies in passive fire protection Suppression of explosion pressure Measures in the event of fire pumps being out of service Maintenance We also identified an
- Audit report
- Process safety
- Kollsnes
- Equinor
- Gassco
-
Transocean – Transocean Norge – emergency preparedness and technical safetyPublished:routes Maintenance Equipment in MOB boat Marking of escape routes Barrier management Passive fire protection Fire protection systems Open drainage system One factor was also observed that we have chosen to
- Audit report
- Emergency preparedness
- Technical safety
- Transocean Offshore Ltd
- Transocean Norge
-
Norske Shell – Draugen – technical safety and surface protectionPublished:Result Four non-conformities were identified, relating to: Assessment of the worst credible process fire Performance requirements Testing of the firewater system Warning and notification of hazard and accident
- Audit report
- Shell
- ShellEnterprise
- Draugen
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Audit report
- Barrier management
- Risk management
- Aker BP
-
Equinor - Troll C - Technical safetyPublished:Troll C. Result Six non-conformities were identified, relating to: Follow-up and overview of passive fire protection Lighting in the emergency hospital and back-up emergency hospital Automatic actions in
- Audit report
- Technical safety
- Statoil
- Troll C
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Audit report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Audit report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Audit report
- Structural safety
- Neptune Energy
- Gjøa
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Audit report
- Barrier management
- Equinor
- Oseberg A
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Audit report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
ConocoPhillips – Eldfisk – electrical facilitiesPublished:Verification of performance requirements for gas-tight dampers Performance requirements for the closure of fire and gas dampers What happens next? We have asked ConocoPhillips to report by 9 January 2026 on how
- Audit report
- Well integrity
- Eldfisk A
- Eldfisk B
- Eldfisk S
- ConocoPhillips
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Audit report
- Emergency preparedness
- Equinor
- Heidrun
-
Total E&P - Martin Linge - FSO Modification projectPublished:Improvement points were identified in connection with: Risk analysis (QRA) Design Performance requirements Fire divisions
- Audit report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Wintershall - Brage - Barrier managementPublished:addition, improvement points were detected in connection with: Inspection history for penetrations in fire walls Facility-specific information in performance standards WINO has been given a deadline of 2 January
- Audit report
- Process safety
- Wintershall
- Brage
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Audit report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B
- Oseberg D