Statoil - Johan Sverdrup - Barrier managementPublished:Measures for protecting rooms and equipment from fire We found six improvement points in the following areas: Firewater system Possible weakening of fire walls Preservation of electrical facilities and
- Inspection report
- Barrier management
- Process safety
- Technical safety
- Statoil
- Johan Sverdrup
-
COSL Drilling Europe - COSLInnovator - Electrical facilities, technical safety and drilling-related systemsPublished:Overview of status of safety systems Ventilation and over-pressure in the living quarters Fire detection and fire pump start Non-conformity handling Maintenance management Performance standards In addition
- Inspection report
- Electrical installations
- Technical safety
- Well integrity
- COSL Innovator
- COSL Drilling Europe
-
Okea – Draugen – management of emergency preparednessPublished:accident situations System for follow-up of internal requirements Siting and equipping of fire stations Siting of fire cabinet on the helideck Maintenance of emergency response equipment Rescue capability
- Inspection report
- Emergency preparedness
- Draugen
- OKEA
-
Transocean – Transocean Norge – emergency preparedness and technical safetyPublished:routes Maintenance Equipment in MOB boat Marking of escape routes Barrier management Passive fire protection Fire protection systems Open drainage system One factor was also observed that we have chosen to
- Inspection report
- Emergency preparedness
- Technical safety
- Transocean Offshore Ltd
- Transocean Norge
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Inspection report
- Barrier management
- Risk management
- Aker BP
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Inspection report
- Structural safety
- Neptune Energy
- Gjøa
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Inspection report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Inspection report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Equinor - Troll C - Technical safetyPublished:Troll C. Result Six non-conformities were identified, relating to: Follow-up and overview of passive fire protection Lighting in the emergency hospital and back-up emergency hospital Automatic actions in
- Inspection report
- Technical safety
- Statoil
- Troll C
-
Norske Shell – Draugen – technical safety and surface protectionPublished:Result Four non-conformities were identified, relating to: Assessment of the worst credible process fire Performance requirements Testing of the firewater system Warning and notification of hazard and accident
- Inspection report
- Shell
- ShellEnterprise
- Draugen
-
Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Inspection report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Inspection report
- Barrier management
- Equinor
- Oseberg A
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Inspection report
- Emergency preparedness
- Equinor
- Heidrun
-
Total E&P - Martin Linge - FSO Modification projectPublished:Improvement points were identified in connection with: Risk analysis (QRA) Design Performance requirements Fire divisions
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Wintershall - Brage - Barrier managementPublished:addition, improvement points were detected in connection with: Inspection history for penetrations in fire walls Facility-specific information in performance standards WINO has been given a deadline of 2 January
- Inspection report
- Process safety
- Wintershall
- Brage
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Inspection report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B
- Oseberg D
-
Maersk Drilling Norge AS - Mærsk Guardian - Preparedness and maintenance managementPublished:identified in connection with: Barriers and performance requirements Barriers for emergency preparedness Fire stations Training and drills Cabin doors In addition, improvement points were identified in connection
- Inspection report
- Emergency preparedness
- Maintenance management
- Maersk Drilling
- Maersk Guardian
-
Statoil - Kårstø - Major accident auditPublished:addition, improvement points were identified in connection with: Improvement of technical weaknesses Fire load in the process area Documentation Flare overloading Pressure relief valves Total Risk Analysis
- Inspection report
- Process safety
- Risk management
- Gassco
- Kårstø
- Kvitebjørn
-
Statoil - Statfjord C - Barrier managementPublished:in the main plan In addition, improvement points were identified in connection with: • Barriers • Fire water • Area risk charts • Non-conformity handling • Valves
- Inspection report
- Barrier management
- Statoil
- Statfjord C