What are you looking for?
230 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Transocean – Transocean Norge – emergency preparedness and technical safetyPublished:routes Maintenance Equipment in MOB boat Marking of escape routes Barrier management Passive fire protection Fire protection systems Open drainage system One factor was also observed that we have chosen to
- Inspection report
- Emergency preparedness
- Technical safety
- Transocean Offshore Ltd
- Transocean Norge
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Inspection report
- Barrier management
- Risk management
- Aker BP
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Inspection report
- Structural safety
- Neptune Energy
- Gjøa
-
Equinor - Troll C - Technical safetyPublished:Troll C. Result Six non-conformities were identified, relating to: Follow-up and overview of passive fire protection Lighting in the emergency hospital and back-up emergency hospital Automatic actions in
- Inspection report
- Technical safety
- Statoil
- Troll C
-
Norske Shell – Draugen – technical safety and surface protectionPublished:Result Four non-conformities were identified, relating to: Assessment of the worst credible process fire Performance requirements Testing of the firewater system Warning and notification of hazard and accident
- Inspection report
- Shell
- ShellEnterprise
- Draugen
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Inspection report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Inspection report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Inspection report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Inspection report
- Barrier management
- Equinor
- Oseberg A
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
Equinor – Sture and Kollsnes – electrical facilities and the working environmentPublished:Electrical facilities (Kollsnes) Follow-up of hired electrical personnel (Kollsnes & Sture) Barriers for fire prevention in substations (Kollsnes & Sture) Maintenance of emergency lighting and marking of barrier
- Inspection report
- Working environment
- Electrical installations
- Process safety
- Equinor
- Sture
- Kollsnes
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Inspection report
- Emergency preparedness
- Equinor
- Heidrun
-
Total E&P - Martin Linge - FSO Modification projectPublished:Improvement points were identified in connection with: Risk analysis (QRA) Design Performance requirements Fire divisions
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Wintershall - Brage - Barrier managementPublished:addition, improvement points were detected in connection with: Inspection history for penetrations in fire walls Facility-specific information in performance standards WINO has been given a deadline of 2 January
- Inspection report
- Process safety
- Wintershall
- Brage
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Inspection report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B
- Oseberg D
-
Equinor – Åsgard A – technical and operational barriers for pipes, process systems and structural elementsPublished:in compliance with the HSE regulations. Result One non-conformity was identified. This concerned: Fire water supply We also observed four factors that we have chosen to categorise as improvement points
- Inspection report
- Structural safety
- Process safety
- Equinor
- Åsgard A
-
Equinor - planning and remediation of barrier weaknesses in EPN and FLXPublished:barrier elements Barrier management of oscillating fire monitors on Åsgard A Barrier management of the firewater pumps on Åsgard A Barrier management of the fire water system at Kvitebjørn with requirements
- Inspection report
- Working environment
- Process safety
- Risk management
- Equinor
-
ConocoPhillips - Eldfisk S - Barrier managementPublished:Follow-up of performance requirements for check valves and safety-critical heating cables The fire water system Passive fire protection Qualifications and professional competence of electro technical officer on
- Inspection report
- Process safety
- ConocoPhillips
- Eldfisk S
-
Maersk Drilling - Maersk Reacher - Electrical facilities, technical safety, maintenance management, logistics and emergency preparednessPublished:installations Lighting in the emergency hospital Firefighting system in machine rooms and other high fire risk rooms Ventilation and over-pressure in the living quarters Maintenance management Preservation
- Inspection report
- Electrical installations
- Technical safety
- Handling, cranes and lifting
- Maintenance management
- Maersk Reacher
- Aker BP
- Maersk Drilling
-
Naturkraft - Naturkraft Kårstø - Investigation of ammonia leakPublished:ammonia leak An investigation of the incident on 30 May 2013 when two employees in Naturkraft’s gas-fired power station at Kårstø were exposed to ammonia solution has identified serious breaches of the regulations
- Investigation report
- Working environment
- Process safety