COSL Drilling – COSLInnovator – electrical facilities, safety instrumented systems and technical safetyPublished:parts evaluation Maintenance Deficiencies in fire doors and fire walls Watertight HVAC valves Lack of monitoring and control of the safety integrity of fire and gas detectors in operation Work in electrical
- Audit report
- Electrical installations
- Technical safety
- COSL Drilling Europe
- COSL Innovator
-
Equinor – Heidrun – management of emergency preparedness and helicopter operationsPublished:Equipment for dousing an engine fire was missing A fire hydrant was missing Helifuel pump cabinet sprinkler system was missing GA drawings of helideck - plan was not scaled Room for fire-resistant apparel for helideck
- Audit report
- Emergency preparedness
- Equinor
- Heidrun
-
Dolphin – Borgland Dolphin – emergency preparedness and technical safetyPublished:Securing of equipment in normal operation Fire stations Training of the emergency response organisation on board Helideck Open drainage system Measures to combat fire Weaknesses in safety systems Governing
- Audit report
- Emergency preparedness
- Technical safety
- Dolphin
- Borgland Dolphin
-
Altera Infrastructure Production AS – Petrojarl Knarr FPSO – electrical facilities, safety instrumented systems, process safety and technical safetyPublished:Rectification of previous non-conformities The ventilation systems Firefighting Passive fire protection Safety systems Evaluation of fire resistance Overview of status of safety systems – jumper logs Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- Vår Energi
- Petrojarl Knarr
-
Equinor – Oseberg Øst – major accident risk, barriers and emergency preparednessPublished:non-conformities were identified during the audit. These comprised: Lack of passive fire protection Deficiencies in fire barriers for fire water and emergency power generators Missing headset for VHF in lifeboat
- Audit report
- Barrier management
- Emergency preparedness
- Process safety
- Equinor
- Oseberg Øst
-
Equinor – Gudrun – technical safety and process safetyPublished:in the following areas: Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also observed one factor that we have chosen to categorise as an improvement
- Audit report
- Technical safety
- Process safety
- Equinor
- Gudrun
-
Equinor – Troll C – technical safety, process safety and electrical facilitiesPublished:out maintenance programme Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also identified four improvement points concerning: Documentation Marking
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Troll C
- Equinor
-
Gassco and Equinor – Kollsnes – process safety and technical safetyPublished:requirements Inadequate documentation Deficiencies in passive fire protection Suppression of explosion pressure Measures in the event of fire pumps being out of service Maintenance We also identified an
- Audit report
- Process safety
- Kollsnes
- Equinor
- Gassco
-
Transocean – Transocean Norge – emergency preparedness and technical safetyPublished:routes Maintenance Equipment in MOB boat Marking of escape routes Barrier management Passive fire protection Fire protection systems Open drainage system One factor was also observed that we have chosen to
- Audit report
- Emergency preparedness
- Technical safety
- Transocean Offshore Ltd
- Transocean Norge
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Audit report
- Structural safety
- Neptune Energy
- Gjøa
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Audit report
- Barrier management
- Risk management
- Aker BP
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Audit report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Audit report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Audit report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Equinor - Troll C - Technical safetyPublished:Troll C. Result Six non-conformities were identified, relating to: Follow-up and overview of passive fire protection Lighting in the emergency hospital and back-up emergency hospital Automatic actions in
- Audit report
- Technical safety
- Statoil
- Troll C
-
Norske Shell – Draugen – technical safety and surface protectionPublished:Result Four non-conformities were identified, relating to: Assessment of the worst credible process fire Performance requirements Testing of the firewater system Warning and notification of hazard and accident
- Audit report
- Shell
- ShellEnterprise
- Draugen
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Audit report
- Barrier management
- Equinor
- Oseberg A
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Audit report
- Emergency preparedness
- Equinor
- Heidrun
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Audit report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B