The audit was conducted from 29 November to 3 December 2021.
Objective
The objective of the audit was to verify that Equinor's management and follow-up of barriers at the Oseberg field centre (Oseberg A, B and D), whether technical, organisational or operational, comply with the company's and the authorities' requirements.
Result
The audit identified four non-conformities. These concerned:
- Consequences of worst credible process fire (WCPF)
- Lack of independence between emergency shutdown and process safety systems for well valves
- Incident notification procedure
- Lack of training in and verification of performance requirements for operational and organisational barrier elements
We also observed six factors we have chosen to categorise as improvement points. These were:
- Deficiencies in process safety – the response time for some process shut-off valves is too long relative to estimated need
- Deficiencies in process safety – weaknesses in the design of overpressure protection
- Follow-up of measures in Synergy
- Frequency of TTS verification at the Oseberg field centre
- Evacuation routes
- Fire doors
What happens now?
We have asked Equinor to report on how the non-conformities and improvement points will be addressed.