What are you looking for?
240 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Transocean Offshore ltd - Transocean Arctic - Emergency preparedness -and Working environmentPublished:measures Training and composition of the emergency preparedness organisation Emergency preparedness plan Fire stations Barriers In addition, improvement points were identified in connection with: Roles and responsibilities
- Audit report
- Working environment
- Emergency preparedness
- Barrier management
- Transocean Offshore Ltd
- Transocean Arctic
-
ConocoPhillips - Eldfisk B - Management of technical barriersPublished:non-conformity handling, work descriptions for function testing, testing of the firewater system, fire walls and documentation. In addition, an improvement point was identified relating to the performance
- Audit report
- Barrier management
- Maintenance management
- Technical safety
- Process safety
- Electrical installations
- ConocoPhillips
- Eldfisk B
-
Aker BP – Alvheim – risk and barrier management of stability incidentsPublished:and drills Working hours and workload Competence in respect of lifeboat 5 Non-self-closing doors in fire walls. We also observed one factor that we have chosen to categorize as an improvement point. This
- Audit report
- Risk management
- Barrier management
- Structural safety
- Aker BP
- Alvheim FPSO
-
Vår Energi – Balder FPU – major accident risk and barriers during operationPublished:regulatory non-conformities. These concerned: Documentary basis for management of major accident risk Fire and explosion resistance We also identified two improvement points. These concerned: Capacity in the
- Audit report
- Process safety
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Audit report
- Technical safety
- Risk management
- Equinor
- Grane
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Audit report
- Process safety
- Equinor
- Snorre B
-
Equinor - Sleipner - Corrosion under insulation (CUI)Published:addition, three improvement points were identified in connection with: Testing of the firewater system Fire divisions Information about risks associated with working on insulation stripping for CUI inspections
- Audit report
- Structural safety
- Maintenance management
- Sleipner
- Equinor
- Statoil
-
Premier Oil - Bream - Project management, risk management and technical barriersPublished:Risk-reduction principles System for barrier management Transfer of experience Topside layout Passive fire protection
- Audit report
- Risk management
- Technical safety
- Barrier management
- Premier Oil
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Audit report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Audit report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Audit report
- Maintenance management
- Statoil
- Gullfaks A
-
Aker BP – Valhall Flank North – emergency preparedness and helideckPublished:addition, two improvement points were identified, concerning: Use of resources for developing procedures Fire station and lifeboats for ensuring rapid and efficient evacuation and rescue What happens next? We
- Audit report
- Aker BP
- Valhall Flanke Nord
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Audit report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Audit report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Audit report
- Cyber security
- Statoil
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- West Bollsta
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Audit report
- Emergency preparedness
- Haven
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk
-
Premier Oil and the Bream developmentPublished:Result During the audit, an observation was made concerning the robustness of the proposed solution for fire water, which the PSA considers may present a challenge in terms of satisfying regulatory requirements
- Audit report
- Process safety
- Premier Oil
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A