What are you looking for?
235 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Statoil - Gina Krog - Barriers, technical safety, electrical facilities, working environment and materials handlingPublished:connection with: Roles and responsibilities Enterprise of competence Use of composite deck gratings Fire water supply Chemicals Statoil has been given a deadline of 19 March 2018 to report on how the non-conformity
- Inspection report
- Barrier management
- Technical safety
- Electrical installations
- Working environment
- Handling, cranes and lifting
- Statoil
- Gina Krog
-
Aker BP – Alvheim – risk and barrier management of stability incidentsPublished:and drills Working hours and workload Competence in respect of lifeboat 5 Non-self-closing doors in fire walls. We also observed one factor that we have chosen to categorize as an improvement point. This
- Inspection report
- Risk management
- Barrier management
- Structural safety
- Aker BP
- Alvheim FPSO
-
Vår Energi – Balder FPU – major accident risk and barriers during operationPublished:regulatory non-conformities. These concerned: Documentary basis for management of major accident risk Fire and explosion resistance We also identified two improvement points. These concerned: Capacity in the
- Inspection report
- Process safety
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Inspection report
- Technical safety
- Risk management
- Equinor
- Grane
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Inspection report
- Process safety
- Equinor
- Snorre B
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Inspection report
- Cyber security
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Inspection report
- Structural safety
- Process safety
- Statoil
- Visund
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Inspection report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Inspection report
- Cyber security
- Statoil
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Inspection report
- Electrical installations
- Technical safety
- West Bollsta
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Inspection report
- Emergency preparedness
- Haven
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Inspection report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Inspection report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A
-
Eni Norge - Goliat - Electrical installationsPublished:identified in connection with: Gas detectors of HVAC intakes and ducts Organisation of electrical staff Fire detectors and manual activation of electrical isolation Test method for heating cables Personnel responsible
- Inspection report
- Electrical installations
- Process safety
- Eni Norge
- Goliat FPSO
-
Premier Oil and the Bream developmentPublished:Result During the audit, an observation was made concerning the robustness of the proposed solution for fire water, which the PSA considers may present a challenge in terms of satisfying regulatory requirements
- Inspection report
- Process safety
- Premier Oil
-
Vår Energi – Major accident risk and barriers – BalderPublished:Barrier strategy and performance standards Management of change Process safety Ignition source control Fire resistance Temporary equipment and installations Labelling Maintenance programme Documentation Deck
- Inspection report
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Aker BP - Ula - Emergency preparedness and helideckPublished:addition, improvement points were identified relating to: Verification of performance requirements Fire stations Lifeboats Safety assessments relating to maintenance and modification Working arrangements
- Inspection report
- Emergency preparedness
- Aker BP
- Ula PP
-
Equinor – Oseberg H – use of vessel with gangwayPublished:requirements of the Offshore Operation Manager, activation of emergency shutdown of Oseberg H, assessment of fire on the gangway-equipped vessel and competency requirements of gangway operators. What happens now
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Oseberg H
- Equinor
-
Eni Norge AS - Goliat FPSO - Management of emergency preparednessPublished:In addition, improvement points were observed concerning the use of lifting equipment, scaffolding, fire team radio communication, alternative mustering station for response teams and changes to emergency
- Inspection report
- Emergency preparedness
- Eni Norge
- Goliat FPSO