Consents
Operators must obtain consent from the regulator at important milestones.
Learn more about consents
Sorted by:
Most recently published
-
BP - Extended lifetime for Valhall facilitiesPublished:BP has received consent to use the Valhall DP and PCP facilities beyond their original lifetimes.
- Lifespan
-
BP application for consent to continue using Valhall QP deniedPublished:The Petroleum Safety Authority Norway (PSA) has turned down an application from BP Norge AS for consent to extend the operating life of the quarters platform (QP) on the Valhall field.
- Lifespan
-
Statoil - Extended lifetime for Oseberg VestflankePublished:Statoil has received consent to use Oseberg Vestflanke beyond its originally planned life.
- Lifespan
-
Statoil - Modifications at SleipnerPublished:Statoil has received consent for modifications at Sleipner for connecting a gas pipeline from Gina Krog.
- Operations, maintenance, modifications
-
Gassco - Use of Knarr gas export pipelinePublished:Gassco has received consent to use a pipeline for gas transport from Knarr.
- Pipelines
- Use of facility
-
Statoil - Extended lifetime for TunePublished:Statoil has received consent to use facilities on the Tune field until 2020.
- Lifespan
-
Statoil - Lifetime extension for TunePublished:Statoil has received consent to use facilities on the Tune field until 2020.
- Lifespan
-
Consent to use Heimdal beyond its original planned lifetimePublished:
- Lifespan
-
Statoil - Extended lifetime for Statfjord C and associated satellite fieldsPublished:Statoil has received consent for extended use of Statfjord C, Statfjord Nord, Statfjord Øst and Sygna beyond their original design lives.
- Lifespan
-
Statoil - Lifetime extension for Draupner SPublished:Gassco has received consent to extend use of the Draupner S facility beyond its design life, to 31.12.2028.
- Lifespan