Consents
Operators must obtain consent from the regulator at important milestones.
Learn more about consents
Sorted by:
Most recently published
-
ExxonMobil - Use of Island Frontier and Island Wellserver at SigynPublished:ExxonMobil has received consent to use Island Frontier and Island Wellserver for light well intervention at Sigyn.
- Use of facility
-
BP Norge - Lifetime extension for TambarPublished:BP Norge AS has received consent to extend use of the Tambar facility until January 2022.
- Lifespan
-
Statoil - Partial consent for the Gina Krog facilityPublished:Statoil has received consent to use parts of the Gina Krog facility.
- Use of facility
-
Statoil - Use of pipelines and subsea facilitiesPublished:Statoil has received consent to use pipelines and subsea facilities and implement changes to Gullfaks A in the Gullfaks Rimfaksdalen (GRD) project.
- Pipelines
- Change
-
Statoill - Disponering av innretningar på VolvefeltetPublished:Statoil has received consent to dispose of Mærsk Inspirer, Navion Saga and subsea installations on the Volve field.
- Removal phase
-
BP - Lifetime extension for Valhall WPPublished:BP has received consent to extend the operating life of Valhall WP to 31 December 2028.
- Lifespan
-
BP Norge - Removal of Ekofisk 2/4-GPublished:BP Norge AS (BP) has received consent to remove the top deck of the 2/4-G facility.
- Removal phase
-
Repsol - Removal of Petrojarl VargPublished:Repsol has received consent for the removal of Petrojarl Varg and subsea structures on the Varg field.
- Removal phase
-
ConocoPhillips - Lifetime extension for EldfiskPublished:ConocoPhillips has received consent to extend the lifetime of facilities and pipelines on the Eldfisk field.
- Lifespan
-
Statoil - Modifications at Kristin and TyrihansPublished:Statoil has received consent for modifications at Kristin and Tyrihans in connection with tie-in of the Maria field.
- Operations, maintenance, modifications