Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
ConocoPhillips - Ekofisk area - Helideck and helicopter operationsPublished:Assisted by the Civil Aviation Authority Norway, the PSA has carried out an audit of helideck and helicopter operations at three facilities in the Ekofisk area.
- Emergency preparedness
-
Statoil - Veslefrikk - Emergency preparednessPublished:Audit of Statoil's management of emergency preparedness at Veslefrikk.
- Emergency preparedness
-
Talisman - Gyda - Tilrettelegging for arbeidstakermedvirkningPublished:The PSA has carried out an audit of the organisation of employee participation at Talisman.
- Working environment
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:The PSA has carried out an audit of Statoil's management of the domains of electrical installations, safety instrumented systems and technical safety at Statfjord A
- Electrical installations
- Technical safety
-
Gassco - Kårstø - Materialhåndtering og kran- og løfteoperasjonerPublished:The PSA has carried out an audit of materials handling and crane and lifting operations at Kårstø.
- Handling, cranes and lifting
-
Transocean - Transocean Leader - LogisticsPublished:The PSA has carried out an audit of the Transocean rig company, in respect of logistics on the Transocean Leader drilling facility.
- Handling, cranes and lifting
-
Statoil - Hammerfest - Technical and operational safetyPublished:From 24 to 26 June 2014, the PSA carried out an audit at Hammerfest LNG focused on the disciplines of technical and operational safety.
- Technical safety
-
Statoil - Polarled - Betongpåføring av røyrPublished:On 19 and 20 August 2014, the PSA carried out an audit of the concrete coating of pipes for the Polarled pipeline.
- Structural safety
-
Total – Martin Linge FSO – conversion of shuttle tanker to storage facilityPublished:The Petroleum Safety Authority Norway has carried out an audit of Total E&P Norge AS (Total) and their planning and follow-up of the conversion of the shuttle tanker Hanne Knutsen for use as a storage facility on the Martin Linge field.
- Working environment
- Emergency preparedness
- Structural safety
-
Statoil - Sture - Technical safety and safe operationsPublished:From 17 to 19 June 2014, the PSA carried out a major accident audit of the Sture terminal focused on the disciplines of technical safety and safe operations.
- Technical safety