The objective of the audit was to assess whether Det Norske's management of emergency preparedness, materials handling and OHAS complies with the regulatory requirements.
Result
One non-conformity was identified in connection with the documentation for cranes.
In addition, three improvement points were identified in connection with:
- Access to overhead cranes
- The materials handling plan
- Location of the emergency hospital
Non-conformity:
Entails that a condition is assessed as not complying with a regulatory requirement.
Improvement point:
Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.
Det Norske has been given a deadline of 21 December 2015 to report on how the non-conformity and improvement points will be dealt with.