Statoil - Hammerfest - Technical and operational safetyPublished:From 24 to 26 June 2014, the PSA carried out an audit at Hammerfest LNG focused on the disciplines of technical and operational safety.
- Technical safety
-
Statoil - Polarled - Betongpåføring av røyrPublished:On 19 and 20 August 2014, the PSA carried out an audit of the concrete coating of pipes for the Polarled pipeline.
- Structural safety
-
Total – Martin Linge FSO – conversion of shuttle tanker to storage facilityPublished:The Petroleum Safety Authority Norway has carried out an audit of Total E&P Norge AS (Total) and their planning and follow-up of the conversion of the shuttle tanker Hanne Knutsen for use as a storage facility on the Martin Linge field.
- Working environment
- Emergency preparedness
- Structural safety
-
Statoil - Sture - Technical safety and safe operationsPublished:From 17 to 19 June 2014, the PSA carried out a major accident audit of the Sture terminal focused on the disciplines of technical safety and safe operations.
- Technical safety
-
Gassco - Kollsnes - Technical safety and safe operationsPublished:From 17 to 19 June 2014, the PSA carried out an audit of the Kollsnes gas processing plant focused on the disciplines of technical safety and safe operations.
- Technical safety
-
Statoil - Aasta Hansteen - Materials handling managementPublished:The PSA has carried out an audit of how Statoil organises safe materials handling in the development project for the Aasta Hansteen facility.
- Handling, cranes and lifting
-
Statoil - Mongstad - Planning and execution of scaffolding workPublished:From 18 to 20 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil connected with the planning and execution of scaffolding work at Mongstad.
- Risk management
- Working environment
-
North Atlantic Drilling - West Elara - Follow-up of alarm systemPublished:On 3 June 2014, the PSA carried out an audit of North Atlantic Drilling's follow-up of the alarm system in the drilling control room on the West Elara mobile drilling facility.
- Barrier management
-
Norske Shell - Nyhamna - Technical safety and barrier managementPublished:Petroleumstilsynet (Ptil) gjennomførte i perioden 20.-22.5.2014 tilsyn med detaljprosjektering og barrierestyring av Nyhamnautvidelse-prosjektet hos Kværner.
- Barrier management
- Technical safety
-
COSL Drilling - COSLPromoter - Risk managementPublished:Between 24 June and 3 July 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of COSL Drilling Europe A/S (CDE) and the company's operations using the COSLPromoter drilling facility.
- Risk management