Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
Total - Martin Linge - Planning and execution of drilling and well operationsPublished:During February and March 2017, we carried out an audit of Total E&P Norge AS's (Total) planning and execution of drilling and well operations at Martin Linge.
- Well integrity
-
ConocoPhillips - Management of emergency preparednessPublished:We have carried out an audit of ConocoPhillips's management of emergency preparedness during a period of streamlining processes.
- Emergency preparedness
-
Statoil - Statfjord - Late life safetyPublished:We have carried out an audit of how Statoil is following up the Statfjord facilities beyond their original planned lifetime.
- Well integrity
- Process safety
- Working environment
-
Statoil - Oseberg Vestflanken 2 - Design and fabrication of the control cablePublished:We have carried out an audit of the design and fabrication of the control cable for Oseberg Vestflanken 2.
- Structural safety
- Process safety
-
Statoil - Johan Sverdrup - Detail engineering and fabrication of the drilling facilityPublished:We have carried out an audit of the detail engineering and fabrication of the drilling facility for Johan Sverdrup.
- Structural safety
-
Statoil - Åsgard B - Load-bearing structures and Maritime systemPublished:We have carried out an audit of how Statoil is following up load-bearing structures and maritime systems on the Ã…sgard B facility.
- Structural safety
-
Lundin - Leiv Eriksson - Pressure drillingPublished:Managed pressure drilling (MPD) is a relatively new drilling method. We have conducted an audit of how Lundin and the companies involved are meeting the regulatory requirements in respect of drilling.
- Well integrity
-
Statoil - Grane - Electrical installations and Technical safetyPublished:We have carried out an audit of electrical installations and technical safety at Grane.
- Electrical installations
- Technical safety
-
Wintershall - Maria field - Management of pipeline fabricationPublished:We have carried out an audit of Wintershall's management of pipeline fabrication for the development of the Maria field.
- Structural safety
- Risk management
-
Norske Shell - Nyhamna - Operational auditPublished:The PSA has carried out an operational audit of electrical installations at Shell's plant at Nyhamna.
- Risk management
- Barrier management
- Technical safety
- Electrical installations