DNO – Marulk and Trym – pipe systems and subsea facilitiesPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of DNO’s pipe systems and subsea facilities at Trym and Marulk.
- Havtil
- Project management
-
Aker BP – Yggdrasil – industrial ICT, safety instrumented functions and user and technology interaction in the central control roomPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Aker BP focusing on industrial ICT, safety instrumented functions and user and technology interaction in the central control room at Yggdrasil.
- Cyber security
- Working environment
-
Palfinger Marine Norway – market surveillance – manufacture of remotely operated offshore cranesPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out market surveillance of Palfinger Marine Norway, focused on the manufacture of remotely operated offshore cranes.
- Handling, cranes and lifting
- Market surveillance
-
Equinor – Gina Krog – logistics and work at heightPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Equinor, focused on logistics and work at height at Gina Krog.
- Handling, cranes and lifting
- Scaffolding
-
Vår Energi – Balder FPU – emergency preparednessPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Vår Energi’s management of emergency preparedness on the Balder FPU.
- Emergency preparedness
-
OKEA – Brage – process safetyPublished:From 21 to 23 April 2026, the Norwegian Ocean Industry Authority (Havtil) carried out an audit of OKEA’s Bestla tie-back to Brage project. The focus of the audit was process safety in the design solution, with a particular emphasis on overpressure protect
- Process safety
-
Equinor – Heimdal – disposal/removal of topside and modulesPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Equinor and the disposal/removal of the topside and modules on the Heimdal main platform (HMP).
- Structural safety
-
Equinor – Hammerfest LNG – materials handlingPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Equinor and their management of materials handling at Hammerfest LNG (the Snøhvit Future project (SFP)).
- Handling, cranes and lifting
- Scaffolding
-
Equinor/Veidekke Entreprenør/Bergen Rørteknikk – Sture Terminal – framework conditionsPublished:Norwegian Ocean Industry Authority (Havtil) has conducted an audit of Equinor, Veidekke Entreprenør and Bergen Rørteknikk, focusing on the framework conditions for the new water treatment plant project at the Sture Terminal.
- Working environment
-
Noble Drilling – Noble Invincible – helideckPublished:The Norwegian Ocean Industry Authority (Havtil) has carried out an audit of Noble Drilling and the helideck on Noble Invincible.