§ 32 Fire and gas detection systemFire and gas detection system 32 Facilities shall have a fire and gas detection system that ensures quick and reliable detection of near-fires, fires and gas leaks. The system shall be able to perform
- Paragraph
- The facilities regulations
-
§ 46 Manual fire-fighting and firefighters’ equipmentManual fire-fighting and firefighters’ equipment 46 Facilities shall be equipped with sufficient manual fire-fighting and firefighter equipment to effectively combat incipient fires and prevent escalation
- Paragraph
- The facilities regulations
-
Fire in a tank on Statfjord APublished:incident involving a fire in a tank on Statfjord A Fire in a tank on Statfjord A The Norwegian Ocean Industry Authority (Havtil) has launched an investigation into an incident involving a fire in a tank on the
- News
- Process safety
- Emergency preparedness
- Working environment
-
Deficient insulation of COSMO fire doorsPublished:Deficient insulation of COSMO fire doors Deficient insulation of COSMO fire doors We have been informed that COSMO fire doors of class A-0, A-60 and B-15 may have deficient insulation. We have been
- News
- Process safety
-
Equinor – Snorre B – investigation of a firePublished:Snorre B – investigation of a fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident on the Snorre B facility on 1 May 2019, where a fire broke out in the inlet separator
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Equinor
- Snorre B
-
Incidents involving fires in electrical installationsPublished:Incidents involving fires in electrical installations Electrical installations and equipment are often involved when incidents occur which involve fires and near-fires within the Petroleum Safety Authority
- Project report
- Electrical installations
-
Re § 32 Fire and gas detection systemsFire and gas detection systems 32 For design of the system as mentioned in the first subsection, the standards NS-EN ISO 13702 with Appendix B.6 and NORSOK S-001 Chapters 13 and 14 should be used. The
- Guideline
- The facilities regulations
-
Re § 31 Fire divisions in living quartersFire divisions in living quarters 31 If the living quarters are located on a separate facility as mentioned in the first subsection litera c, external surfaces and distance to nearby facilities should
- Guideline
- The facilities regulations
-
Fire in switchgear room at Sleipner BPublished:Havtil investigates fire in switchgear room at Sleipner B Fire in switchgear room at Sleipner B The Norwegian Ocean Industry Authority (Havtil) has initiated an investigation of a fire in a switchgear room
- News
- Process safety
- Emergency preparedness
-
PSA investigates fire on Gina KrogPublished:PSA investigates fire on Gina Krog The Petroleum Safety Authority Norway (PSA) has begun an investigation following a fire in a utility room in the living quarters on the Gina Krog facility on 21 June
- News
- Process safety
- Electrical installations
-
PSA investigates fire on Åsgard BPublished:PSA investigates fire on Åsgard B The Petroleum Safety Authority Norway (PSA) has decided to investigate a fire in a transformer on the Åsgard B facility on 14 November 2022. The Petroleum Safety Authority
- News
-
How to define "Worst Credible Process Fire"?Published:Credible Process Fire"? Sintef has been commissioned by the Petroleum Safety Authority Norway to perform a mapping and assessment of how the industry defines "Worst Credible Process Fire". Sintef has been
- Project report
- Process safety
-
PSA investigates fire at Snorre BPublished:launched an investigation into a fire which broke out on the Snorre B facility on 1 May 2019. The Petroleum Safety Authority Norway (PSA) has launched an investigation into a fire which broke out on the Snorre
- News
- Process safety
- Working environment
-
Equinor – Snøhvit - consent for use of Askeladd phase 1Published:consent comprises subsea facilities, pipelines, control cables and associated modifications at Hammerfest LNG. The Askeladd development is an extension of the Snøhvit field. The Askeladd development is divided
- Consent
- Use of facility
-
Equinor – Mongstad – investigation of short circuit and firePublished:investigation of short circuit and fire The Norwegian Ocean Industry Authority (Havtil) has completed the investigation of an undesirable incident involving a short circuit and fire in a panel in kiosk S at Equinor
- Investigation report
- Electrical installations
- Equinor
- Mongstad
-
Seadrill - West Phoenix - Investigation into firePublished:Seadrill - West Phoenix - Investigation into fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the fire in the mud laboratory on West Phoenix of 5 November 2018. Several
- Investigation report
- Electrical installations
- Emergency preparedness
- West Phoenix
-
Equinor – Tjeldbergodden – investigation of turbine breakdown and firePublished:investigation of turbine breakdown and fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the incident involving a turbine breakdown with subsequent fire in the methanol plant at Tjeldbergodden
- Investigation report
- Process safety
- Technical safety
- Maintenance management
- Emergency preparedness
- Working environment
- Equinor
- Tjeldbergodden
-
Saipem - Scarabeo 5 - Investigation of firePublished:Investigation of fire The PSA has completed its investigation of the fire which broke out on the mobile unit Scarabeo 5 during 22 November 2016. The PSA has completed its investigation of the fire which broke
- Investigation report
- Handling, cranes and lifting
- Process safety
- Scarabeo 5
- Saipem
-
Statoil - Statfjord A - Investigation of firePublished:Statoil - Statfjord A - Investigation of fire The PSA has completed its investigation of the fire which broke out in the utility shaft on Statfjord A on 16 October 2016. Breaches of the regulations have
- Investigation report
- Emergency preparedness
- Electrical installations
- Structural safety
- Technical safety
- Maintenance management
- Statoil
- Statfjord A
- Statoil
- Statfjord A
-
Equinor – Tjeldbergodden – investigation of turbine breakdown and firePublished:Tjeldbergodden – investigation of turbine breakdown and fire The PSA has completed its investigation of the incident involving a turbine breakdown with subsequent fire in the methanol plant at Tjeldbergodden. Serious
- Video
- Process safety
- Barrier management
- Risk management