What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Audit report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Audit report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Audit report
- Cyber security
- Statoil
-
Re § 15 Chemicals and chemical exposurechemicals, see Section 36 and Chapter XI of the Activities Regulations. For design and location as regards fire and explosion hazard as mentioned in the second subsection litera c, reference is made to Section
- Guideline
- The facilities regulations
-
RNNP 2007: Good development, but several serious incidentsPublished:2007 is statistically significant. Fires that are not linked to hydrocarbon leaks are among the major accident indicators that show a stabile level. Three such fires were reported last year, compared with
- News
- RNNP
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- West Bollsta
-
Equinor – Martin Linge – process safety and technical safetyPublished:in the follow-up of the maintenance programme for firefighting facilities Deficiencies in passive fire protection Follow-up of non-conformities During the audit, we also verified how Equinor has addressed
- Audit report
- Process safety
- Technical safety
- Equinor
- Martin Linge
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Audit report
- Emergency preparedness
- Haven
-
How are the regulations structured?Published:provisions is conferred by the Working Environment Act. In addition come the Pollution Control Act, the Fire and Explosion Protection Act and a number of health-related statutes. Norway’s oil and gas industry
- Article
-
Evaluating the effect of PSA investigationsPublished:incident with dropped riser joint Equinor – Tjeldbergodden – investigation of turbine breakdown and fire Equinor – Gullfaks C - investigation of oil spill KCA Deutag – Askeladden – investigation of incident
- News
- Risk management
-
Odfjell – Deepsea Atlantic – risk management, electrical facilities and safety instrumented systemsPublished:management Handling of non-conformities Ignition source control Ventilation system Firefighting Passive fire protection Open drainage Emergency lighting Lithium ion battery system Electrical facilities and installations
- Audit report
- Process safety
- Risk management
- Electrical installations
- Technical safety
- Deepsea Atlantic
- Odfjell Drilling AS
-
Eni Norge - Goliat - Electrical installationsPublished:identified in connection with: Gas detectors of HVAC intakes and ducts Organisation of electrical staff Fire detectors and manual activation of electrical isolation Test method for heating cables Personnel responsible
- Audit report
- Electrical installations
- Process safety
- Eni Norge
- Goliat FPSO
-
Equinor – Oseberg H – use of vessel with gangwayPublished:requirements of the Offshore Operation Manager, activation of emergency shutdown of Oseberg H, assessment of fire on the gangway-equipped vessel and competency requirements of gangway operators. What happens now
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Oseberg H
- Equinor
-
Dolphin & Wintershall - Borgland Dolphin - Emergency preparedness & Working environmentPublished:information for 3rd-party OHSs Verification of measures Securing of loose equipment in normal operations Fire stations. The improvement points concern: Working environment competence offshore Illumination of
- Audit report
- Working environment
- Emergency preparedness
- Dolphin
- Borgland Dolphin
-
Use of standards to promote safety in petroleum activities in the ArcticPublished:the use of standards in regulation: Drilling and well design in the Arctic Technical regulation of fire safety, especially in the extreme cold Evacuation and emergency preparedness, especially taking into
- Project report
- Risk management
- Well integrity
- Process safety
- Emergency preparedness
- High north
-
Premier Oil and the Bream developmentPublished:Result During the audit, an observation was made concerning the robustness of the proposed solution for fire water, which the PSA considers may present a challenge in terms of satisfying regulatory requirements
- Audit report
- Process safety
- Premier Oil
-
Aker BP - Ula - Emergency preparedness and helideckPublished:addition, improvement points were identified relating to: Verification of performance requirements Fire stations Lifeboats Safety assessments relating to maintenance and modification Working arrangements
- Audit report
- Emergency preparedness
- Aker BP
- Ula PP
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A
-
Point Resources - Jotun A - Risk, barrier and maintenance managementPublished:documentation of the impact of automatic water deluge in the event of confirmed gas detection, penetrations in fire walls, the emergency shutdown system, and planning and prioritisation. We have asked Point Resources
- Audit report
- Risk management
- Maintenance management
- Barrier management
- Point Resources
- Jotun A