Equinor – Grane – technical and operational barriersPublished:maintains a prudent HSE level. Result Two non-conformities were identified, concerning: Barrier management Fire protection In addition, three improvement points were identified, concerning: Barrier management in
- Audit report
- Technical safety
- Risk management
- Equinor
- Grane
-
Equinor – Snorre B – process safety and safety barriersPublished:protection Documentation In addition, two improvement points were identified, concerning: Passive fire protection Heat preservation of transmitters in the process safety system What happens next? We have
- Audit report
- Process safety
- Equinor
- Snorre B
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Audit report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Audit report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Audit report
- Cyber security
- Statoil
-
Investing in autonomousPublished:has been developed using subsea facilities and pipelines to the onshore facility at Melkøya near Hammerfest. Following the start-up of Askeladd Vest in autumn 2025, the pipeline length has been extended
- Feature
- Artificial intelligence
-
Re § 62 Ecotoxicological testing of chemicalsis considered to be a substance. All components of grease must be expressed in HOCNF. Chemicals in fire water systems have since 1st of January 2013 been covered by requirements for ecotoxicological testing
- Guideline
- The activities regulations
-
RNNP 2007: Good development, but several serious incidentsPublished:2007 is statistically significant. Fires that are not linked to hydrocarbon leaks are among the major accident indicators that show a stabile level. Three such fires were reported last year, compared with
- News
- RNNP
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- West Bollsta
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Audit report
- Emergency preparedness
- Haven
-
How are the regulations structured?Published:provisions is conferred by the Working Environment Act. In addition come the Pollution Control Act, the Fire and Explosion Protection Act and a number of health-related statutes. Norway’s oil and gas industry
- Article
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk
-
Premier Oil and the Bream developmentPublished:Result During the audit, an observation was made concerning the robustness of the proposed solution for fire water, which the PSA considers may present a challenge in terms of satisfying regulatory requirements
- Audit report
- Process safety
- Premier Oil
-
Evaluating the effect of PSA investigationsPublished:incident with dropped riser joint Equinor – Tjeldbergodden – investigation of turbine breakdown and fire Equinor – Gullfaks C - investigation of oil spill KCA Deutag – Askeladden – investigation of incident
- News
- Risk management
-
Use of standards to promote safety in petroleum activities in the ArcticPublished:the use of standards in regulation: Drilling and well design in the Arctic Technical regulation of fire safety, especially in the extreme cold Evacuation and emergency preparedness, especially taking into
- Project report
- Risk management
- Well integrity
- Process safety
- Emergency preparedness
- High north
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A
-
Aker BP - Ula - Emergency preparedness and helideckPublished:addition, improvement points were identified relating to: Verification of performance requirements Fire stations Lifeboats Safety assessments relating to maintenance and modification Working arrangements
- Audit report
- Emergency preparedness
- Aker BP
- Ula PP
-
Eni Norge AS - Goliat FPSO - Management of emergency preparednessPublished:In addition, improvement points were observed concerning the use of lifting equipment, scaffolding, fire team radio communication, alternative mustering station for response teams and changes to emergency
- Audit report
- Emergency preparedness
- Eni Norge
- Goliat FPSO
-
Point Resources - Jotun A - Risk, barrier and maintenance managementPublished:documentation of the impact of automatic water deluge in the event of confirmed gas detection, penetrations in fire walls, the emergency shutdown system, and planning and prioritisation. We have asked Point Resources
- Audit report
- Risk management
- Maintenance management
- Barrier management
- Point Resources
- Jotun A
-
Dolphin & Wintershall - Borgland Dolphin - Emergency preparedness & Working environmentPublished:information for 3rd-party OHSs Verification of measures Securing of loose equipment in normal operations Fire stations. The improvement points concern: Working environment competence offshore Illumination of
- Audit report
- Working environment
- Emergency preparedness
- Dolphin
- Borgland Dolphin