ConocoPhillips – Ekofisk – helideck and emergency preparednessPublished:accident scenario Deficiencies in follow-up of maintenance of DIFFS facility Lack of air capacity at fire station Shortcomings in continuous improvement system What happens now? We have asked ConocoPhillips
- Inspection report
- Emergency preparedness
- ConocoPhillips
- Ekofisk L
-
Esso – Slagentangen – emergency preparedness and decommissioning activitiesPublished:These concerned: Marking and signage of escape routes to the mustering station in the factory area Fire equipment cabinets were mislabelled and some lacked a contents list and equipment Missing emergency
- Inspection report
- Emergency preparedness
- Structural safety
- Risk management
- Barrier management
- Slagentangen
- Esso Norge
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Inspection report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Inspection report
- Equinor
- Grane
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Inspection report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Smashing of a cabin window by bad weather on Åsgard APublished:Equinor on the day it occurred. Stormy conditions have been blamed for the incident. The remains of a fire cabinet discovered inside the cabin suggests that it was responsible for smashing the window. Following
- News
- Structural safety
- Emergency preparedness
-
Aker BP – Valhall Flank North – emergency preparedness and helideckPublished:addition, two improvement points were identified, concerning: Use of resources for developing procedures Fire station and lifeboats for ensuring rapid and efficient evacuation and rescue What happens next? We
- Inspection report
- Aker BP
- Valhall Flanke Nord
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Inspection report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor
-
Rowan – Rowan Norway – emergency preparednessPublished:domain of emergency preparedness for Rowan Norway. Result Non-conformities were identified relating to: Fire protection Lifeboats Helicopter deck Signage and marking of evacuation routes Escape from lifts In
- Inspection report
- Emergency preparedness
- Rowan
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Inspection report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
Vår Energi – Goliat FPSO – management of technical barriers and maintenancePublished:Six non-conformities were identified, concerning: Barrier management Non-conformity handling Passive fire protection Overpressure protection Maintenance programme Procedures In addition, three improvement
- Inspection report
- Barrier management
- Maintenance management
- Goliat FPSO
-
Statoil - Grane - Electrical installations and Technical safetyPublished:electrical installations Emergency power system Transient voltage variations Emergency lighting The fire water system Non-conformity handling In addition, improvement points were detected in connection with:
- Inspection report
- Electrical installations
- Technical safety
- Statoil
- Grane
-
ExxonMobil - Ringhorne - Management of emergency preparednessPublished:preparedness management out on the facility. We also commented on an issue concerning the siting of the fire station's cabinet for search and rescue teams. We have given ExxonMobil a deadline of 8 May 2017 to
- Inspection report
- Emergency preparedness
- ExxonMobil
- Ringhorne
-
Statoil - Songa Offshore - Troll field - Drilling and well activitiesPublished:Intersecting wellbores Risk analyses Capacity and competence in Statoil's Troll organisation Well/fire service companies In addition, two improvement points were identified in connection with: Application
- Inspection report
- Working environment
- Well integrity
- Statoil
- Troll B
- Troll C
- Songa Endurance
-
Vår Energi – Goliat – management of technical barriers and maintenancePublished:non-conformity had not been addressed in line with the company’s feedback to us: Non-conformity concerning “Fire water supply” from chapter 5.1 of the report following the audit of 1 July 2015. Result No new non-conformities
- Inspection report
- Process safety
- Risk management
- Technical safety
- Barrier management
- Goliat FPSO
- Vår Energi
-
Equinor – Troll A – management of major accident risk and barriersPublished:concerned: Uncertainties in documents describing the organisational model Moisture in emergency lighting Fire resistance Explosion pressure Site-specific expertise What happens now? We have asked Equinor to report
- Inspection report
- Process safety
- Barrier management
- Risk management
- Troll A
- Equinor
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Inspection report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil
- Gullfaks A
-
Premier Oil - Bream - Project management, risk management and technical barriersPublished:Risk-reduction principles System for barrier management Transfer of experience Topside layout Passive fire protection
- Inspection report
- Risk management
- Technical safety
- Barrier management
- Premier Oil