What are you looking for?
420 hits in Complete website
Filters
Subjects
Year
Selected filters
-
PSA investigates incident on Sleipner APublished:Sleipner A after activation of smoke detectors in the transformer room and flame detectors in the fire pump room. This incident led to a shutdown and the mustering of personnel. No personal injuries have
- News
- Emergency preparedness
- Electrical installations
- Process safety
-
Composite repairs to pipe systemsPublished:provides an overview of the different repair solutions used in the petroleum industry since 1980. Fire resistance is not specifically addressed in the report. The report shows that the new ISO standard
- Project report
- Structural safety
- Maintenance management
-
Okea – Draugen – major accident risk and barriersPublished:These comprised: Basis for evaluating the effectiveness of maintenance Training and exercises Passive fire protection of fluid outlet separators Marking of equipment What happens next? We have asked Okea to
- Audit report
- Barrier management
- Process safety
- Draugen
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Audit report
- Process safety
- Risk management
- Wintershall
- Brage
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Audit report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Audit report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Audit report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Audit report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Aker BP - Ivar Aasen - Risk, barrier and maintenance managementPublished:decision-making Management and follow-up of temporary equipment Barrier management Penetrations and doors in fire walls Maintenance programme Labelling of equipment and systems Aker BP has been given a deadline of
- Audit report
- Risk management
- Maintenance management
- Barrier management
- Aker BP
- Ivar Aasen
-
Aker BP – Valhall Flank West – HelideckPublished:of the helideck. Result One non-conformity was identified in connection with the positioning of a fire station. An improvement point was also identified relating to the system for familiarising and training
- Audit report
- Emergency preparedness
- Aker BP
- Valhall Flanke Vest
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Audit report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Audit report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance
-
Equinor – Snorre A – barrier managementPublished:requirements. Result Five non-conformities were identified during the audit. These concerned: Passive fire protection Operational barriers Event notification procedure Factors with a potential to affect explosion
- Audit report
- Barrier management
- Process safety
- Equinor
- Snorre A
-
Equinor – Visund – technical safety and risk managementPublished:prioritisation Risk reduction Non-conformity handling Maintenance Ignition source control Passive fire protection We also observed one factor that we have chosen to categorize as an improvement point.
- Audit report
- Technical safety
- Risk management
- Equinor
- Visund
-
Esso – Slagentangen – emergency preparedness and decommissioning activitiesPublished:These concerned: Marking and signage of escape routes to the mustering station in the factory area Fire equipment cabinets were mislabelled and some lacked a contents list and equipment Missing emergency
- Audit report
- Emergency preparedness
- Structural safety
- Risk management
- Barrier management
- Slagentangen
- Esso Norge
-
Transocean Services – non-conformity handlingPublished:Training in the working environment In addition, an improvement point was identified concerning passive fire protection in machine rooms. What happens next? We have asked Transocean to report on how the non-conformities
- Audit report
- Working environment
- Risk management
- Transocean Offshore Ltd
-
Prosafe — Safe Boreas — emergency preparedness and working environmentPublished:training of the emergency response organisation Securing of evacuation routes and mustering stations Fire stations Headset in lifeboat and MOB Life jackets Emergency lighting in evacuation route The safety
- Audit report
- Working environment
- Emergency preparedness
- Prosafe Offshore
-
ConocoPhillips – Ekofisk – helideck and emergency preparednessPublished:accident scenario Deficiencies in follow-up of maintenance of DIFFS facility Lack of air capacity at fire station Shortcomings in continuous improvement system What happens now? We have asked ConocoPhillips
- Audit report
- Emergency preparedness
- ConocoPhillips
- Ekofisk L
-
Vår Energi – Gjøa – emergency preparedness and helideck operationsPublished:Lack of verification of performance requirements related to maritime surveillance Deficiencies at fire stations We also observed four factors that we have chosen to categorise as improvement points. These
- Audit report
- Emergency preparedness
- Gjøa