Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Inspection report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Equinor – Kvitebjørn – emergency preparedness and helideckPublished:board Location of workstation for maritime surveillance Maintenance of MOB boat suits Siting of the fire stations Redundancy in the absence of lifeboat coxswain What happens now? We have asked Equinor to
- Inspection report
- Emergency preparedness
- Equinor
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Inspection report
- Structural safety
- Process safety
- Statoil
- Visund
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Inspection report
- Cyber security
-
HSE impacts, consequences and opportunities from external power supply to petroleum facilitiesPublished:personnel required on board. Improved physical working environment. Reduced risk of gas leaks and fires. Simpler and faster completion in the project phase. Simpler removal. We will be elaborating on the
- Project report
- Process safety
- Electrical installations
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Inspection report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Inspection report
- Equinor
- Grane
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Inspection report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Smashing of a cabin window by bad weather on Åsgard APublished:Equinor on the day it occurred. Stormy conditions have been blamed for the incident. The remains of a fire cabinet discovered inside the cabin suggests that it was responsible for smashing the window. Following
- News
- Structural safety
- Emergency preparedness
-
Equinor – Troll A – management of major accident risk and barriersPublished:concerned: Uncertainties in documents describing the organisational model Moisture in emergency lighting Fire resistance Explosion pressure Site-specific expertise What happens now? We have asked Equinor to report
- Inspection report
- Process safety
- Barrier management
- Risk management
- Troll A
- Equinor
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Inspection report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
Vår Energi – Goliat – management of technical barriers and maintenancePublished:non-conformity had not been addressed in line with the company’s feedback to us: Non-conformity concerning “Fire water supply” from chapter 5.1 of the report following the audit of 1 July 2015. Result No new non-conformities
- Inspection report
- Process safety
- Risk management
- Technical safety
- Barrier management
- Goliat FPSO
- Vår Energi
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Inspection report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil
- Gullfaks A
-
Rowan – Rowan Norway – emergency preparednessPublished:domain of emergency preparedness for Rowan Norway. Result Non-conformities were identified relating to: Fire protection Lifeboats Helicopter deck Signage and marking of evacuation routes Escape from lifts In
- Inspection report
- Emergency preparedness
- Rowan
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Inspection report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor
-
ExxonMobil - Ringhorne - Management of emergency preparednessPublished:preparedness management out on the facility. We also commented on an issue concerning the siting of the fire station's cabinet for search and rescue teams. We have given ExxonMobil a deadline of 8 May 2017 to
- Inspection report
- Emergency preparedness
- ExxonMobil
- Ringhorne
-
Statoil - Songa Offshore - Troll field - Drilling and well activitiesPublished:Intersecting wellbores Risk analyses Capacity and competence in Statoil's Troll organisation Well/fire service companies In addition, two improvement points were identified in connection with: Application
- Inspection report
- Working environment
- Well integrity
- Statoil
- Troll B
- Troll C
- Songa Endurance