What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Audit report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Audit report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Audit report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Audit report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Audit report
- Statoil
- Heimdal
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Audit report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Audit report
- Process safety
- Ula DP
- Aker BP
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Audit report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP – Valhall Flank West – HelideckPublished:of the helideck. Result One non-conformity was identified in connection with the positioning of a fire station. An improvement point was also identified relating to the system for familiarising and training
- Audit report
- Emergency preparedness
- Aker BP
- Valhall Flanke Vest
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Audit report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Regulations relating to design and outfitting of facilities, etc. in the petroleum activitiesDNV-OS-D202, Automation, safety and telecommunication systems, Edition January 2017, DNV-OS-D301, Fire protection, Edition January 2017, DNV-OS-E101, Drilling facilities, Edition July 2021, DNV-OS-E201
- Regulation
-
§ 5 Design of facilitiesRegulations. The facilities shall be divided into main areas. The main areas shall be separated by fire and explosion divisions or sufficient physical distance to prevent escalation. Alternatively, a combination
- Paragraph
- The facilities regulations
-
§ 10a Ignition source controldo so from a central or strategic location, in accordance with the facility specific strategy for fire and explosion safety. 634-1033-F2025_1-10a
- Paragraph
- The facilities regulations
-
Aker BP – Valhall PWP – electrical facilitiesPublished:were identified in the following areas: Lack of documentation of risk assessment related to early fire detection in switchboard rooms Inadequate documentation of verification of the safety function of
- Audit report
- Electrical installations
- Process safety
- Valhall DP
- Aker BP
-
Equinor – Kvitebjørn – process safetyPublished:instrumented functions Deficiencies in overpressure protection Deficiencies in the compartmentalisation of fire areas Deficiencies in maintenance programme Deficiencies in classification Deficiencies in the independence
- Audit report
- Process safety
- Risk management
- Equinor
-
Vår Energi – Gjøa – emergency preparedness and helideck operationsPublished:Lack of verification of performance requirements related to maritime surveillance Deficiencies at fire stations We also observed four factors that we have chosen to categorise as improvement points. These
- Audit report
- Emergency preparedness
- Gjøa
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Audit report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Audit report
- Cyber security
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Audit report
- Structural safety
- Process safety
- Statoil
- Visund
-
HSE impacts, consequences and opportunities from external power supply to petroleum facilitiesPublished:personnel required on board. Improved physical working environment. Reduced risk of gas leaks and fires. Simpler and faster completion in the project phase. Simpler removal. We will be elaborating on the
- Project report
- Process safety
- Electrical installations