Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Inspection report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
§ 5 Design of facilitiesRegulations. The facilities shall be divided into main areas. The main areas shall be separated by fire and explosion divisions or sufficient physical distance to prevent escalation. Alternatively, a combination
- Paragraph
- The facilities regulations
-
Equinor – Heidrun – technical safety, process safety and electrical facilitiesPublished:we identified non-conformities within the following areas: Barriers Fixed firefighting facilities Fire doors Follow-up of non-conformities Marking of the arc flash energy level of panels In addition, we
- Inspection report
- Technical safety
- Process safety
- Electrical installations
- Equinor
- Heidrun
-
Vår Energi – Jotun FPSO – modification projectPublished:Alternative to central control room Independence of emergency shutdown function Start-up arrangements for fire pump drives We also identified an improvement point concerning systematic follow-up of alarms. What
- Inspection report
- Process safety
- Risk management
- Electrical installations
- Jotun A
- Vår Energi
-
§ 33 Emergency shut-down systemhydrocarbons and chemicals to and from the onshore facility, and which isolate the onshore facility's fire areas. 612-1033-F2025_1-33
- Paragraph
- Technical and operational regulations
-
§ 10a Ignition source controldo so from a central or strategic location, in accordance with the facility specific strategy for fire and explosion safety. 634-1033-F2025_1-10a
- Paragraph
- The facilities regulations
-
§ 33 Emergency shutdown systemand chemicals to and from the facility and to and from wells, and which isolate and/or partition the fire areas on the facility. 634-1033-F2025_1-33
- Paragraph
- The facilities regulations
-
Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Inspection report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Equinor – Kvitebjørn – emergency preparedness and helideckPublished:board Location of workstation for maritime surveillance Maintenance of MOB boat suits Siting of the fire stations Redundancy in the absence of lifeboat coxswain What happens now? We have asked Equinor to
- Inspection report
- Emergency preparedness
- Equinor
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Inspection report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Inspection report
- Equinor
- Grane
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Inspection report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Smashing of a cabin window by bad weather on Åsgard APublished:Equinor on the day it occurred. Stormy conditions have been blamed for the incident. The remains of a fire cabinet discovered inside the cabin suggests that it was responsible for smashing the window. Following
- News
- Structural safety
- Emergency preparedness
-
Vår Energi – Goliat FPSO – management of technical barriers and maintenancePublished:Six non-conformities were identified, concerning: Barrier management Non-conformity handling Passive fire protection Overpressure protection Maintenance programme Procedures In addition, three improvement
- Inspection report
- Barrier management
- Maintenance management
- Goliat FPSO
-
Premier Oil - Bream - Project management, risk management and technical barriersPublished:Risk-reduction principles System for barrier management Transfer of experience Topside layout Passive fire protection
- Inspection report
- Risk management
- Technical safety
- Barrier management
- Premier Oil
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Inspection report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil
- Gullfaks A
-
Total - Martin Linge - Production facility engineeringPublished:identified one non-conformity associated with the depressurisation of pressure tanks in the case of fire. In addition, two improvement points were identified concerning clarity and consistency in governing
- Inspection report
- Technical safety
- Process safety
- Total E&P Norge
- Martin Linge
-
Equinor – Snorre Expansion Project – operational auditPublished:In addition, two improvement points were identified, relating to: Overview of weaknesses in passive fire protection Non-conformity handling What happens next? We have asked Equinor to report on how the non-conformity
- Inspection report
- Emergency preparedness
- Process safety
- Structural safety
- Risk management
- Snorre A
- Equinor