PSA investigates incident on Sleipner APublished:Sleipner A after activation of smoke detectors in the transformer room and flame detectors in the fire pump room. This incident led to a shutdown and the mustering of personnel. No personal injuries have
- News
- Emergency preparedness
- Electrical installations
- Process safety
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Inspection report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Inspection report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Inspection report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Inspection report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Inspection report
- Statoil
- Heimdal
-
Aker BP - Ivar Aasen - Risk, barrier and maintenance managementPublished:decision-making Management and follow-up of temporary equipment Barrier management Penetrations and doors in fire walls Maintenance programme Labelling of equipment and systems Aker BP has been given a deadline of
- Inspection report
- Risk management
- Maintenance management
- Barrier management
- Aker BP
- Ivar Aasen
-
ConocoPhillips - Ekofisk 2/4 J - Technical safety and process safetyPublished:non-conformities Pressure tanks Documentation In addition, improvement points were identified in connection with: Fire water Process shutdown valve Ignition sources Evacuation routes Acceptance criteria
- Inspection report
- Technical safety
- Process safety
- ConocoPhillips
- Ekofisk J
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Inspection report
- Emergency preparedness
- OSM Offshore as
- Haven
-
ExxonMobil - Jotun A - Management of crane and lifting operations and management of lifting equipmentPublished:control of lifting equipment Materials handling plan MOB boat Liferaft Scaffolding Exhaust exposure of fire pump In addition, improvement points were identified in connection with: Technical features of the
- Inspection report
- Handling, cranes and lifting
- Technical safety
- ExxonMobil
- Jotun A
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Inspection report
- Process safety
- Risk management
- Wintershall
- Brage
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Inspection report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Inspection report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Aker BP – Valhall Flank West – HelideckPublished:of the helideck. Result One non-conformity was identified in connection with the positioning of a fire station. An improvement point was also identified relating to the system for familiarising and training
- Inspection report
- Emergency preparedness
- Aker BP
- Valhall Flanke Vest
-
Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Inspection report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance
-
Equinor – Visund – technical safety and risk managementPublished:prioritisation Risk reduction Non-conformity handling Maintenance Ignition source control Passive fire protection We also observed one factor that we have chosen to categorize as an improvement point.
- Inspection report
- Technical safety
- Risk management
- Equinor
- Visund
-
Equinor – Snorre A – barrier managementPublished:requirements. Result Five non-conformities were identified during the audit. These concerned: Passive fire protection Operational barriers Event notification procedure Factors with a potential to affect explosion
- Inspection report
- Barrier management
- Process safety
- Equinor
- Snorre A
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Inspection report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Transocean Services – non-conformity handlingPublished:Training in the working environment In addition, an improvement point was identified concerning passive fire protection in machine rooms. What happens next? We have asked Transocean to report on how the non-conformities
- Inspection report
- Working environment
- Risk management
- Transocean Offshore Ltd