What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Audit report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
PSA investigates incident on Sleipner APublished:Sleipner A after activation of smoke detectors in the transformer room and flame detectors in the fire pump room. This incident led to a shutdown and the mustering of personnel. No personal injuries have
- News
- Emergency preparedness
- Electrical installations
- Process safety
-
Composite repairs to pipe systemsPublished:provides an overview of the different repair solutions used in the petroleum industry since 1980. Fire resistance is not specifically addressed in the report. The report shows that the new ISO standard
- Project report
- Structural safety
- Maintenance management
-
Okea – Draugen – major accident risk and barriersPublished:These comprised: Basis for evaluating the effectiveness of maintenance Training and exercises Passive fire protection of fluid outlet separators Marking of equipment What happens next? We have asked Okea to
- Audit report
- Barrier management
- Process safety
- Draugen
-
ExxonMobil - Jotun A - Management of crane and lifting operations and management of lifting equipmentPublished:control of lifting equipment Materials handling plan MOB boat Liferaft Scaffolding Exhaust exposure of fire pump In addition, improvement points were identified in connection with: Technical features of the
- Audit report
- Handling, cranes and lifting
- Technical safety
- ExxonMobil
- Jotun A
-
ConocoPhillips - Ekofisk 2/4 J - Technical safety and process safetyPublished:non-conformities Pressure tanks Documentation In addition, improvement points were identified in connection with: Fire water Process shutdown valve Ignition sources Evacuation routes Acceptance criteria
- Audit report
- Technical safety
- Process safety
- ConocoPhillips
- Ekofisk J
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Audit report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Audit report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Audit report
- Process safety
- Risk management
- Wintershall
- Brage
-
Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Audit report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance
-
Aker BP - Ivar Aasen - Risk, barrier and maintenance managementPublished:decision-making Management and follow-up of temporary equipment Barrier management Penetrations and doors in fire walls Maintenance programme Labelling of equipment and systems Aker BP has been given a deadline of
- Audit report
- Risk management
- Maintenance management
- Barrier management
- Aker BP
- Ivar Aasen
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Audit report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Audit report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Audit report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Audit report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Audit report
- Statoil
- Heimdal
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Audit report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Audit report
- Process safety
- Ula DP
- Aker BP
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Audit report
- Process safety
- Barrier management
- Jotun A
- Vår Energi