AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – electrical facilities, technical safety and ICT securityPublished:Ignition source control Ventilation systems Emergency power systems Emergency lighting Fire fighting Passive fire protection Electrical facilities and installations Work in and operation of electrical
- Audit report
- Process safety
- Cyber security
- Electrical installations
- Technical safety
- Odfjell Drilling AS
- Deepsea Aberdeen
-
Equinor – Gullfaks B – holistic risk and barrier management, and robust operation and maintenancePublished:Result In the audit, we identified five non-conformities. These comprised: Barrier management Passive fire protection Escape routes from rooms for high voltage installations Risk analyses Risk reduction We
- Audit report
- Barrier management
- Risk management
- Equinor
- Gullfaks B
-
Regulations relating to technical and operational matters at onshore facilities in the petroleum activities, etc2002 No. 20 relating to protection against fire, explosion and accidents with dangerous substances and relating to the fire department's rescue tasks (the Fire and Explosion Protection Act), Section 10-18
- Regulation
-
AoC audit – Odfjell Drilling – Deepsea Yantai – Electrical facilities and technical safetyPublished:modifications Electrotechnical system analyses The fire water system Area classification and associated requirements Inadequate ignition source decoupling Pneumatic fire doors Emergency lighting installation Emergency
- Audit report
- Electrical installations
- Technical safety
- Odfjell Drilling AS
-
Equinor - Johan Castberg - investigation of the reasons for the challenges faced in constructing hull and equipmentPublished:identified, and Equinor h Johan Castberg lies in the Barents Sea, 240 kilometres north-west of Hammerfest. The field is being developed with a floating production, storage and offloading (FPSO) facility
- Investigation report
- Structural safety
- Risk management
- Johan Castberg
- Equinor
-
Neptune Energy – Gjøa – follow-up of ongoing projectsPublished:point. The non-conformities concerned deficiencies in fixed fire-fighting facilities and a lack of assessment of new knowledge concerning fires. The improvement point concerned overpressure protection. Follow-up
- Audit report
- Technical safety
- Process safety
- Electrical installations
- Neptune Energy
- Gjøa
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Audit report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Equinor – Statfjord C – process safety, technical safety, maintenance management and risk managementPublished:Barrier management Risk management Maintenance management Overpressure protection and flaring capacity Fire integrity Firefighting Open drainage system Work on pressurised hydrocarbon-carrying systems and other
- Audit report
- Process safety
- Technical safety
- Maintenance management
- Risk management
- Equinor
- Statfjord C
-
Equinor – Sture and Kollsnes – electrical facilities and the working environmentPublished:Electrical facilities (Kollsnes) Follow-up of hired electrical personnel (Kollsnes & Sture) Barriers for fire prevention in substations (Kollsnes & Sture) Maintenance of emergency lighting and marking of barrier
- Audit report
- Working environment
- Electrical installations
- Process safety
- Equinor
- Sture
- Kollsnes
-
Regulations relating to design and outfitting of facilities, etc. in the petroleum activitiesDNV-OS-D202, Automation, safety and telecommunication systems, Edition January 2017, DNV-OS-D301, Fire protection, Edition January 2017, DNV-OS-E101, Drilling facilities, Edition July 2021, DNV-OS-E201
- Regulation
-
Equinor – Tjeldbergodden – emergency response and major accidentsPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station. What happens next? We have asked Equinor to report by 20 December 2024 on how the non-conformities
- Audit report
- Emergency preparedness
- Risk management
- Tjeldbergodden
- Equinor
-
Equinor – Gullfaks B – corrosion under insulationPublished:comply with company and regulatory requirements. Result We identified one non-conformity concerning fire protection of a structure. We also identified four improvement points. These concerned: Pipe insulation
- Audit report
- Structural safety
- Equinor
- Gullfaks B
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Audit report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Audit report
- Process safety
- Ula DP
- Aker BP
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Audit report
- Statoil
- Heimdal
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Audit report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
ExxonMobil - Jotun A - Management of crane and lifting operations and management of lifting equipmentPublished:control of lifting equipment Materials handling plan MOB boat Liferaft Scaffolding Exhaust exposure of fire pump In addition, improvement points were identified in connection with: Technical features of the
- Audit report
- Handling, cranes and lifting
- Technical safety
- ExxonMobil
- Jotun A
-
ConocoPhillips - Ekofisk 2/4 J - Technical safety and process safetyPublished:non-conformities Pressure tanks Documentation In addition, improvement points were identified in connection with: Fire water Process shutdown valve Ignition sources Evacuation routes Acceptance criteria
- Audit report
- Technical safety
- Process safety
- ConocoPhillips
- Ekofisk J
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Audit report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Audit report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil