What are you looking for?
413 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Inspection report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Equinor - Heidrun - Process facility and transport systemPublished:programme for flexible jumpers Overview of containment barriers Follow-up of technical condition Passive fire protection of equipment Equinor has been given a deadline of 10 December 2018 to report on how the
- Inspection report
- Handling, cranes and lifting
- Process safety
- Barrier management
- Structural safety
- Heidrun
- Equinor
- Statoil
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Inspection report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Inspection report
- Statoil
- Heimdal
-
Composite repairs to pipe systemsPublished:provides an overview of the different repair solutions used in the petroleum industry since 1980. Fire resistance is not specifically addressed in the report. The report shows that the new ISO standard
- Project report
- Structural safety
- Maintenance management
-
Teekay Petrojarl Production AS – Petrojarl Knarr – electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance management Emergency power systems Emergency lighting Consequences of worst credible process fire Risk assessment of health hazards from electromagnetic fields Work in and operation of electrical
- Inspection report
- Technical safety
- Electrical installations
- Teekay
- Petrojarl Knarr
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Inspection report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Inspection report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance
-
Statoil - Oseberg Sør - Emergency preparedness and Technical safetyPublished:identified in connection with: Emergency plans System for training deputies Actions in the event of a fire in the cement pump room Alarm control room Statoil has been given a deadline of 30 October 2017 to
- Inspection report
- Process safety
- Emergency preparedness
- Technical safety
- Statoil
- Oseberg SØR
-
Statoil - Heidrun - Major accident and Working environment riskPublished:training Condition assessment of deck gratings in gangways Consequences of Worst Credible Process Fire Resources relative to planned activities Statoil has been given a deadline of 27 October 2017 to report
- Inspection report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Heidrun
-
Aker BP - Ivar Aasen - Risk, barrier and maintenance managementPublished:decision-making Management and follow-up of temporary equipment Barrier management Penetrations and doors in fire walls Maintenance programme Labelling of equipment and systems Aker BP has been given a deadline of
- Inspection report
- Risk management
- Maintenance management
- Barrier management
- Aker BP
- Ivar Aasen
-
Wintershall - Brage - Management of maintenance and barriersPublished:Result Three non-conformities were identified in the following areas: Barrier management Passive fire protection Documentation Three aspects with potential for improvement were also identified: Short-term
- Inspection report
- Process safety
- Risk management
- Wintershall
- Brage
-
OSM Offshore - Haven - Emergency preparedness and the helideckPublished:management of emergency preparedness and the helideck. A non-conformity was observed in relation to fire stations, as well as improvement points relating to training of the emergency preparedness organisation
- Inspection report
- Emergency preparedness
- OSM Offshore as
- Haven
-
Maersk Drilling - Maersk Intrepid - Management of emergency preparedness and employee participationPublished:organisation offshore, maintenance of doors and emergency preparedness equipment, the design and follow-up of fire stations, the securing of loose equipment, emergency lighting, emergency preparedness assessments
- Inspection report
- Emergency preparedness
- Working environment
- Maersk Drilling
-
Equinor – Snorre A – barrier managementPublished:requirements. Result Five non-conformities were identified during the audit. These concerned: Passive fire protection Operational barriers Event notification procedure Factors with a potential to affect explosion
- Inspection report
- Barrier management
- Process safety
- Equinor
- Snorre A
-
Equinor – Visund – technical safety and risk managementPublished:prioritisation Risk reduction Non-conformity handling Maintenance Ignition source control Passive fire protection We also observed one factor that we have chosen to categorize as an improvement point.
- Inspection report
- Technical safety
- Risk management
- Equinor
- Visund
-
Esso – Slagentangen – emergency preparedness and decommissioning activitiesPublished:These concerned: Marking and signage of escape routes to the mustering station in the factory area Fire equipment cabinets were mislabelled and some lacked a contents list and equipment Missing emergency
- Inspection report
- Emergency preparedness
- Structural safety
- Risk management
- Barrier management
- Slagentangen
- Esso Norge
-
Transocean Services – non-conformity handlingPublished:Training in the working environment In addition, an improvement point was identified concerning passive fire protection in machine rooms. What happens next? We have asked Transocean to report on how the non-conformities
- Inspection report
- Working environment
- Risk management
- Transocean Offshore Ltd
-
Prosafe — Safe Boreas — emergency preparedness and working environmentPublished:training of the emergency response organisation Securing of evacuation routes and mustering stations Fire stations Headset in lifeboat and MOB Life jackets Emergency lighting in evacuation route The safety
- Inspection report
- Working environment
- Emergency preparedness
- Prosafe Offshore
-
ConocoPhillips – Ekofisk – helideck and emergency preparednessPublished:accident scenario Deficiencies in follow-up of maintenance of DIFFS facility Lack of air capacity at fire station Shortcomings in continuous improvement system What happens now? We have asked ConocoPhillips
- Inspection report
- Emergency preparedness
- ConocoPhillips
- Ekofisk L