What are you looking for?
1622 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
-
Equinor – Aasta Hansteen – investigation of gas leakPublished:
- Investigation report
- Process safety
- Aasta Hansteen
- Equinor
-
Equinor/Floatel International - Floatel Endurance - investigation of unintentional gangway disconnectionPublished:
- Investigation report
- Structural safety
- Emergency preparedness
- Working environment
- Floatel International
- Floatel Endurance
- Equinor
- Martin Linge
-
Equinor – Aasta Hansteen – barriers for structures, maritime systems and risersPublished:
- Inspection report
- Equinor
- Aasta Hansteen
-
Equinor – Johan Sverdrup phase 2 – design engineering and follow-up of barriers and modificationPublished:
- Inspection report
- Emergency preparedness
- Process safety
- Risk management
- Johan Sverdrup
- Equinor
-
Gassco and Shell – Nyhamna – management of activities and operationsPublished:
- Inspection report
- Structural safety
- Emergency preparedness
- Process safety
- Gassco
- Nyhamna
- ShellEnterprise
-
AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – logisticsPublished:
- Inspection report
- Handling, cranes and lifting
- Odfjell Drilling AS
- Deepsea Aberdeen
-
AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – emergency preparedness, helideck and drinking waterPublished:
- Inspection report
- Emergency preparedness
- Odfjell Drilling AS
- Deepsea Aberdeen
-
Aker BP – organisation and follow-up of responsibility for helidecksPublished:
- Inspection report
- Emergency preparedness
- Aker BP
-
Equinor – Sleipner B – management’s follow-up of the integrity and maintenance of structuresPublished:
- Inspection report
- Structural safety
- Equinor
- Sleipner
-
Wintershall Dea – corporate governancePublished:
- Inspection report
- Wintershall
-
Aker BP – HSE managementPublished:
- Inspection report
- Aker BP
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Troll/Songa Endurance - Investigation of well control incidentPublished:
- Investigation report
- Emergency preparedness
- Well integrity
- Statoil
- Troll B
- Songa Endurance
-
Statoil - Gullfaks B - Investigation of crane incidentPublished:
- Investigation report
- Handling, cranes and lifting
- Well integrity
- Statoil
- Gullfaks B
-
Statoil - Sture terminal - Investigation of work accidentPublished:
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Statoil
- Sture
-
Statoil - Mongstad - Investigation of gas leakPublished:
- Investigation report
- Emergency preparedness
- Structural safety
- Process safety
- Statoil
- Mongstad
-
Saipem - Scarabeo 5 - Investigation of firePublished:
- Investigation report
- Handling, cranes and lifting
- Process safety
- Scarabeo 5
- Saipem
-
Statoil - Statfjord A - Investigation of firePublished:
- Investigation report
- Emergency preparedness
- Electrical installations
- Structural safety
- Technical safety
- Maintenance management
- Statoil
- Statfjord A
- Statoil
- Statfjord A
-
Statoil – Åsgard – underwater compression projectPublished:
- Inspection report
- Emergency preparedness
- Well integrity
- Structural safety
- Process safety
- Statoil
-
Lundin – location-specific emergency preparedness in the High NorthPublished:
- Inspection report
- Emergency preparedness
- Lundin
- Transocean Arctic