What are you looking for?
250 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Shell - Knarr FPSO - Flexible risers - Transfer lines and associated safety equipmentPublished:protection of gas export pipeline Follow-up of overpressure protection performance requirements Passive fire protection Follow-up of flexible pipelines In addition, improvement points were detected in connection
- Audit report
- Process safety
- Structural safety
- Petrojarl Knarr
- Shell
-
Order to Statoil - Heimdal - Operations - Maintenance - Safety-critical equipment - Pressure-safety systemsPublished:regulations. The non-conformities concern the management of activities on HMP and HRP, barrier management, fire protection within the plant, the independence of the process safety systems, governing documents,
- Audit report
- Statoil
- Heimdal
-
Ocean Rig AS – Leiv Eiriksson – logistics and maintenance managementPublished:respect of the helifuel skid Maintenance Safety-critical pressure gauges Preservation Siting of the fire station No improvement points were identified. What happens next? We have asked Ocean Rig to report
- Audit report
- Emergency preparedness
- Maintenance management
- Leiv Eiriksson
- Ocean Rig AS
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:Overview of barrier performance and follow-up of safety functions Classification of logic testing for the fire and gas system Alarms in the event of loss of overpressure in rooms Overview of disconnected safety
- Audit report
- Process safety
- Ula DP
- Aker BP
-
Vår Energi – Jotun FPSO – barrier managementPublished:non-conformities within the following areas were identified: Barrier management Fixed firefighting facilities Fire wall design We also observed the following factor that we have chosen to categorise as an improvement
- Audit report
- Process safety
- Barrier management
- Jotun A
- Vår Energi
-
Aker BP – Valhall Flank West – HelideckPublished:of the helideck. Result One non-conformity was identified in connection with the positioning of a fire station. An improvement point was also identified relating to the system for familiarising and training
- Audit report
- Emergency preparedness
- Aker BP
- Valhall Flanke Vest
-
Equinor – Visund – technical safety and risk managementPublished:prioritisation Risk reduction Non-conformity handling Maintenance Ignition source control Passive fire protection We also observed one factor that we have chosen to categorize as an improvement point.
- Audit report
- Technical safety
- Risk management
- Equinor
- Visund
-
Esso – Slagentangen – emergency preparedness and decommissioning activitiesPublished:These concerned: Marking and signage of escape routes to the mustering station in the factory area Fire equipment cabinets were mislabelled and some lacked a contents list and equipment Missing emergency
- Audit report
- Emergency preparedness
- Structural safety
- Risk management
- Barrier management
- Slagentangen
- Esso Norge
-
Equinor – Snorre A – barrier managementPublished:requirements. Result Five non-conformities were identified during the audit. These concerned: Passive fire protection Operational barriers Event notification procedure Factors with a potential to affect explosion
- Audit report
- Barrier management
- Process safety
- Equinor
- Snorre A
-
Transocean Services – non-conformity handlingPublished:Training in the working environment In addition, an improvement point was identified concerning passive fire protection in machine rooms. What happens next? We have asked Transocean to report on how the non-conformities
- Audit report
- Working environment
- Risk management
- Transocean Offshore Ltd
-
Prosafe — Safe Boreas — emergency preparedness and working environmentPublished:training of the emergency response organisation Securing of evacuation routes and mustering stations Fire stations Headset in lifeboat and MOB Life jackets Emergency lighting in evacuation route The safety
- Audit report
- Working environment
- Emergency preparedness
- Prosafe Offshore
-
ConocoPhillips – Ekofisk – helideck and emergency preparednessPublished:accident scenario Deficiencies in follow-up of maintenance of DIFFS facility Lack of air capacity at fire station Shortcomings in continuous improvement system What happens now? We have asked ConocoPhillips
- Audit report
- Emergency preparedness
- ConocoPhillips
- Ekofisk L
-
AoC audit – Odfjell Drilling – Deepsea Yantai – Electrical facilities and technical safetyPublished:modifications Electrotechnical system analyses The fire water system Area classification and associated requirements Inadequate ignition source decoupling Pneumatic fire doors Emergency lighting installation Emergency
- Audit report
- Electrical installations
- Technical safety
- Odfjell Drilling AS
-
Noble – Noble Invincible – risk management, electrical facilities, safety instrumented systems and technical safetyPublished:Maintenance programme Work in and operation of electrical facilities Electrical facilities Passive fire protection Fire alarm system We also observed two factors that we have chosen to categorise as improvement
- Audit report
- Electrical installations
- Technical safety
- Risk management
- Maersk Invincible
- Noble Drilling
-
Vår Energi – Gjøa – emergency preparedness and helideck operationsPublished:Lack of verification of performance requirements related to maritime surveillance Deficiencies at fire stations We also observed four factors that we have chosen to categorise as improvement points. These
- Audit report
- Emergency preparedness
- Gjøa
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Audit report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Audit report
- Cyber security
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Audit report
- Structural safety
- Process safety
- Statoil
- Visund
-
Equinor - Johan Castberg - investigation of the reasons for the challenges faced in constructing hull and equipmentPublished:identified, and Equinor h Johan Castberg lies in the Barents Sea, 240 kilometres north-west of Hammerfest. The field is being developed with a floating production, storage and offloading (FPSO) facility
- Investigation report
- Structural safety
- Risk management
- Johan Castberg
- Equinor
-
Aker BP – Valhall PWP – electrical facilitiesPublished:were identified in the following areas: Lack of documentation of risk assessment related to early fire detection in switchboard rooms Inadequate documentation of verification of the safety function of
- Audit report
- Electrical installations
- Process safety
- Valhall DP
- Aker BP