Transocean – Transocean Endurance – Working environment and emergency preparednessPublished:Siting of the sprinkler system at the exterior lifeboat mustering station Security measures against fire escalation in the engine room Training and drills Escape routes/securing of equipment in the living
- Inspection report
- Emergency preparedness
- Working environment
- Transocean Offshore Ltd
- Songa Endurance
-
Lundin - Edvard Grieg - Barrier managementPublished:identified in connection with: Human-machine interfaces and information presentation Safety systems The fire pumps Module training Rescue of personnel from lockable cabins Coordinating working environment committee
- Inspection report
- Working environment
- Emergency preparedness
- Structural safety
- Process safety
- Barrier management
- Lundin
- Edvard Grieg
-
Transocean Services – non-conformity handlingPublished:Training in the working environment In addition, an improvement point was identified concerning passive fire protection in machine rooms. What happens next? We have asked Transocean to report on how the non-conformities
- Inspection report
- Working environment
- Risk management
- Transocean Offshore Ltd
-
Prosafe — Safe Boreas — emergency preparedness and working environmentPublished:training of the emergency response organisation Securing of evacuation routes and mustering stations Fire stations Headset in lifeboat and MOB Life jackets Emergency lighting in evacuation route The safety
- Inspection report
- Working environment
- Emergency preparedness
- Prosafe Offshore
-
ConocoPhillips – Ekofisk – helideck and emergency preparednessPublished:accident scenario Deficiencies in follow-up of maintenance of DIFFS facility Lack of air capacity at fire station Shortcomings in continuous improvement system What happens now? We have asked ConocoPhillips
- Inspection report
- Emergency preparedness
- ConocoPhillips
- Ekofisk L
-
Esso – Slagentangen – emergency preparedness and decommissioning activitiesPublished:These concerned: Marking and signage of escape routes to the mustering station in the factory area Fire equipment cabinets were mislabelled and some lacked a contents list and equipment Missing emergency
- Inspection report
- Emergency preparedness
- Structural safety
- Risk management
- Barrier management
- Slagentangen
- Esso Norge
-
Equinor/KCAD – Njord A – materials handling and emergency preparednessPublished:points. This concerned: Secondary escape routes for offshore cranes (Equinor) Maintenance (Equinor) Fire stations and emergency preparedness (Equinor) System for training and drills (Equinor) What happens
- Inspection report
- Emergency preparedness
- Handling, cranes and lifting
- Equinor
- Njord A
-
Participants' handling of ICT securityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. Objective The objective of the audit was to investigate
- Inspection report
- Cyber security
-
Total - Martin Linge PU - Implementation of technical barriers in the fabrication phasePublished:the event of gas detection. In addition, two improvement points were identified in connection with: Fire class designation Emergency shutdown and process safety Total has been given a deadline of 1 December
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Statoil - Visund - Integrity and barrier management of flexible risersPublished:regulatory requirements. Result Two non-conformities were identified in connection with: Process fires System for emergency shutdown In addition, six improvement points were identified in connection with:
- Inspection report
- Structural safety
- Process safety
- Statoil
- Visund
-
Equinor – Kvitebjørn – emergency preparedness and helideckPublished:board Location of workstation for maritime surveillance Maintenance of MOB boat suits Siting of the fire stations Redundancy in the absence of lifeboat coxswain What happens now? We have asked Equinor to
- Inspection report
- Emergency preparedness
- Equinor
-
AoC audit – Shelf Drilling – Barsk – electrical systems and technical safetyPublished:non-conformities during the audit. These concerned: Barrier management Non-conformity handling Competence Fire barriers Electrical safety Analyses What happens now? We have asked Shelf Drilling to report to us
- Inspection report
- Electrical installations
- Process safety
- Barrier management
- Technical safety
- Shelf Drilling Barsk
- Noble Lloyd Noble
-
Equinor – Grane – emergency preparedness and helideckPublished:were identified, concerning: signage and marking of evacuation routes sprinkler system for lifeboats fire extinguishing system on helideck In addition, three improvement points were identified, concerning:
- Inspection report
- Equinor
- Grane
-
KCA Deutag – Askepott – technical safety and electrical systemsPublished:barrier system Deficient operational and organisational performance requirements Deficiencies in passive fire protection Deficiencies in ignition source control Deficient follow-up of temporary installations
- Inspection report
- Electrical installations
- Technical safety
- KCA Deutag
- Askepott
-
Equinor – Troll A – management of major accident risk and barriersPublished:concerned: Uncertainties in documents describing the organisational model Moisture in emergency lighting Fire resistance Explosion pressure Site-specific expertise What happens now? We have asked Equinor to report
- Inspection report
- Process safety
- Barrier management
- Risk management
- Troll A
- Equinor
-
Equinor – Valemon – maintenance management and technical safetyPublished:audit identified three non-conformities and one improvement point. The non-conformities concerned: The fire water system Barrier management Maintenance management The improvement point concerned deficiencies
- Inspection report
- Process safety
- Maintenance management
- Technical safety
- Equinor
- Valemon
-
Vår Energi – Goliat – management of technical barriers and maintenancePublished:non-conformity had not been addressed in line with the company’s feedback to us: Non-conformity concerning “Fire water supply” from chapter 5.1 of the report following the audit of 1 July 2015. Result No new non-conformities
- Inspection report
- Process safety
- Risk management
- Technical safety
- Barrier management
- Goliat FPSO
- Vår Energi
-
Floatel International - Floatel Superior - Emergency preparedness and at-risk groupsPublished:connection with: Competence and clarification of responsibilities Chemicals Analyses Training and drills Fire stations In addition, improvement points were identified in connection with: Procedures Maintenance
- Inspection report
- Working environment
- Emergency preparedness
- Floatel International
- Floatel Superior
-
BP - Skarv FPSO - Risk management, technical safety and safety instrumented systemsPublished:identified in connection with: Risk analyses and risk management Performance requirements Documentation Fire water in the event of gas detection Man-machine interfaces In addition, improvement points were identified
- Inspection report
- Risk management
- Technical safety
- Process safety
- BP
- Skarv FPSO
-
Statoil - Gullfaks A - VedlikeholdsstyringPublished:participation. Result Non-conformities were identified in connection with: Employee participation Planning Fire divisions In addition, improvement points were identified in connection with: Goals and requirements
- Inspection report
- Maintenance management
- Statoil