ExxonMobil - Balder FPU - BarrierPublished:connector deck The maintenance system The emergency shutdown system Passive fire protection of the gas emissions system Fire water Documentation ExxonMobil has been given a deadline of 30 June 2015 to
- Inspection report
- Barrier management
- Technical safety
- Process safety
- Structural safety
- ExxonMobil
- Balder
-
Statoil Aasta Hansteen - Development projectPublished:non-conformity was identified in connection with fire barriers in the accommodation quarters. In addition, an improvement point was identified in connection with passive fire protection. Statoil has been given a deadline
- Inspection report
- Statoil
-
ConocoPhillips - Eldfisk 2/7 S - Development projectPublished:Non-conformities were identified in connection with: The fire water system Fire design loads In addition, improvement points were identified in connection with: Fire design loads Instructions for operating emergency
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Risk management
- ConocoPhillips
- Eldfisk S
-
Neptune Energy – Gjøa – Technical barriers and follow-up of condensate leakPublished:June 2017. Result Non-conformities were identified relating to: The fire water system Procedure for fracture calculations Passive fire protection Updated analyses and assessments In addition, improvement
- Inspection report
- Structural safety
- Process safety
- Barrier management
- Technical safety
- Neptune Energy
- Gjøa
-
Equinor – Njord A – technical safety, process safety and electrical facilitiesPublished:non-conformities were identified during the audit. These comprised: passive fire protection response time of the fire water system manual fire water equipment follow-up marking in the field electrical facilities
- Inspection report
- Process safety
- Technical safety
- Electrical installations
- Equinor
- Njord A
-
ExxonMobil - Ringhorne - Barrier managementPublished:requirements and penetrations in fire walls. We also found four improvement points. These included automatic fire water discharge in the event of confirmed gas detection, passive fire protection, gas detection
- Inspection report
- Barrier management
- ExxonMobil
- Ringhorne
-
Statoil - Troll C - Barrier management - Technical safety - Electrical systemsPublished:Non-conformities were identified in connection with: Pressure surges in the fire water system Design accident loads for fires Emergency shutdown and process safety systems Labelling of battery banks In
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Troll C
-
Equinor - Gudrun - BarriersPublished:loads for fires and of deficient non-conformity handling. We also identified improvement points linked to barrier management, passive fire protection, function testing of facilities for fire-fighting,
- Inspection report
- Process safety
- Technical safety
- Electrical installations
- Barrier management
- Gudrun
- Equinor
- Statoil
-
Equinor – Heidrun – technical safety, process safety and electrical facilitiesPublished:we identified non-conformities within the following areas: Barriers Fixed firefighting facilities Fire doors Follow-up of non-conformities Marking of the arc flash energy level of panels In addition, we
- Inspection report
- Technical safety
- Process safety
- Electrical installations
- Equinor
- Heidrun
-
Esso – Slagentangen – investigation of naphtha leakPublished:ignited and caused a fire in the pipestill. The absence of fire and gas detectors means that the detection of any ignition would have depended on its discovery by refinery personnel. A fire could potentially
- Investigation report
- Process safety
- Emergency preparedness
- Structural safety
- Esso Norge
- Slagentangen
-
Equinor – Oseberg Øst – major accident risk, barriers and emergency preparednessPublished:non-conformities were identified during the audit. These comprised: Lack of passive fire protection Deficiencies in fire barriers for fire water and emergency power generators Missing headset for VHF in lifeboat
- Inspection report
- Barrier management
- Emergency preparedness
- Process safety
- Equinor
- Oseberg Øst
-
Equinor – Heidrun – management of emergency preparedness and helicopter operationsPublished:Equipment for dousing an engine fire was missing A fire hydrant was missing Helifuel pump cabinet sprinkler system was missing GA drawings of helideck - plan was not scaled Room for fire-resistant apparel for helideck
- Inspection report
- Emergency preparedness
- Equinor
- Heidrun
-
Dolphin – Borgland Dolphin – emergency preparedness and technical safetyPublished:Securing of equipment in normal operation Fire stations Training of the emergency response organisation on board Helideck Open drainage system Measures to combat fire Weaknesses in safety systems Governing
- Inspection report
- Emergency preparedness
- Technical safety
- Dolphin
- Borgland Dolphin
-
Altera Infrastructure Production AS – Petrojarl Knarr FPSO – electrical facilities, safety instrumented systems, process safety and technical safetyPublished:Rectification of previous non-conformities The ventilation systems Firefighting Passive fire protection Safety systems Evaluation of fire resistance Overview of status of safety systems – jumper logs Electrical facilities
- Inspection report
- Electrical installations
- Technical safety
- Vår Energi
- Petrojarl Knarr
-
Vår Energi – Jotun FPSO – modification projectPublished:Alternative to central control room Independence of emergency shutdown function Start-up arrangements for fire pump drives We also identified an improvement point concerning systematic follow-up of alarms. What
- Inspection report
- Process safety
- Risk management
- Electrical installations
- Jotun A
- Vår Energi
-
Gassco and Equinor – Kollsnes – process safety and technical safetyPublished:requirements Inadequate documentation Deficiencies in passive fire protection Suppression of explosion pressure Measures in the event of fire pumps being out of service Maintenance We also identified an
- Inspection report
- Process safety
- Kollsnes
- Equinor
- Gassco
-
Prosafe - Safe Scandinavia - Technical safety, maintenance management and emergency preparednessPublished:performance standards The maintenance system Pressure safety valves (PSV) Preservation Activation of fire extinguishing systems The emergency shutdown system Risk and emergency preparedness analyses Training
- Inspection report
- Maintenance management
- Technical safety
- Emergency preparedness
- Prosafe Offshore
- Safe Scandinavia
-
Det norske - Ivar Aasen - Barrier managementPublished:No non-conformities were identified. Improvement points were identified in connection with: Fire duration Fire barriers Ignition source control Det norske has been given a deadline of 7 August 2015 to report
- Inspection report
- Barrier management
- Det Norske
- Ivar Aasen
-
Statoil - Åsgard A - BarriersPublished:management Risk-reduction principles Risk analysis and emergency preparedness analysis Fire divisions Non-conformity handling Fire protection Ignition source control Gas detection In addition, seven improvement
- Inspection report
- Barrier management
- Risk management
- Statoil
- Åsgard A
-
Statoil - Johan Sverdrup - Barrier managementPublished:Measures for protecting rooms and equipment from fire We found six improvement points in the following areas: Firewater system Possible weakening of fire walls Preservation of electrical facilities and
- Inspection report
- Barrier management
- Process safety
- Technical safety
- Statoil
- Johan Sverdrup