Lundin - Leiv Eriksson - Pressure drillingPublished:the operator for production licence 492, in the Barents Sea, around 185 kilometres north-west of Hammerfest. Lundin has previously received consent to drill exploration well 7120/1-5 in a prospect named
- Audit report
- Well integrity
- Lundin
- Leiv Eiriksson
-
Vår Energi – Balder FPU – emergency preparednessPublished:Failure to update drawings Missing arrangements for rapid and efficient evacuation Deficiencies at fire stations Incompatible emergency preparedness tasks We also observed one factor that we have chosen
- Audit report
- Emergency preparedness
- Balder
- Vår Energi
-
Saipem – Scarabeo 8 – electrical installations, safety instrumented systems and technical safetyPublished:Missing ignition source decoupling of non EX-rated equipment on deck. Deficiencies in fire dampers, fire walls and fire doors Governing documents not updated Lack of activities for monitoring performance
- Audit report
- Electrical installations
- Technical safety
- Saipem
- Scarabeo 8
-
ConocoPhillips - Eldfisk 2/7 S - Development projectPublished:Non-conformities were identified in connection with: The fire water system Fire design loads In addition, improvement points were identified in connection with: Fire design loads Instructions for operating emergency
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Risk management
- ConocoPhillips
- Eldfisk S
-
Neptune Energy – Gjøa – Technical barriers and follow-up of condensate leakPublished:June 2017. Result Non-conformities were identified relating to: The fire water system Procedure for fracture calculations Passive fire protection Updated analyses and assessments In addition, improvement
- Audit report
- Structural safety
- Process safety
- Barrier management
- Technical safety
- Neptune Energy
- Gjøa
-
ExxonMobil - Balder FPU - BarrierPublished:connector deck The maintenance system The emergency shutdown system Passive fire protection of the gas emissions system Fire water Documentation ExxonMobil has been given a deadline of 30 June 2015 to
- Audit report
- Barrier management
- Technical safety
- Process safety
- Structural safety
- ExxonMobil
- Balder
-
Statoil Aasta Hansteen - Development projectPublished:non-conformity was identified in connection with fire barriers in the accommodation quarters. In addition, an improvement point was identified in connection with passive fire protection. Statoil has been given a deadline
- Audit report
- Statoil
-
Marathon Oil Norge AS - Alvheim FPSO - Technical and operational barriersPublished:The process safety system Passive fire protection Risk analysis In addition, an improvement point was identified in connection with: The emergency shutdown system Fire protection of pipelines and equipment
- Audit report
- Marathon
- Alvheim FPSO
-
Statoil - Troll C - Barrier management - Technical safety - Electrical systemsPublished:Non-conformities were identified in connection with: Pressure surges in the fire water system Design accident loads for fires Emergency shutdown and process safety systems Labelling of battery banks In
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Troll C
-
ExxonMobil - Ringhorne - Barrier managementPublished:requirements and penetrations in fire walls. We also found four improvement points. These included automatic fire water discharge in the event of confirmed gas detection, passive fire protection, gas detection
- Audit report
- Barrier management
- ExxonMobil
- Ringhorne
-
Equinor – Njord A – technical safety, process safety and electrical facilitiesPublished:non-conformities were identified during the audit. These comprised: passive fire protection response time of the fire water system manual fire water equipment follow-up marking in the field electrical facilities
- Audit report
- Process safety
- Technical safety
- Electrical installations
- Equinor
- Njord A
-
Equinor - Gudrun - BarriersPublished:loads for fires and of deficient non-conformity handling. We also identified improvement points linked to barrier management, passive fire protection, function testing of facilities for fire-fighting,
- Audit report
- Process safety
- Technical safety
- Electrical installations
- Barrier management
- Gudrun
- Equinor
- Statoil
-
Esso – Slagentangen – investigation of naphtha leakPublished:ignited and caused a fire in the pipestill. The absence of fire and gas detectors means that the detection of any ignition would have depended on its discovery by refinery personnel. A fire could potentially
- Investigation report
- Process safety
- Emergency preparedness
- Structural safety
- Esso Norge
- Slagentangen
-
COSL Drilling – COSLInnovator – electrical facilities, safety instrumented systems and technical safetyPublished:parts evaluation Maintenance Deficiencies in fire doors and fire walls Watertight HVAC valves Lack of monitoring and control of the safety integrity of fire and gas detectors in operation Work in electrical
- Audit report
- Electrical installations
- Technical safety
- COSL Drilling Europe
- COSL Innovator
-
Equinor – Heidrun – management of emergency preparedness and helicopter operationsPublished:Equipment for dousing an engine fire was missing A fire hydrant was missing Helifuel pump cabinet sprinkler system was missing GA drawings of helideck - plan was not scaled Room for fire-resistant apparel for helideck
- Audit report
- Emergency preparedness
- Equinor
- Heidrun
-
Dolphin – Borgland Dolphin – emergency preparedness and technical safetyPublished:Securing of equipment in normal operation Fire stations Training of the emergency response organisation on board Helideck Open drainage system Measures to combat fire Weaknesses in safety systems Governing
- Audit report
- Emergency preparedness
- Technical safety
- Dolphin
- Borgland Dolphin
-
Altera Infrastructure Production AS – Petrojarl Knarr FPSO – electrical facilities, safety instrumented systems, process safety and technical safetyPublished:Rectification of previous non-conformities The ventilation systems Firefighting Passive fire protection Safety systems Evaluation of fire resistance Overview of status of safety systems – jumper logs Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- Vår Energi
- Petrojarl Knarr
-
Equinor – Oseberg Øst – major accident risk, barriers and emergency preparednessPublished:non-conformities were identified during the audit. These comprised: Lack of passive fire protection Deficiencies in fire barriers for fire water and emergency power generators Missing headset for VHF in lifeboat
- Audit report
- Barrier management
- Emergency preparedness
- Process safety
- Equinor
- Oseberg Øst
-
Okea – Draugen – management of emergency preparednessPublished:accident situations System for follow-up of internal requirements Siting and equipping of fire stations Siting of fire cabinet on the helideck Maintenance of emergency response equipment Rescue capability
- Audit report
- Emergency preparedness
- Draugen
- OKEA
-
Statoil - Åsgard A - BarriersPublished:management Risk-reduction principles Risk analysis and emergency preparedness analysis Fire divisions Non-conformity handling Fire protection Ignition source control Gas detection In addition, seven improvement
- Audit report
- Barrier management
- Risk management
- Statoil
- Åsgard A