Consents
Operators must obtain consent from the regulator at important milestones.
Learn more about consents
Sorted by:
Most recently published
-
Equinor – consent for use of Floatel Superior at Grane for an extended periodPublished:The Petroleum Safety Authority Norway (PSA) has given Equinor Energy (Equinor) consent to use the Floatel Superior mobile accommodation facility at Grane for an extended period.
- Use of facility
-
Sval Energy – life extension for facilities on the Vale fieldPublished:The Petroleum Safety Authority Norway (PSA) has given Sval Energy (Sval) consent to use the facilities on the Vale field beyond their original lifespan.
- Lifespan
-
Equinor - consent to use Island Wellserver on the Norwegian continental shelfPublished:The Petroleum Safety Authority Norway (PSA) has given Equinor consent to use the mobile drilling facility Island Wellserver for light well interventio on the Norwegian continental shelf.
- Use of facility
-
Equinor - consent for exploration drilling in the North SeaPublished:The Petroleum Safety Authority Norway (PSA) has given Equinor consent for exploration drilling in block 35/10 in the North Sea.
- Exploration drilling
-
Aker BP - consent for exploration drilling in the North SeaPublished:The Petroleum Safety Authority Norway (PSA) has given Aker BP consent for exploration drilling in block 25/4 in the North Sea.
- Exploration drilling
-
Equinor - consent for exploration drilling in the North SeaPublished:The Petroleum Safety Authority Norway (PSA) has given Equinor consent for exploration drilling in block 34/6 in the North Sea.
- Exploration drilling
-
Equinor – consent to use pipelines and subsea production facilitiesPublished:The Petroleum Safety Authority Norway (PSA) has granted Equinor consent to use new pipelines and subsea production facilities on the Bauge field in block 6407/8 in the Norwegian Sea
- Use of facility
- Pipelines
-
Equinor – consent to use Floatel EndurancePublished:The Petroleum Safety Authority Norway (PSA) has granted Equinor consent to extend the use of Floatel Endurance as living quarters for the Johan Sverdrup phase 2 project.
- Use of facility
-
Equinor - consent to use Johan Sverdrup phase 2Published:The Petroleum Safety Authority Norway (PSA) has given Equinor consent for use of the entirety of Johan Sverdrup phase 2.
- Use of facility
-
Equinor - consent for extended operation of Mikkel subseaPublished:The Petroleum Safety Authority Norway (PSA) has given Equinor Energy AS (Equinor) consent for extended operation of the Mikkel field.
- Lifespan