Operator: Equinor

Field: Irpa

Facility: Transocean Norge

Additional information: The consent covers production drilling and completion of the wells 6705/10-A-4 H, 6705/10-A-2 H and 6705/10-A-3 H. The activity is part of the Irpa field development.

Irpa

Irpa lies in the Norwegian Sea, 80 kilometres west of the Aasta Hansteen field. The water depth is 1330 metres. Irpa was discovered in 2009, and the plan for development and operation (PDO) was approved in 2023. The development concept includes a subsea template with four slots tied-back to the existing Aasta Hansteen facility.

The field is under development. The production is planned to start in 2026.

Source: norskpetroleum.no