Operator: Equinor

Field: Johan Sverdrup

Other info:
The consent includes processing platform 2 (P2) and its direct current converter station (HVDC 2), changes to the riser platform (RP), a bridge between P2 and RP, changes to the Johan Sverdrup field for the integration of P2, RP and onshore DC, subsea equipment and in-field pipelines and subsea wells.