Consent for operation of Sygna expires on 31 December 2022.

We have now given consent for extended operation of the Sigyn field until 31 December 2032.

Sigyn

Sigyn is a field in the central part of the North Sea, 12 kilometres southeast of the Sleipner Øst field. The water depth in the area is 70 metres. Sigyn was discovered in 1982, and the plan for development and operation (PDO) was approved in 2001. The field is developed with a subsea template tied-back to Sleipner Øst. Production started in 2002.

Source: norskpetroleum.no