Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
ConocoPhillips – process for categorisation of wells in operationPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of ConocoPhillips’s process for the categorisation of wells in operation.
- Well integrity
-
Aker BP – Alvheim – planning and implementation of production drillingPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Aker BP and its planning and execution of production drilling using the Deepsea Nordkapp mobile facility for Kobra East and Gekko (KEG) on the Alvheim field.
- Well integrity
-
Order to Repsol – YmePublished:The PSA has issued an order to Repsol Norge after serious breaches of the regulations were identified during an audit of the company’s management of major accident risk and barriers for preventing and handling hydrocarbon leaks at Yme.
- Process safety
-
Equinor/Wood/Beerenberg – Grane – Management of working environment risk, materials handling and work at heightPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of the companies’ management of working environment risk, materials handling and work at height at the interface between Equinor, Wood and Beerenberg at Grane
- Working environment
- Handling, cranes and lifting
-
OKEA – Brage – structural integrity and surface treatmentPublished:
- Structural safety
-
Equinor – Irpa – production pipeline design and fabricationPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of the design and fabrication of the Irpa production pipeline.
- Structural safety
-
Odfjell Drilling – Deepsea Stavanger – maintenance managementPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Odfjell Drilling’s management of maintenance on Deepsea Stavanger.
- Maintenance management
-
Aker BP – Alvheim – control roomPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Aker BP and Human Factors (HF) in the control room in respect of new projects on board the Alvheim FPSO.
- Working environment
- Process safety
-
Equinor – Troll A – start-up and operation of production facilities and work on HC-carrying systemsPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor’s management of the start-up and operation of production facilities, as well as work on HC-carrying systems at Troll A.
- Process safety
-
Equinor – Johan Sverdrup – start-up and operationPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its application of experience from the start-up and operation of Johan Sverdrup phase 2.
- Process safety
- Risk management