BP Norge - Skarv FPSO - Management of loading operationsPublished:On 29 April 2014, the Petroleum Safety Authority Norway carried out an audit of BP Norge AS (BP)'s management of loading operations from Skarv FPSO to shuttle tankers.
- Structural safety
- Process safety
-
Statoil - Gina KrogPublished:On 25 and 26 March 2015, the Petroleum Safety Authority Norway carried out an audit of the design engineering of structures and maritime systems for Gina Krog.
- Structural safety
-
Teekay Petrojarl - Knarr FPSO - OHAS and logisticsPublished:From 30 March to 3 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Teekay Petrojarl (TKPJ) within the disciplines of OHAS and logistics on Knarr FPSO.
- Working environment
- Emergency preparedness
-
Maersk Drilling - Maersk Reacher - Alarm system in the drilling control roomPublished:On 18 and 27 March 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Maersk Drilling's follow-up of the alarm system in the drilling control room on Marsk Reacher.
-
Statoil - Kårstø - Major accident auditPublished:From 19 to 21 March 2014, the Petroleum Safety Authority Norway (PSA) performed a major accident audit at Kårstø.
- Process safety
- Risk management
-
Lundin - Edvard Grieg - Materials handling - Use and maintenance of lifting equipmentPublished:From 20 to 21 March 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Lundin Norway AS (Lundin) and the Edvard Grieg development.
- Barrier management
-
Eni - Goliat FPSO - Technical and operational barriersPublished:From 10 to 12 March 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of the work of Eni Norge AS (Eni) to ensure compliance with the requirement to establish and implement technical and operational barriers in the development project
-
Statoil - Gina Krog - Barrier managementPublished:Between 18 February and 7 March 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil's work to ensure compliance with the regulatory requirements for barrier management in the Gina Krog development project.
- Barrier management
- Risk management
- Technical safety
- Process safety
-
Statoil - Detailed engineering of the Polarled pipelinePublished:From 11 to 12 March 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of detailed engineering of the Polarled pipeline.
- Structural safety
-
Statoil - Norne FPSO - Emergency preparedness managementPublished:From 31 March to 2 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil and emergency preparedness management of the Norne FPSO.