Statoil – Kvitebjørn – emergency preparednessPublished:We have carried out an audit of Statoil and their emergency preparedness on the Kvitebjørn field.
- Emergency preparedness
-
Statoil - Hammerfest LNG - Cranes lifting and Working environmentPublished:From 7 to 9 March 2017, we carried an audit of the Hammerfest LNG plant.
- Working environment
- Handling, cranes and lifting
- Maintenance management
-
Gassco - Kårstø - Alarm load and Human factors in the main control roomPublished:We have carried out an audit of alarm load and human factors in the main control room at Kårstø.
- Working environment
- Process safety
-
Eni - Goliat - Work on hydrocarbon-carrying systemsPublished:We have carried out an audit of work on hydrocarbon-carrying systems on Goliat.
- Structural safety
- Working environment
- Well integrity
-
Statoil - Njord A - Design engineering and fabrication in connection with modificationsPublished:We have carried out an audit of design engineering and fabrication in connection with the modification of Njord A.
- Structural safety
-
Total - Martin Linge - Project phase and fabrication of the facility complyPublished:We have carried out an audit of the construction of the production facility for Martin Linge.
- Emergency preparedness
-
Total - Martin Linge - Planning and execution of drilling and well operationsPublished:During February and March 2017, we carried out an audit of Total E&P Norge AS's (Total) planning and execution of drilling and well operations at Martin Linge.
- Well integrity
-
ConocoPhillips - Management of emergency preparednessPublished:We have carried out an audit of ConocoPhillips's management of emergency preparedness during a period of streamlining processes.
- Emergency preparedness
-
Statoil - Statfjord - Late life safetyPublished:We have carried out an audit of how Statoil is following up the Statfjord facilities beyond their original planned lifetime.
- Well integrity
- Process safety
- Working environment
-
Statoil - Oseberg Vestflanken 2 - Design and fabrication of the control cablePublished:We have carried out an audit of the design and fabrication of the control cable for Oseberg Vestflanken 2.
- Structural safety
- Process safety