Audit reports
We publish all of our audit reports to facilitate learning and transfer of experience.
Read more about our supervision
Sorted by:
Most recently published
-
Archer – follow-up of certification and recertification of drilling BOPs with control functionsPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Archer's follow-up of certification and recertification of drilling BOPs with control functions.
- Process safety
- Risk management
-
Transocean – Transocean Enabler – stability and marine systemsPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of stability and marine systems on Transocean Enabler.
- Structural safety
-
Equinor – Statfjord A and C – helidecks and structuresPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor’s management and operation of helicopter operations and structures at Statfjord A and C.
- Structural safety
- Emergency preparedness
-
Vår Energi – Balder – handling of corrosion in process systems and falling structuresPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Vår Energi’s handling of corrosion in process systems and falling structures at Balder
- Structural safety
- Process safety
-
Odfjell Drilling – follow-up of and learning from incidentsPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Odfjell Drilling’s follow-up of incidents.
- Risk management
-
Order to Saipem – Scarabeo 8 – management of the working environment and operations in the drilling areasPublished:The PSA has carried out an audit of Saipem focused on the management of the working environment and operations in the drilling areas on Scarabeo 8. The audit identified serious regulatory breaches and we have now issued the company with an order.
- Working environment
-
Equinor – Statfjord C – working environment riskPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and their management of working environment risk at the Statfjord C facility.
- Working environment
-
Equinor – Hammerfest LNG – alarm load and workload in control room, and working hoursPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on alarm load and workload in the control room, as well as working hours at Hammerfest LNG.
-
Gassco – Kårstø – electrical facilitiesPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of Gassco and electrical facilities at Kårstø.
-
Transocean – Transocean Spitsbergen – helideckPublished:The Petroleum Safety Authority Norway (PSA) has carried out an audit of the management and operation of helicopter operations on Transocean Spitsbergen.
- Emergency preparedness
- Risk management