The audit was conducted from 26 to 29 January 2026.
Objective
The objective of the audit was to verify that Equinor’s management and follow-up of logistics and work at height at Gina Krog comply with the company’s and the authorities’ requirements.
Result
The audit identified four non-conformities in the following areas:
- Follow-up of the management system for materials handling and the safe use of lifting equipment
- Deck operators holding combined positions
- Overhead crane in the wellhead area
- Hose reel with pinch point hazard
In addition, we observed two factors that we have chosen to categorise as improvement points. These concerned:
- Temporary lifting equipment
- Rescue team for rescue at height
What happens now?
We have asked Equinor Energy AS to report to us by 10 August 2026 on how the non-conformities will be addressed and for their assessment of the improvement points observed.