The audit was conducted on 24 and 25 March 2026.
Objective
The objective of the audit was to verify that the helideck has been designed, equipped and maintained so as to contribute to safe helicopter operations and transport of personnel.
Result
Three non-conformities were identified, concerning:
- The chevron markings deviate from the design specifications for the helideck
- Inadequate marking of obstacles in the 150-degree obstacle-free sector
- Inadequate labelling in the dual-agent cabinet and incorrect labelling of status lights
No improvement points were identified.
What happens next?
We have asked Aker BP to report to us by 29 May 2026 on how the non-conformities will be addressed.