The audit was conducted on 19 November 2024.
Objective
The objective of the audit was to gain an overview of the follow-up and integrity management of infield steel pipelines, steel risers and control cables. We wanted to monitor how the integrity of the systems is followed up, and that a holistic approach to safe operation is assured.
Result
No non-conformities or improvement points were observed in this audit.