Objective
The objective of the audit was to verify whether the implementation of the selected solution with a control room in Trondheim is prudent and in compliance with the regulations.
Result
One non-conformity was identified in connection with the emergency shutdown system.
In addition, improvement points were identified in connection with:
- Risk reduction and continuous improvement
- The emergency preparedness analysis
- Communication analyses
- The security analysis
Aker BP has been given a deadline of 26 October 2018 to report on how the non-conformity and improvement points will be addressed.