Objective

The objective of the audit was to verify whether Statoil's management and monitoring of barriers at Troll C was in accordance with the company's and statutory requirements, so as to reduce the likelihood of failures.

Result

Non-conformities were identified in connection with:

  • Pressure surges in the fire water system
  • Design accident loads for fires
  • Emergency shutdown and process safety systems
  • Labelling of battery banks

In addition, improvement points were identified in connection with:

  • Response time for fire water
  • Risk reduction
  • Monitoring and control
  • Temporary equipment