What are you looking for?
4309 hits in Complete website
Filters
Subjects
Year
-
Equinor – Johan Castberg – cranes, lifting equipment and materials handlingPublished:
- Inspection report
- Handling, cranes and lifting
- Emergency preparedness
- Structural safety
- Risk management
- Johan Castberg
- Equinor
-
AoC audit – Odfjell Drilling AS – Deepsea Aberdeen – drilling facility and maintenancePublished:
- Inspection report
- Well integrity
- Risk management
- Maintenance management
- Odfjell Drilling AS
- Deepsea Aberdeen
-
Equinor - Heidrun - logisticsPublished:
- Inspection report
- Emergency preparedness
- Equinor
- Heidrun
-
Order to Beerenberg – audit of temporary hiresPublished:
- Inspection report
-
Equinor - construction of substructures for Hywind TampenPublished:
- Inspection report
- Structural safety
- Equinor
-
Equinor – Johan Castberg – integrity of structures and maritime systemsPublished:
- Inspection report
- Structural safety
- Equinor
- Johan Castberg
-
Aker BP – audit of hiringPublished:
- Inspection report
- Working environment
- Aker BP
-
Lundin – management of risk associated with the integration between industrial ICT systems and digitalisation solutionsPublished:
- Inspection report
- Cyber security
- Risk management
- Lundin
-
ConocoPhillips – follow-up of vessels with emergency response functionsPublished:
- Inspection report
- Emergency preparedness
- ConocoPhillips
-
Seadrill – West Mira – electrical facilities and technical safetyPublished:
- Inspection report
- Electrical installations
- Process safety
- Technical safety
- Seadrill
- West Mira
-
Equinor – Johan Sverdrup phase 2 – overpressure protection of inlet arrangements and leak detection for subsea facilitiesPublished:
- Inspection report
- Equinor
-
Aker BP, ExxonMobil, Gassco and Statoil - Manned underwater operationsPublished:
- Consent
- Diver-assisted underwater operations
-
ConocoPhillips - Disposal of facilities on the Ekofisk fieldPublished:
- Consent
- Removal phase
-
AkerBP - Removal of emergency response vessel at the Alvheim fieldPublished:
- Consent
- Removal phase
-
ConocoPhillips - Preparations for and start of removal - EkofiskPublished:
- Consent
- Removal phase
-
Gassco - Use of PolarledPublished:
- Consent
- Pipelines
- Use of facility
-
Statoil - Modifications at SleipnerPublished:
- Consent
- Operations, maintenance, modifications
-
Statoil - Use of Sigyn subsea facilitiesPublished:
- Consent
- Use of facility
-
Statoil - Modification, installation and start-up of ZMP module at Troll BPublished:
- Consent
- Operations, maintenance, modifications
-
Statoil - Modifications at HeidrunPublished:
- Consent
- Operations, maintenance, modifications