Transocean – Transocean Norge – emergency preparedness and technical safetyPublished:routes Maintenance Equipment in MOB boat Marking of escape routes Barrier management Passive fire protection Fire protection systems Open drainage system One factor was also observed that we have chosen to
- Audit report
- Emergency preparedness
- Technical safety
- Transocean Offshore Ltd
- Transocean Norge
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Audit report
- Structural safety
- Neptune Energy
- Gjøa
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Audit report
- Barrier management
- Risk management
- Aker BP
-
Norske Shell – Draugen – technical safety and surface protectionPublished:Result Four non-conformities were identified, relating to: Assessment of the worst credible process fire Performance requirements Testing of the firewater system Warning and notification of hazard and accident
- Audit report
- Shell
- ShellEnterprise
- Draugen
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Audit report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Audit report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Audit report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Equinor - Troll C - Technical safetyPublished:Troll C. Result Six non-conformities were identified, relating to: Follow-up and overview of passive fire protection Lighting in the emergency hospital and back-up emergency hospital Automatic actions in
- Audit report
- Technical safety
- Statoil
- Troll C
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Audit report
- Barrier management
- Equinor
- Oseberg A
-
Re § 43 Emergency preparedness vesselsloading and unloading of recovered oil, operation in areas where there is a risk of explosion and fire. Aircraft that are to be used in actions against acute pollution, should be designed so that they
- Guideline
- The facilities regulations
-
Re § 20 Chemicals and chemical exposurecomponents. For use of chemicals, see Section 48 of these regulations. For design and placement as regards fire and explosion hazard as mentioned in the second subsection, litera c, reference is made to Section
- Guideline
- Technical and operational regulations
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
Re § 33 Emergency shutdown systemshould be used. The requirement for independence as mentioned in the first subsection, implies that the fire and gas detection system comes in addition to systems for management and control and other safety
- Guideline
- Technical and operational regulations
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Audit report
- Emergency preparedness
- Equinor
- Heidrun
-
Ignition control: Is it possible to ignite a spark by radio waves?Published:spart or a jump spark. In facilities handling petroleum where there are flammable gasses and potential fire hazards, it is critical to control all potential ignition sources.
- News
- Technical safety
- Process safety
-
Ignition control: Is it possible to ignite a spark by radio waves?Published:spart or a jump spark. In facilities handling petroleum where there are flammable gasses and potential fire hazards, it is critical to control all potential ignition sources.
- Video
- Technical safety
- Barrier management
- Electrical installations
- Learning
-
Enclosed modules, design and explosion pressurePublished:common measure for protecting the working environment and equipment in the High North. Enclosure and fire development are included in the remit. The project aims to achieve a better understanding of the degree
- Project report
- Process safety
- High north
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Audit report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B
- Oseberg D
-
Wintershall - Brage - Barrier managementPublished:addition, improvement points were detected in connection with: Inspection history for penetrations in fire walls Facility-specific information in performance standards WINO has been given a deadline of 2 January
- Audit report
- Process safety
- Wintershall
- Brage
-
Total E&P - Martin Linge - FSO Modification projectPublished:Improvement points were identified in connection with: Risk analysis (QRA) Design Performance requirements Fire divisions
- Audit report
- Process safety
- Technical safety
- Total E&P Norge