Equinor – Åsgard B – process safety, technical safety, maintenance management and risk managementPublished:non-conformities. These comprised: Deficient follow-up Consequences of worst credible process fire Testing and follow-up of the fire water system We also found improvement points within the following areas: Risk identification
- Inspection report
- Maintenance management
- Technical safety
- Risk management
- Process safety
- Equinor
- Åsgard B
-
Gassco - Draupner S/E - Processing facility and the transport systemPublished:process safety. In addition, improvement points were identified in connection with: Fire protection Ruptures in the event of fire Weaknesses in the plant Control and monitoring system Nitrogen flushing of the
- Inspection report
- Process safety
- Handling, cranes and lifting
- Gassco
- Draupner
-
Equinor – Oseberg – barrier managementPublished:The audit identified four non-conformities. These concerned: Consequences of worst credible process fire (WCPF) Lack of independence between emergency shutdown and process safety systems for well valves
- Inspection report
- Barrier management
- Equinor
- Oseberg A
-
Aker BP – Ula – major accident risk, barriers and maintenancePublished:reduction Labelling of equipment Closing mechanism for fire doors In addition, improvement points were identified relating to: Manning Passive fire protection of fluid outlet separators Maintenance What
- Inspection report
- Barrier management
- Risk management
- Aker BP
-
Neptune – Gjøa – integrity of structures and maritime systemsPublished:were identified in the following areas: Documentation of capacity in accident limit state Passive fire protection Assumptions for use of the facility Follow-up of suppliers In addition, an improvement
- Inspection report
- Structural safety
- Neptune Energy
- Gjøa
-
Rowan Norway - Rowan Gorilla VI - Maintenance management, logistics (cranes and lifting), drilling and well technology, and emergency preparednessPublished:Preservation of equipment Pipe handling deck Loading and storage deck for helifuel Evacuation routes Fire stations and fire-fighting equipment In addition, improvement points were identified in connection with: Roles
- Inspection report
- Maintenance management
- Handling, cranes and lifting
- Well integrity
- Emergency preparedness
- Rowan
- Rowan Gorilla VI
-
Equinor – Statfjord C – barrier management – electrical facilities and technical safetyPublished:Documentation Maintenance programme for the emergency shutdown system Fire doors and passive fire protection Response time of the fire water system In addition, we observed two factors that we have chosen
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Equinor
- Statfjord C
-
§ 6 Definitionsassociated pipeline systems, as well as the spare gas power plant at Nyhamna, the gas power plants at Hammerfest, Skogn and Grenland and their associated pipeline systems, including those parts of the onshore
- Paragraph
- The framework regulations
-
Regulations relating to health, safety and the environment in the petroleum activities and at certain onshore facilities2002 No. 20 relating to protection against fire, explosion and accidents involving dangerous substances and relating to the fire department's rescue tasks (the Fire and Explosion Protection Act), Sections
- Regulation
-
Equinor – Heidrun – helideck operationsPublished:transport of personnel. Result We identified three non-conformities during the audit. These concerned: Fire and rescue preparedness Condition and maintenance of the DAHR system Handling of hazard and accident
- Inspection report
- Emergency preparedness
- Equinor
- Heidrun
-
§ 5 Design of facilitiesRegulations. The facilities shall be divided into main areas. The main areas shall be separated by fire and explosion divisions or sufficient physical distance to prevent escalation. Alternatively, a combination
- Paragraph
- The facilities regulations
-
Re § 8 Structures and materialsthe NORSOK M-004 standard can be used as a basis. When selecting materials with regard to technical fire qualities as mentioned in litera d, non-flammable materials should be chosen. In those cases where
- Guideline
- Technical and operational regulations
-
Re § 34 Process safety systemssystems 34 The requirement for independence as mentioned in the first subsection, implies that the fire and gas detection system comes in addition to systems for management and control and other safety
- Guideline
- Technical and operational regulations
-
§ 7 Main safety functionsaccident situation: preventing escalation of accident situations so that personnel outside the immediate fire area are not injured, the capacity of main load-bearing structures until the facility has been evacuated
- Paragraph
- The facilities regulations
-
Ignition control: Is it possible to ignite a spark by radio waves?Published:spart or a jump spark. In facilities handling petroleum where there are flammable gasses and potential fire hazards, it is critical to control all potential ignition sources.
- News
- Technical safety
- Process safety
-
Ignition control: Is it possible to ignite a spark by radio waves?Published:spart or a jump spark. In facilities handling petroleum where there are flammable gasses and potential fire hazards, it is critical to control all potential ignition sources.
- Video
- Technical safety
- Barrier management
- Electrical installations
- Video
-
Enclosed modules, design and explosion pressurePublished:common measure for protecting the working environment and equipment in the High North. Enclosure and fire development are included in the remit. The project aims to achieve a better understanding of the degree
- Project report
- Process safety
- High north
-
Total E&P - Martin Linge - FSO Modification projectPublished:Improvement points were identified in connection with: Risk analysis (QRA) Design Performance requirements Fire divisions
- Inspection report
- Process safety
- Technical safety
- Total E&P Norge
- Martin Linge
-
Wintershall - Brage - Barrier managementPublished:addition, improvement points were detected in connection with: Inspection history for penetrations in fire walls Facility-specific information in performance standards WINO has been given a deadline of 2 January
- Inspection report
- Process safety
- Wintershall
- Brage
-
Statoil - Oseberg - Electrical installationsPublished:Testing of emergency power system Maintenance management Deck gratings made from composite materials Fire barriers and ignition source control
- Inspection report
- Electrical installations
- Statoil
- Oseberg A
- Oseberg B
- Oseberg D