What are you looking for?
240 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:with short circuit and fire pump breakdown The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a transformer short circuit and a fire pump breakdown on the
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Equinor – Statfjord A – Investigation of incident involving fire and fumes in tankPublished:incident involving fire and fumes in tank The Norwegian Ocean Industry Authority (Havtil) has concluded its investigation of an incident which occurred on 17 April 2024 involving fire and fumes in a tank
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Equinor
- Statfjord A
-
Eni Norge - Goliat FPSO - Technical and operational barriersPublished:operational organisation at Hammerfest. On 7 and 8 May 2015, the Petroleum Safety Authority Norway carried out an audit of Eni Norge (Eni)'s operational organisation at Hammerfest. The objective of the audit
- Audit report
- Barrier management
- Eni Norge
- Goliat FPSO
-
Equinor – Gullfaks A – technical safety and process safetyPublished:firewater system Deficient follow-up of firefighting installations Deficient follow-up of passive fire protection Deficient follow-up of assumptions made and outcomes achieved What happens next? We have
- Audit report
- Process safety
- Technical safety
- Equinor
- Gullfaks A
-
Aker BP – Valhall PWP – electrical facilitiesPublished:were identified in the following areas: Lack of documentation of risk assessment related to early fire detection in switchboard rooms Inadequate documentation of verification of the safety function of
- Audit report
- Electrical installations
- Process safety
- Valhall DP
- Aker BP
-
Equinor – Kvitebjørn – process safetyPublished:instrumented functions Deficiencies in overpressure protection Deficiencies in the compartmentalisation of fire areas Deficiencies in maintenance programme Deficiencies in classification Deficiencies in the independence
- Audit report
- Process safety
- Risk management
- Equinor
-
Eni - Goliat FPSO - Technical and operational barriersPublished:management Fire-fighting strategy The need for and the role of the "Stop Blowdown" function The cooling water system for the emergency generator unit Ventilation in the cargo pump room Fire water supply
- Audit report
- Eni Norge
- Goliat FPSO
-
Equinor – Tjeldbergodden – management of emergency preparedness and major accidentsPublished:Deficient documentation of training in the use of refilling apparatus for breathing air cylinders Fire equipment cabinet not properly maintained What happens now? We have asked Equinor to report to us
- Audit report
- Emergency preparedness
- Equinor
- Tjeldbergodden
-
ConocoPhillips - Ekofisk - Corrosion under insulation (CUI)Published:Corrosion under insulation (CUI) From 20 August to 5 September 2018, we carried out an audit of passive fire protection, corrosion under insulation (CUI) including surface treatment and repairs under insulation
- Audit report
- Process safety
- Structural safety
- ConocoPhillips
- Ekofisk J
-
Eni - Goliat - Safety instrumented systemsPublished:presentations and interviews with project coordinators at the Goliat operational organisation at Hammerfest and interviews with technical staff at Eni's head office in Stavanger. Result The audit identified
- Audit report
- Process safety
- Eni Norge
- Goliat FPSO
-
Statoil - Gina Krog - Barrier managementPublished:identified in connection with: Fire design loads The fire water system In addition, improvement points were identified in connection with: Risk management Barrier management system Fire divisions Partitioning
- Audit report
- Barrier management
- Risk management
- Technical safety
- Process safety
- Statoil
- Gina Krog
-
Saipem – Scarabeo 8 – electrical installations, safety instrumented systems and technical safetyPublished:Missing ignition source decoupling of non EX-rated equipment on deck. Deficiencies in fire dampers, fire walls and fire doors Governing documents not updated Lack of activities for monitoring performance
- Audit report
- Electrical installations
- Technical safety
- Saipem
- Scarabeo 8
-
Statoil - Valemon - Barrier management - Technical safety - Electrical installationsPublished:Heating cables Fire areas Fire divisions In addition, six improvement points were identified in connection with: Explosion overpressure Ignition source control Isolation plan Passive fire protection Documentation
- Audit report
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Valemon
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:with: The fire water system Penetrations in fire walls Noise exposure Chemical health hazards In addition, improvement points were identified in connection with: Inspection of penetrations in fire walls Updating
- Audit report
- Working environment
- Process safety
- Statoil
- Statfjord C
-
Lundin - Leiv Eriksson - Pressure drillingPublished:the operator for production licence 492, in the Barents Sea, around 185 kilometres north-west of Hammerfest. Lundin has previously received consent to drill exploration well 7120/1-5 in a prospect named
- Audit report
- Well integrity
- Lundin
- Leiv Eiriksson
-
Eni Norge - Goliat FPSO - Emergency preparednessPublished:Goliat field, located on the Tromsøflaket bank in the Barents Sea around 85 kilometres north-west of Hammerfest. The field will be developed using a floating production, storage and offloading (FPSO) vessel
- Audit report
- Emergency preparedness
- Eni Norge
- Goliat FPSO
-
GDF SUEZ - Gjøa - Barrier management, process safety, technical safety and electrical installationsPublished:in connection with the fire water system. In addition, improvement points were identified in connection with: • Governing documents • Risk analysis • Ignition source control • Fire resistance of deck grating
- Audit report
- Barrier management
- Process safety
- Technical safety
- Electrical installations
- Gjøa
- GDF Suez
-
Statoil - Mongstad - Technical safetyPublished:detection system Depressurisation and potential for isolating the LPG installation Fire monitors in the LPG installation Fire protection ESD valves Performance requirements of barriers A number of less serious
- Audit report
- Technical safety
- Process safety
- Statoil
- Mongstad
-
BP - Valhall - Process safety and technical safetyPublished:improvement points were identified in connection with: The emergency shutdown system Passive fire protection Fire water triggering The maintenance system Safety systems
- Audit report
- Process safety
- Technical safety
- BP
- Valhall DP
-
Lundin - Edvard Grieg - Technical barriersPublished:Penetrations in fire walls Follow-up of performance requirements for check valves and safety-critical heating cables Three improvement points were identified in connection with: Passive fire protection Governing
- Audit report
- Barrier management
- Lundin
- Edvard Grieg