Equinor – Åsgard B – investigation of incident with firePublished:– Åsgard B – investigation of incident with fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a fire in a high-voltage transformer on the Åsgard
- Investigation report
- Electrical installations
- Technical safety
- Emergency preparedness
- Equinor
- Åsgard B
-
Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:with short circuit and fire pump breakdown The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a transformer short circuit and a fire pump breakdown on the
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental dataPublished:– Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental data Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under
- Audit report
- Structural safety
- Technical safety
- Equinor
- Johan Sverdrup
-
Equinor – Statfjord A – Investigation of incident involving fire and fumes in tankPublished:incident involving fire and fumes in tank The Norwegian Ocean Industry Authority (Havtil) has concluded its investigation of an incident which occurred on 17 April 2024 involving fire and fumes in a tank
- Investigation report
- Working environment
- Emergency preparedness
- Process safety
- Equinor
- Statfjord A
-
Eni Norge - Goliat FPSO - Technical and operational barriersPublished:operational organisation at Hammerfest. On 7 and 8 May 2015, the Petroleum Safety Authority Norway carried out an audit of Eni Norge (Eni)'s operational organisation at Hammerfest. The objective of the audit
- Audit report
- Barrier management
- Eni Norge
- Goliat FPSO
-
Gassco – Nyhamna – electrical facilitiesPublished:electrical facilities An improvement point was also identified concerning risk assessment related to fires in switchrooms. What happens next? We have asked Gassco to report to us by 31 August 2026 on how the
- Audit report
- Process safety
- Risk management
- Gassco
- Nyhamna
-
Gassco – Draupner – electrical facilities, technical safety and process safetyPublished:Result The audit identified six regulatory non-conformities. These concerned: Deficiencies in the fixed fire suppression facility on Draupner S and Draupner E Inadequate compliance with internal requirements
- Audit report
- Process safety
- Gassco
- Draupner
-
Aker BP – Munin and SOV – emergency preparedness, telecommunications, technical safety and logisticsPublished:safe operation. Equipotential bonding and cable glands on Munin. Risk assessment related to early fire detection in switchboard room. Performance requirements for evacuation from crane cabin to W2W vessel
- Audit report
- Process safety
- Emergency preparedness
- Technical safety
- Aker BP
-
Eni - Goliat FPSO - Technical and operational barriersPublished:management Fire-fighting strategy The need for and the role of the "Stop Blowdown" function The cooling water system for the emergency generator unit Ventilation in the cargo pump room Fire water supply
- Audit report
- Eni Norge
- Goliat FPSO
-
ConocoPhillips - Ekofisk - Corrosion under insulation (CUI)Published:Corrosion under insulation (CUI) From 20 August to 5 September 2018, we carried out an audit of passive fire protection, corrosion under insulation (CUI) including surface treatment and repairs under insulation
- Audit report
- Process safety
- Structural safety
- ConocoPhillips
- Ekofisk J
-
Statoil - Gina Krog - Barrier managementPublished:identified in connection with: Fire design loads The fire water system In addition, improvement points were identified in connection with: Risk management Barrier management system Fire divisions Partitioning
- Audit report
- Barrier management
- Risk management
- Technical safety
- Process safety
- Statoil
- Gina Krog
-
Equinor – Snorre B – emergency preparedness and helideckPublished:210° obstacle-free approach and take-off sector Helideck data Friction arrangements on the helideck Fire extinguishing system on the helideck Missing anemometer We also observed three factors we have chosen
- Audit report
- Emergency preparedness
- Equinor
- Snorre B
-
Eni - Goliat - Safety instrumented systemsPublished:presentations and interviews with project coordinators at the Goliat operational organisation at Hammerfest and interviews with technical staff at Eni's head office in Stavanger. Result The audit identified
- Audit report
- Process safety
- Eni Norge
- Goliat FPSO
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:with: The fire water system Penetrations in fire walls Noise exposure Chemical health hazards In addition, improvement points were identified in connection with: Inspection of penetrations in fire walls Updating
- Audit report
- Working environment
- Process safety
- Statoil
- Statfjord C
-
Statoil - Valemon - Barrier management - Technical safety - Electrical installationsPublished:Heating cables Fire areas Fire divisions In addition, six improvement points were identified in connection with: Explosion overpressure Ignition source control Isolation plan Passive fire protection Documentation
- Audit report
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Valemon
-
BP - Valhall - Process safety and technical safetyPublished:improvement points were identified in connection with: The emergency shutdown system Passive fire protection Fire water triggering The maintenance system Safety systems
- Audit report
- Process safety
- Technical safety
- BP
- Valhall DP
-
Lundin - Edvard Grieg - Technical barriersPublished:Penetrations in fire walls Follow-up of performance requirements for check valves and safety-critical heating cables Three improvement points were identified in connection with: Passive fire protection Governing
- Audit report
- Barrier management
- Lundin
- Edvard Grieg
-
Statoil - Mongstad - Technical safetyPublished:detection system Depressurisation and potential for isolating the LPG installation Fire monitors in the LPG installation Fire protection ESD valves Performance requirements of barriers A number of less serious
- Audit report
- Technical safety
- Process safety
- Statoil
- Mongstad
-
GDF SUEZ - Gjøa - Barrier management, process safety, technical safety and electrical installationsPublished:in connection with the fire water system. In addition, improvement points were identified in connection with: • Governing documents • Risk analysis • Ignition source control • Fire resistance of deck grating
- Audit report
- Barrier management
- Process safety
- Technical safety
- Electrical installations
- Gjøa
- GDF Suez
-
Vår Energi – Balder FPU – emergency preparednessPublished:Failure to update drawings Missing arrangements for rapid and efficient evacuation Deficiencies at fire stations Incompatible emergency preparedness tasks We also observed one factor that we have chosen
- Audit report
- Emergency preparedness
- Balder
- Vår Energi