What are you looking for?
230 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
COSL Drilling – COSLInnovator – electrical facilities, safety instrumented systems and technical safetyPublished:parts evaluation Maintenance Deficiencies in fire doors and fire walls Watertight HVAC valves Lack of monitoring and control of the safety integrity of fire and gas detectors in operation Work in electrical
- Inspection report
- Electrical installations
- Technical safety
- COSL Drilling Europe
- COSL Innovator
-
Equinor – Gudrun – technical safety and process safetyPublished:in the following areas: Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also observed one factor that we have chosen to categorise as an improvement
- Inspection report
- Technical safety
- Process safety
- Equinor
- Gudrun
-
Eni - Goliat FPSO - Technical and operational barriersPublished:management Fire-fighting strategy The need for and the role of the "Stop Blowdown" function The cooling water system for the emergency generator unit Ventilation in the cargo pump room Fire water supply
- Inspection report
- Eni Norge
- Goliat FPSO
-
Equinor – Troll C – technical safety, process safety and electrical facilitiesPublished:out maintenance programme Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also identified four improvement points concerning: Documentation Marking
- Inspection report
- Process safety
- Electrical installations
- Technical safety
- Troll C
- Equinor
-
ConocoPhillips - Ekofisk - Corrosion under insulation (CUI)Published:Corrosion under insulation (CUI) From 20 August to 5 September 2018, we carried out an audit of passive fire protection, corrosion under insulation (CUI) including surface treatment and repairs under insulation
- Inspection report
- Process safety
- Structural safety
- ConocoPhillips
- Ekofisk J
-
Eni - Goliat - Safety instrumented systemsPublished:presentations and interviews with project coordinators at the Goliat operational organisation at Hammerfest and interviews with technical staff at Eni's head office in Stavanger. Result The audit identified
- Inspection report
- Process safety
- Eni Norge
- Goliat FPSO
-
Statoil - Gina Krog - Barrier managementPublished:identified in connection with: Fire design loads The fire water system In addition, improvement points were identified in connection with: Risk management Barrier management system Fire divisions Partitioning
- Inspection report
- Barrier management
- Risk management
- Technical safety
- Process safety
- Statoil
- Gina Krog
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:with: The fire water system Penetrations in fire walls Noise exposure Chemical health hazards In addition, improvement points were identified in connection with: Inspection of penetrations in fire walls Updating
- Inspection report
- Working environment
- Process safety
- Statoil
- Statfjord C
-
Statoil - Valemon - Barrier management - Technical safety - Electrical installationsPublished:Heating cables Fire areas Fire divisions In addition, six improvement points were identified in connection with: Explosion overpressure Ignition source control Isolation plan Passive fire protection Documentation
- Inspection report
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Valemon
-
Eni Norge - Goliat FPSO - Emergency preparednessPublished:Goliat field, located on the Tromsøflaket bank in the Barents Sea around 85 kilometres north-west of Hammerfest. The field will be developed using a floating production, storage and offloading (FPSO) vessel
- Inspection report
- Emergency preparedness
- Eni Norge
- Goliat FPSO
-
Statoil - Mongstad - Technical safetyPublished:detection system Depressurisation and potential for isolating the LPG installation Fire monitors in the LPG installation Fire protection ESD valves Performance requirements of barriers A number of less serious
- Inspection report
- Technical safety
- Process safety
- Statoil
- Mongstad
-
GDF SUEZ - Gjøa - Barrier management, process safety, technical safety and electrical installationsPublished:in connection with the fire water system. In addition, improvement points were identified in connection with: • Governing documents • Risk analysis • Ignition source control • Fire resistance of deck grating
- Inspection report
- Barrier management
- Process safety
- Technical safety
- Electrical installations
- Gjøa
- GDF Suez
-
BP - Valhall - Process safety and technical safetyPublished:improvement points were identified in connection with: The emergency shutdown system Passive fire protection Fire water triggering The maintenance system Safety systems
- Inspection report
- Process safety
- Technical safety
- BP
- Valhall DP
-
Lundin - Edvard Grieg - Technical barriersPublished:Penetrations in fire walls Follow-up of performance requirements for check valves and safety-critical heating cables Three improvement points were identified in connection with: Passive fire protection Governing
- Inspection report
- Barrier management
- Lundin
- Edvard Grieg
-
Lundin - Leiv Eriksson - Pressure drillingPublished:the operator for production licence 492, in the Barents Sea, around 185 kilometres north-west of Hammerfest. Lundin has previously received consent to drill exploration well 7120/1-5 in a prospect named
- Inspection report
- Well integrity
- Lundin
- Leiv Eiriksson
-
ConocoPhillips - Eldfisk 2/7 S - Development projectPublished:Non-conformities were identified in connection with: The fire water system Fire design loads In addition, improvement points were identified in connection with: Fire design loads Instructions for operating emergency
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Risk management
- ConocoPhillips
- Eldfisk S
-
Neptune Energy – Gjøa – Technical barriers and follow-up of condensate leakPublished:June 2017. Result Non-conformities were identified relating to: The fire water system Procedure for fracture calculations Passive fire protection Updated analyses and assessments In addition, improvement
- Inspection report
- Structural safety
- Process safety
- Barrier management
- Technical safety
- Neptune Energy
- Gjøa
-
Statoil - Troll C - Barrier management - Technical safety - Electrical systemsPublished:Non-conformities were identified in connection with: Pressure surges in the fire water system Design accident loads for fires Emergency shutdown and process safety systems Labelling of battery banks In
- Inspection report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Troll C
-
Marathon Oil Norge AS - Alvheim FPSO - Technical and operational barriersPublished:The process safety system Passive fire protection Risk analysis In addition, an improvement point was identified in connection with: The emergency shutdown system Fire protection of pipelines and equipment
- Inspection report
- Marathon
- Alvheim FPSO
-
ExxonMobil - Balder FPU - BarrierPublished:connector deck The maintenance system The emergency shutdown system Passive fire protection of the gas emissions system Fire water Documentation ExxonMobil has been given a deadline of 30 June 2015 to
- Inspection report
- Barrier management
- Technical safety
- Process safety
- Structural safety
- ExxonMobil
- Balder